Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “receivers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Pathways to IEC Standards for Heliostat Design Qualification and Site Acceptance in Central Receiver CSP Applications

This paper surveys the existing landscape of standards relevant to heliostats, identifies their gaps, and proposes a path forward to a comprehensive set of heliostat guidelines, technical specifications, and standards under the framework of International Electrotechnical Commission (IEC) TC 117. Gaps in existing guidelines and standards are surveyed using a three-tiered taxonomy: component-level, heliostat-level, and field-level. At each level, the gap analysis is followed by a proposal for a coordinated path forward on the development of standards. At the component level, advances in the understanding of wind loading should inform a technical specification for drives and structures. Reflectors require consolidation of measurement guidelines into existing standards documents. Communications & controls require technical standards to inform their selection and secure implementation. At the heliostat level, IEC 62817 (solar trackers) adequately characterizes drive systems, structures, and electronics, but requires adaptation to heliostats' use patterns, operating modes, and expected life cycles. IEC 62817 does not address heliostat beam quality and pointing accuracy, but the process for determining both is elaborated in the SolarPACES Guideline for Heliostat Performance Testing. This SolarPACES document requires two main modifications: adaptation to IEC language and inclusion of testing after heliostats which have undergone accelerated weathering and mechanical cycling (to understand performance degradation). At the field level, IEC 62862-4-2 addresses the function and control of heliostat fields but does not cover the statistically rigorous testing of heliostat groups, or field performance factors like security and soiling. The addition of documents under IEC-62862-4 is proposed to address this gap.

beam↗

Concentrator-type photovoltaic (CPV) modules, receiver and sub-receivers and methods of forming same

CPV modules include a back plate having an array of 1 mm2 or smaller solar cells thereon. A backplane interconnect network is also provided on the back plate. This backplane interconnect network operates to electrically connect the array of solar cells together. A front plate, which is spaced-apart from the back plate, is provided. This front plate includes an array of primary lenses thereon that face the array of solar cells. The front plate can be configured to provide a greater than 1000× lens-to-cell light concentration to the array of solar cells. To achieve this 1000× lens-to-cell light concentration, the primary lenses can be configured as plano-convex lenses having a lens sag of less than about 4 mm. An array of secondary optical elements may also be provided, which extend between the array of primary lenses and the array of solar cells.

14 SOLAR ENERGY↗