Engineering PapersSearch

SEARCH · Engineering Papers

Results for “relays”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Considerations for an Earth Relay Satellite with RF and Optical Trunklines

Support for user platforms through the use of optical links to geosynchronous relay spacecraft are expected to be part of the future space communications architecture. The European Data Relay Satellite System (EDRS) has its first node, EDRS-A, in orbit. The EDRS architecture includes space-to-space optical links with a Ka-Band feeder link or trunkline. NASA's Laser Communications Relay Demonstration (LCRD) mission, originally baselined to support a space-to-space optical link relayed with an optical trunkline, has added an Radio Frequency (RF) trunkline. The use of an RF trunkline avoids the outages suffered by an optical trunkline due to clouds, but an RF trunkline will be bandwidth limited. A space relay architecture with both RF and optical trunklines could relay critical realtime data, while also providing a high data volume capacity. This paper considers the relay user scenarios that could be supported, and the implications to the space relay system and operations. System trades such as the amount of onboard processing and storage required, the use of link layer switching vs. network layer routing, and the use of Delay/Disruption Tolerant Networking (DTN) are discussed.

Space Communications

Mars Cube One (MarCO) Shifting the Paradigm in Relay Deep Space Operations

A very significant challenge in the planetary mission design and operations is communications with ground control teams during critical events and highly risky maneuvers. These include entry, descent, and landing (EDL) and orbit insertion, which should not be carried out in the blind. Although vast planetary distances and long round-trip light times disallow real-time intervention from controllers, acquiring the relevant event performance parameters in near real-time can be imperative for determining the corrective actions needed immediately following or, in the case of significant anomalies, aid in the diagnostic analysis. During several previous Mars missions landing events, and the Huygens probe landing on Titan, the communications strategy relied on proximity links to planetary orbiters, which then relayed the data to the Deep Space Network (DSN). In addition, attempts were successfully made in parallel to receive the signal carrier directly at Earth often using large radio telescopes when the wavelength was outside the DSN’s reception bands. This Direct-to-Earth (DTE) back-up method was only possible due to special techniques utilizing the DSN’s open-loop Radio Science Receivers. In every case, it was very challenging since the link budget of a landing vehicles were designed for proximity orbiter relays and not for distances across the solar system. A new method is introduced since not all future missions can rely on the presence of pre-existing orbiters at their planetary targets to relay their critical data ad, furthermore, most missions would not likely have the resources to implement a reliable DTE link at acceptable data rates, bypassing a need for a relay asset. With the advent CubeSat form-factor spacecraft, one or more, for added reliability, CubeSats can be launched with the primary mission, travel to the target, and be positioned to view the critical event, such as EDL, and carry out real-time relay of the data to the DSN at higher rates. CubeSats have flown in the Earth environment but never flown or been operated in deep space or planetary environment so careful design as well as flight experience are needed. The relay function requires the development of radio and antenna systems to meet challenging specifications. After initial technical demonstration of the concept and operational experience, the cost can decrease as systems become more standardized with increased reliability. This paper describes the invention of the “carry your own relay” concept and the formulation of the mission likely to be the first planetary CubeSat mission called Mars Cube One (MarCO). It also describes the operational concept of relay small spacecraft and their role reducing mission risk as well as overall mission cost.

Asmar, Sami

Lunar Relay Coverage Analysis for RF and Optical Links

This paper describes our effort in searching different lunar relay architectures and assessing their coverage performance and other pros and cons for RF and optical links. Regarding RF links, we considered three notional lunar relay architectures, all communicating with the three sites of the Deep Space Network (DSN): Goldstone, California; Canberra, Australia; and Madrid, Spain: 1) A constellation of three relay orbiters: two at the Polar frozen elliptical orbits, and one at an equatorial circular orbit. 2) One relay orbiter in a 74-day Lissajous orbit at Earth-Moon Lagrange Point L2. 3) One relay orbiter in a 14-day Lunar distance retrograde orbit. Regarding optical link, we considered a notional multi-hop relay architecture that consists of one relay orbiter in a 74-day Lissajous orbit at Earth-Moon L2 (as in architecture #2 in the RF case), three Near-Earth relay satellites in geosynchronous orbit at longitudes 187° E, 110° E, and 347° E, and three ground stations at White Sands (US), Guam (US), and Tenerife (Spain). We introduce the additional constraints of Sun-“Earth”Probe (SEP) angle for return links, and Sun-Probe-“Earth” (SPE) angle for forward links. SPE and SPE angles determine the amount of sunlight (noise) that goes into the detector of the telescope, thus affecting the capacity of an optical link.

Lee, Charles

Lunar Relay Onboard Navigation Performance and Effects on Lander Descent to Surface

A system of Lunar relay satellites has been proposed to address communication and navigation needs and ensure robustness for the variety of upcoming robotic and human exploration missions to the Moon. The relays are envisioned to estimate self position and time knowledge onboard, allowing the system to provide in-situ navigation services to missions in the Lunar and cis-Lunar environment. The quality and accuracy of those services are highly dependent on the navigation performance of the relay itself. To assess the Lunar relay navigation performance, a series of orbit determination (OD) Monte Carlo (MC) simulations are run using Lunar gravity modeling up to a degree and order of 250 and a variety of onboard clocks and measurement types including weak-signal GNSS, Ground Network (GN) pseudorange (PR) and Doppler, and optical navigation (OpNav) center-finding (CF). The estimated trajectories produced by these Lunar relay MC simulations, along with the associated errors, and transmitted navigation reference signal parameters, are used to evaluate the expected navigation performance of a user on a descent trajectory to the Lunar surface. The scenario features a lander system performing onboard navigation relying on one-way range and Doppler measurements from reference signals emitted by the Lunar relay. This paper can be used as a reference in determining the onboard clock and measurement types necessary to obtain acceptable navigation performance for the Lunar relay, and as a baseline for Lunar lander navigation performance using accurate measurements from a relay reference signal.

Jeffrey L. Small

Lunar Relay Onboard Navigation Performance and Effects on Lander Descent to Surface

A system of Lunar relay satellites has been proposed to address communication and navigation needs and ensure robustness for the variety of upcoming robotic and human exploration missions to the Moon. The relays are envisioned to estimate self-position and time knowledge onboard, allowing the system to provide in-situ navigation services to missions in the Lunar and cis-Lunar environment. The quality and accuracy of those services are highly dependent on the navigation performance of the relay itself. To assess the Lunar relay navigation performance, a series of orbit determination (OD) Monte Carlo (MC) simulations are run using Lunar gravity modeling up to a degree and order of 250 and a variety of onboard clocks and measurement types including weak-signal GNSS, Ground Network (GN) pseudorange (PR) and Doppler, and optical navigation (OpNav) center-finding (CF). The estimated trajectories produced by these Lunar relay MC simulations, along with the associated errors, and transmitted navigation reference signal parameters, are used to evaluate the expected navigation performance of a user on a descent trajectory to the Lunar surface. The scenario features a lander system performing onboard navigation relying on one-way range and Doppler measurements from reference signals emitted by the Lunar relay. This paper can be used as a reference in determining the onboard clock and measurement types necessary to obtain acceptable navigation performance for the Lunar relay, and as a baseline for Lunar lander navigation performance using accurate measurements from a relay reference signal.

Jeffrey L. Small

Autonomous Navigation of a Lunar Relay Using GNSS and Other Measurements

Many of the highest priority destinations at the Moon lack a continuous view of Earth, such as the lunar poles or lunar far side. Exploration of these sites will require spacecraft in cislunar space to relay communications and provide position, navigation, and timing (PNT) services. Accurate knowledge of relay position, velocity, and time is essential to these services. This paper describes a concept for a PNT Instrument being developed for the Lunar Communications Relay and Navigation Systems (LCRNS) Project. The instrument is intended as a payload that would enable autonomous, on-board, real-time navigation and timing using Global Navigation Satellite System (GNSS), optical navigation, and one-way measurements from Earth-based ground stations. Hardware-in-the-loop simulations using flight software are used to realistically characterize performance on hardware platforms with a path to flight. These results provide preliminary validation of the proposed PNT Instrument, demonstrate the benefits of augmenting GNSS with other measurements, and serve as an insightful reference for the design of future lunar missions, including those that will operate within the LunaNet framework of standards. This instrument concept relies on several technologies developed at NASA Goddard Space Flight Center (GSFC). For GNSS observables, the instrument relies on the high-altitude NavCube 3 mini (NC3m) GNSS receiver specifically designed for cislunar applications. The autoNGC system, which consists of flight software and a hardware platform, is responsible for fusing the observables using its extended Kalman filter, the Goddard Enhanced Onboard Navigation System (GEONS). Optical navigation observables are processed within autoNGC (“autonomous Navigation, Guidance, and Control”) using the Goddard Image Analysis & Navigation Tool (GIANT) which is also responsible for simulating high-fidelity images for test and analysis. In addition to describing the PNT Instrument and its components, the paper will present predicted performance based on simulation results. As a baseline, it will present GNSS-only hardware-in-the loop results using a NC3m test unit to process Spirent-simulated GPS signals in a potential lunar relay trajectory: a 12-hour elliptical frozen lunar orbit (ELFO). GEONS then processes the GPS pseudorange and time differenced carrier phase measurements to estimate and propagate the relay state (position, velocity, and time). These results extend previously published work that showed preliminary ELFO performance. Previous work has shown the importance of other measurement types, so additional simulations are performed which augment GNSS with ground station observables and several methods of optical navigation, including celestial navigation, limb-finding (e.g., observations of the lunar horizon), and terrain relative navigation (TRN). TRN involves correlating simulated predicted images of the lunar surface with actual imagery; misalignments of landmarks identified in each image are translated into relay state updates. TRN is valuable as a measurement of the relay’s state relative to the Moon, especially during GNSS outages or after maneuvers. One-way Pseudorange and Doppler measurements from Earth-based ground stations are also simulated. The full set of observables is processed using autoNGC. These simulations make use of autoNGC and NC3m test units, a lab atomic clock, and a pulse-per-second (PPS) generation and distribution system. This combination of subsystems, and the hardware platforms used in this analysis, represents a PNT Instrument that could be flown on a lunar relay. Results from the hardware-in-the-loop simulations presented in this paper provide a preliminary assessment of the achievable navigation performance of this instrument concept. PNT Instrument performance is compared to the GPS-only performance, and a discussion is provided on the apparent merits and challenges of each measurement type.

Ben Ashman

IEEE 802.16J-Relay Fortified Aeromacs Networks; Benefits and Challenges

Aeronautical Mobile Airport Communications System (AeroMACS) is an IEEE 802.16 standard-based (WiMAX) broadband aviation transmission technology, developed to provide safety critical communications coverage for airport surface in support of fixed and mobile ground to ground applications and services. We have previously demonstrated that IEEE 802.16j-amendment-based WiMAX is most feasible for AeroMACS applications. The principal argument in favor of application of IEEE 802.16j technology is the flexible and cost effective extension of radio coverage that is afforded by relay fortified WiMAX networks, with virtually no increase in the power requirements. In this article, following introductory remarks on airport surface communications, WiMAX and AeroMACS; the IEEE 802.16j-based WiMAX technology and multihop relay systems are briefly described. The two modes of relay operation supported by IEEE 802.16j amendment; i.e., transparent (TRS) and non-transparent (NTRS) modes, are discussed in some detail. Advantages and disadvantages of using TRS and NTRS in AeroMACS networks are summarized in a table. Practical issues vis--vis the inclusion of relays in AeroMACS networks are addressed. It is argued that the selection of relay type may affect a number of network parameters. A discussion on specific benefits and challenges of inclusion of relays in AeroMACS networks is provided. The article concludes that in case it is desired or necessary to exclusively employ one type of relay mode for all applications throughout an AeroMACS network, the proper selection would be the non-transparent mode.

Networks

Relay Support for the Mars Science Laboratory Mission

The Mars Science Laboratory (MSL) mission landed the Curiosity Rover on the surface of Mars on August 6, 2012, beginning a one-Martian-year primary science mission. An international network of Mars relay orbiters, including NASA's 2001 Mars Odyssey Orbiter (ODY) and Mars Reconnaissance Orbiter (MRO), and ESA's Mars Express Orbiter (MEX), were positioned to provide critical event coverage of MSL's Entry, Descent, and Landing (EDL). The EDL communication plan took advantage of unique and complementary capabilities of each orbiter to provide robust information capture during this critical event while also providing low-latency information during the landing. Once on the surface, ODY and MRO have provided effectively all of Curiosity's data return from the Martian surface. The link from Curiosity to MRO incorporates a number of new features enabled by the Electra and Electra-Lite software-defined radios on MRO and Curiosity, respectively. Specifically, the Curiosity-MRO link has for the first time on Mars relay links utilized frequency-agile operations, data rates up to 2.048 Mb/s, suppressed carrier modulation, and a new Adaptive Data Rate algorithm in which the return link data rate is optimally varied throughout the relay pass based on the actual observed link channel characteristics. In addition to the baseline surface relay support by ODY and MRO, the MEX relay service has been verified in several successful surface relay passes, and MEX now stands ready to provide backup relay support should NASA's orbiters become unavailable for some period of time.

Telecommunications

A Martian Telecommunications Network: UHF Relay Support of the Mars Exploration Rovers by the Mars Global Surveyor, Mars Odyssey, and Mars Express Orbiters

NASA and ESA have established an international network of Mars orbiters, outfitted with relay communications payloads, to support robotic exploration of the red planet. Starting in January, 2004, this network has provided the Mars Exploration Rovers with telecommunications relay services, significantly increasing rover engineering and science data return while enhancing mission robustness and operability. Augmenting the data return capabilities of their X-band direct-to-Earth links, the rovers are equipped with UHF transceivers allowing data to be relayed at high rate to the Mars Global Surveyor (MGS), Mars Odyssey, and Mars Express orbiters. As of 21 July, 2004, over 50 Gbits of MER data have been obtained, with nearly 95% of that data returned via the MGS and Odyssey UHF relay paths, allowing a large increase in science return from the Martian surface relative to the X-band direct-to-Earth link. The MGS spacecraft also supported high-rate UHF communications of MER engineering telemetry during the critical period of entry, descent, and landing (EDL), augmenting the very low-rate EDL data collected on the X-band direct-to-Earth link. Through adoption of the new CCSDS Proximity-1 Link Protocol, NASA and ESA have achieved interoperability among these Mars assets, as validated by a successful relay demonstration between Spirit and Mars Express, enabling future interagency cross-support and establishing a truly international relay network at Mars.

telecommunications

Data Relay Board with Protocol for High-Speed, Free-Space Optical Communications

In a free-space optical communication system, the mitigation of transient outages through the incorporation of error-control methods is of particular concern, the outages being caused by scintillation fades and obscurants. The focus of this innovative technology is the development of a data relay system for a reliable high-data-rate free-spacebased optical-transport network. The data relay boards will establish the link, maintain synchronous connection, group the data into frames, and provide for automatic retransmission (ARQ) of lost or erred frames. A certain Quality of Service (QoS) can then be ensured, compatible with the required data rate. The protocol to be used by the data relay system is based on the draft CCSDS standard data-link protocol Proximity-1, selected by orbiters to multiple lander assets in the Mars network, for example. In addition to providing data-link protocol capabilities for the free-space optical link and buffering the data, the data relay system will interface directly with user applications over Gigabit Ethernet and/or with highspeed storage resources via Fibre Channel. The hardware implementation is built on a network-processor-based architecture. This technology combines the power of a hardware switch capable of data switching and packet routing at Gbps rates, with the flexibility of a software- driven processor that can host highly adaptive and reconfigurable protocols used, for example, in wireless local-area networks (LANs). The system will be implemented in a modular multi-board fashion. The main hardware elements of the data relay system are the new data relay board developed by Rockwell Scientific, a COTS Gigabit Ethernet board for user interface, and a COTS Fibre Channel board that connects to local storage. The boards reside in a cPCI back plane, and can be housed in a VME-type enclosure.

Wright, Malcolm

Mars Relay Operations Service (MaROS): A Present Service Preparing for the Future

The Mars Relay Operations Service (MaROS) has been deployed by NASA's Mars Program Office and the Multimission Ground Systems and Services (MGSS) Project into mission operations to aid in the coordination of relay activities at Mars. This live system presents standardized interfaces and a centralized infrastructure to current and future participants in the Mars Relay Network for the purpose of reliably and securely exchanging and storing all relay-related planning and operations data. The initial development of this system leveraged over eight years of experience performing relay operations between the various spacecraft at Mars. Now, four years after its initial deployment, MaROS continues to undergo further refinement to better meet the needs of the Mars Relay Network. The most substantial, recent update was focused on providing capabilities needed by the Mars Science Laboratory project, which landed on Mars in August of 2012. This paper will describe the nature of that update and describe additional features being added to the system to better serve the needs of current and future Mars missions.

Gladden, Roy E.

On Proper Selection of Multihop Relays for Future Enhancement of AeroMACS Networks

As the Aeronautical Mobile Airport Communications System (AeroMACS) has evolved from a technology concept to a deployed communications network over major US airports, it is now time to contemplate whether the existing capacity of AeroMACS is sufficient to meet the demands set forth by all fixed and mobile applications over the airport surface given the AeroMACS constraints regarding bandwidth and transmit power. The underlying idea in this article is to present IEEE 802.16j-based WiMAX as a technology that can address future capacity enhancements and therefore is most feasible for AeroMACS applications. The principal argument in favor IEEE 802.16j technology is the flexible and cost effective extension of radio coverage that is afforded by relay fortified networks, with virtually no increase in the power requirements and virtually no rise in interference levels to co-allocated applications. The IEEE 802.16j-based multihop relay systems are briefly described. The focus is on key features of this technology, frame structure, and its architecture. Next, AeroMACS is described as a WiMAX-based wireless network. The two major relay modes supported by IEEE 802.16j amendment, i.e., transparent and non-transparent are described. The benefits of employing multihop relays are listed. Some key challenges related to incorporating relays into AeroMACS networks are discussed. The selection of relay type in a broadband wireless network affects a number of network parameters such as latency, signal overhead, PHY (Scalable Physical Layer) and MAC (Media Access Layer) layer protocols, consequently it can alter key network quantities of throughput and QoS (Quality of Service).

aircraft communications

Deep Space Relay Terminals for Mars Superior Conjunction

The Sun periodically blocks direct communication between the Earth and Mars, creating a need for a relay when missions have a critical need for communication during these times. We examined several approaches based on optical or radio-frequency relays placed in deep space between the Earth and Mars, exploring multiple possible placements of relays, including periodic orbits in the Sun-Earth and Sun-Mars rotating frames, and eccentric, sun-centered orbits. L4 and L5 long-period orbits in the sun-Mars system provide suitable communications geometry continuously for very long durations. In such an orbit, a deep space relay terminal with two 50 cm optical telescopes and two 75 cm Ka-band dish antennas, along with associated receivers and transmitters, would be capable of supporting Mars superior conjunctions with an optical data rate of 28 to 44 Mbps for return links, and 30-36 Mbps in the forward direction. The relay should use efficient, low-noise optical detectors, such as appropriately cooled Avalanche Photo Diode or Superconducting Nanowire Single Photon Detectors, to achieve these data rates. The single relay discussed in this study might have additional value beyond communications, providing a synergistic platform for solar observation, solar wind observation, gravitational studies, the search for near-earth asteroids, or a navigational beacon.

Lau, Chi-Wung

Extending the Life of NASA’s Tracking and Data Relay Satellite (TDRS)-8: TDRS-8 Power Challenges And Planning for End of Mission

The United States National Aeronautics and Space Administration (NASA) Near Space Network’s Space Relay (SR) System provides communication relay services to a number of scientific and manned space missions with its Tracking and Data Relay Satellite (TDRS) constellation. NASA’s eighth Tracking and Data Relay Satellite (TDRS) has been experiencing a decline in the health of its power subsystem, and recent reliability analyses indicate that the end of its mission serving the Space Relay is imminent. Launched in 2000, TDRS-8 is the oldest TDRS built upon a Boeing 601 platform, and as such it is the first TDRS to experience these age-related failures. The most prevalent elements of the power subsystem to decline are the solar array circuitry and the Bus Voltage Limiters (BVLs), which prevent too much power from the solar arrays being transferred to the bus by shunting excess current. This means that while the loss of solar array circuits introduces concerns that the solar arrays will continue providing the spacecraft with enough current to remain power positive, the loss of BVLs introduces a concern that the bus may not be adequately protected from overvoltage events. Spacecraft engineers at the TDRS primary ground terminal, the White Sands Complex (WSC) in Las Cruces, New Mexico, and at NASA's Goddard Space Flight Center (GSFC) have also been working in collaboration with Boeing to develop innovative techniques to extend the serviceable life of TDRS-8.

tdrs

Comparison of Sequence Component-Based Fault Detection and Relay Coordination Algorithms in Inverter-Based Networks

Protection of inverter-based microgrids using sequence component-based relaying schemes is a promising solution. These methods offer several advantages, including lower computational requirements, compatibility with commercial relay systems, and cost-effectiveness compared to communication-based approaches. This article investigate the performance of various sequence component based schemes with the objective of identifying the algorithms that provide the best fault detection and relay coordination, solely relying on local voltages and current at relay terminals. Positive, negative and zero sequence impedance, admittance and power detection algorithms were tested on modified IEEE 13 bus test network for various shunt faults (LG, LL, LLG, LLL). Hardware-in-the-loop validation was achieved using the Typhoon real-time simulator, interfacing with a SEL 751 relay. This research demonstrates that while several algorithms are capable of detecting faults with sufficient accuracy, only a few are effective in achieving proper coordination. Validation results indicate that the negative sequence power approach provides the best performance in both fault detection and coordination.

Patel, Deepika [ORNL] (ORCID:0000000341099994)

Performance of an optical relay satellite using Reed-Solomon coding over a cascaded optical PPM and BPSK channel

The nature of the optical/microwave interface aboard the relay satellite is considered. To allow for the maximum system flexibility, without overburdening either the optical or RF channel, demodulating the optical on board the relay satellite but leaving the optical channel decoding to be performed at the ground station is examined. The occurrence of erasures in the optical channel is treated. A hard decision on the erasure (i.e., the relay selecting a symbol at random in case of erasure occurrence) seriously degrades the performance of the overall system. Coding the erasure occurrences at the relay and transmitting this information via an extra bit to the ground station where it can be used by the decoder is suggested. Many examples with varying bit/photon energy efficiency and for the noisy and noiseless optical channel are considered. It is shown that coding the erasure occurrences dramatically improves the performance of the cascaded channel relative to the case of hard decision on the erasure by the relay.

Divsalar, D.

Failure analysis of blistered gold plating on spot welded electrical relays

Gold-plated stainless-steel sideplates, part of a JPL Galileo spacecraft electronic-relay assembly, exhibited blistering after resistance spot welding. Unacceptable relays had heavy nonuniform gold electrodeposited layers with thicknesses 4.5-11.5 microns. SEM and metallographic investigations indicated much higher heat input generated during the resistance spot welding in unacceptable relays. The attributes of acceptable welded relays are contrasted with unacceptable relays; the possible mechanism of laminar formation of polymeric material in the gold plating is discussed; and some recommendations are provided to prevent similar problems.

Sokolowski, Witold

Cost and Performance Comparison of an Earth-Orbiting Optical Communication Relay Transceiver and a Ground-Based Optical Receiver Subnet

Optical communications can provide high-data-rate telemetry from deep-space probes with subsystems that have lower mass, consume less power, and are smaller than their radio frequency (RF) counterparts. However, because optical communication is more a.ected by weather than is RF communication, it requires groundstation site diversity to mitigate the adverse e.ects of inclement weather on the link. An optical relay satellite is not a.ected by weather and can provide 24-hour coverage of deep-space probes. Using such a relay satellite for the deep-space link and an 8.4-GHz (X-band) link to a ground station would support high-data-rate links from small deep-space probes with very little link loss due to inclement weather. We have reviewed past JPL-funded work on RF and optical relay satellites, and on proposed clustered and linearly dispersed optical subnets. Cost comparisons show that the life cycle costs of a 7-m optical relay station based on the heritage of the Next Generation Space Telescope is comparable to that of an 8-station subnet of 10- m optical ground stations. This makes the relay link an attractive option vis- a-vis a ground-station network.

Wilson, K. E.