Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Independent Review of U.S. and Russian Probabilistic Risk Assessments for the International Space Station Mini Research Module #2 Micrometeoroid and Orbital Debris Risk

The Mini-Research Module-2 (MRM-2), a Russian module on the International Space Station, does not meet its requirements for micrometeoroid and orbital debris probability of no penetration (PNP). To document this condition, the primary Russian Federal Space Agency ISS contractor, S.P. Korolev Rocket and Space Corporation-Energia (RSC-E), submitted an ISS non-compliance report (NCR) which was presented at the 5R Stage Operations Readiness Review (SORR) in October 2009. In the NCR, RSC-E argued for waiving the PNP requirement based on several factors, one of which was the risk of catastrophic failure was acceptably low at 1 in 11,100. However, NASA independently performed an assessment of the catastrophic risk resulting in a value of 1 in 1380 and believed that the risk at that level was unacceptable. The NASA Engineering and Safety Center was requested to evaluate the two competing catastrophic risk values and determine which was more accurate. This document contains the outcome of the assessment.

Squire, Michael D.↗

Hybrid Suitcase Demonstrator

The need for a small, transportable hybrid motor used to demonstrate and test various hybrid propulsion concepts was identified. Demonstrations would be for public audiences to explain basic hybrid rocket concepts. Tests would be for scientific purposes and hands-on training of engineers. Funded by Technical Excellence and NESC, the system as a whole has served as a learning tool for the NASA project cycle. Coming out of the Preliminary Design Review (PDR), the project was split into two separate configurations, one for demonstrations and one for tests; each would have its own oxidizer feed system. The Demonstration system will be a simple, low pressure system with the ability to recycle for multiple motor firings. The grain design will be a fixed configuration for all firings and utilize a clear material such that the combustion process is visible. The Test Readiness Review has been held and final actions are being pursued before the initial firing.

hybrid rocket↗

ALARA Review for Venting of Flanged Tritium Waste Containers (FTWCs) at TA-54

This project will vent headspace hydrogen and oxygen from specialized high-pressure storage vessels called flanged tritium waste containers (FTWCs). There are four of these containers located in Los Alamos National Laboratory’s (LANL’s) Technical Area 54 (TA-54), Building 1028. This building is in the southwest corner of LANL’s Material Disposal Area G. The vented headspace gas is expected to contain tritium in the form of water vapor, elemental hydrogen or a combination of both. The venting operation is expected to take place in 2025. There will be a series of operational readiness reviews prior to venting activities commencing. The FTWCs at TA-54 contain tritium-contaminated metal parts and molecular sieve media, which is a pebble-like material used to absorb water vapor from the air. This molecular sieve media inside the FTWCs is contained in metal canisters, along with some loose media material in bags. Over time, tritiated water vapor that had been adsorbed onto the media can become liberated into the FTWC headspace gas. Radiolysis can cause separation of the water vapor into its hydrogen and oxygen components, resulting in the potentially hazardous gas mixture within the FTWC. LANL has determined that continued tritium storage in these containers can pose an unsafe condition due to possible hydrogen and oxygen gas buildup within the FTWCs with a potential for explosion if sparks are generated within the FTWCs. To mitigate this hazard, the FTWCs will be stabilized by venting them in-place to remove hazardous gases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Probabilistic Risk Assessment in Shuttle Decision Making Process

This slide presentation reviews the use of Probabilistic Risk Assessment (PRA) to assist in the decision making for the shuttle design and operation. Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and disciplined approach to identifying and analyzing risk in complex systems and/or processes that seeks answers to three basic questions: (i.e., what can go wrong? what is the likelihood of these occurring? and what are the consequences that could result if these occur?) The purpose of the Shuttle PRA (SPRA) is to provide a useful risk management tool for the Space Shuttle Program (SSP) to identify strengths and possible weaknesses in the Shuttle design and operation. SPRA was initially developed to support upgrade decisions, but has evolved into a tool that supports Flight Readiness Reviews (FRR) and near real-time flight decisions. Examples of the use of PRA for the shuttle are reviewed.

Boyer, Roger L.↗

SITCOMTN-086: Rubin Observatory Baseline Calibration Plan

Baseline calibration plan describing the as-built system to be delivered at the time of the Operations Readiness Review (ORR), and for use during Year 1 of the Rubin Observatory Legacy Survey of Space and Time (LSST).

79 ASTRONOMY AND ASTROPHYSICS↗

Shuttle spacelab simulation using a Lear jet aircraft: Mission no. 3 (ASSESS program)

The third ASSESS mission using a Lear Jet aircraft conducted to continue the study of scientific experiment operations in a simulated Spacelab environment. Prior to the mission, research planning and equipment preparation were observed and documented. A flight readiness review for the experiment was conducted. Nine of the ten scheduled flights were completed during simulation mission and all major science objectives were accomplished. The equipment was well qualified for flight and gave little trouble; telescope malfunctions occurred early in the mission and were corrected. Both real-time and post-observation data evaluation were used to assess research progress and to plan subsequent flight observations for maximum effectiveness.

Reller, J. O., Jr.↗

The US National Transonic Facility, part 2

The construction of the National Transonic Facility was completed in September 1982, and checkout operations started the following month with the maximum Reynolds number being obtained in May 1983. Afterwards, effort was primarily devoted to installing the model access housings and adjusting or altering various tunnel hardware systems. In May 1984, the aerodynamic calibration started and was performed in parallel with checkout of the tunnel systems. In August 1984, the final operation readiness review was conducted and the facility declared operational for research testing. The facility has been operated in both air and nitrogen modes covering a Mach number range of 0.2 to 1.22 at pressures up to 8.5 atm and at temperatures doen to 100K. A limited amount of tunnel circuit performance information has been obtained and is presented in this paper. An aerodynamic calibration plan has been outlined, and the first part of the steady-state calibration has been completed, of which some results are presented in this paper. The first aerodynamic vehicle, Pathfinder I, was installed in December 1984 for checkout of instrumentation systems, and a status report and some results are presented.

Bruce, W. E., Jr.↗

X-29A technology demonstrator flight test program overview

An overview of the X-29A functional flight program and concept evaluation program is presented, including some of the unique and different preparations for the first flight. Included are a discussion of the many organizational responsibilities and a description of the program management structure for the test team. Also discussed are preflight ground, flight functional envelope expansion, and flight research test objectives and qualitive results to date for both a limited-envelope flight control system and an expanded-envelope system. The aircraft, including the instrumentation system and measurements, is described. In addition, a discussion is included regarding the use of major support facilities, such as ground and flight simulators, the NASA Western Aeronautical Test Range and mission control center, and the Grumman automated telemetry station. An overview of the associated real-time and postflight batch data processing software approaches is presented. The use of hardware-in-the-loop simulation for independent verification and validation and mission planning and practice is discussed. Also included is a description of the flight-readiness review, the airworthiness and flight safety review, work scheduling, technical briefings, and preflight and postflight crew briefings. The configuration control process used on the X-29A program is described, and its relationship to both simulation and aircraft operations is discussed. An X-29A schedule overview is presented with an outline of a proposed follow-on program.

Sefic, W. J.↗

Testing and checkout experiences in the National Transonic Facility since becoming operational

The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.

Bruce, W. E., Jr.↗

The US National Transonic Facility, NTF

The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of tunnel systems were performed over the next two years. In August 1984, the Operational Readiness Review (ORR) was conducted and the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamic calibration and testing to commence. Also, the model access system for the cryogenic mode of operation would be placed into operation along with tunnel testing. Since the ORR, a host of operating problems resulting from the cryogenic environment were identified and solved. These range from making mechanical and electrical systems functional to eliminating temperature induced model vibration to coping with the outgassing of moisture from the thermal insulation. Additionally, a series of aerodynamic tests have demonstrated data quality and provided research data on several configurations. Some of the more significant efforts are reviewed since the ORR and the NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality are summarized.

Bruce, Walter E., Jr.↗

The Automated Logistics Element Planning System (ALEPS)

ALEPS, which is being developed to provide the SSF program with a computer system to automate logistics resupply/return cargo load planning and verification, is presented. ALEPS will make it possible to simultaneously optimize both the resupply flight load plan and the return flight reload plan for any of the logistics carriers. In the verification mode ALEPS will support the carrier's flight readiness reviews and control proper execution of the approved plans. It will also support the SSF inventory management system by providing electronic block updates to the inventory database on the cargo arriving at or departing the station aboard a logistics carrier. A prototype drawer packing algorithm is described which is capable of generating solutions for 3D packing of cargo items into a logistics carrier storage accommodation. It is concluded that ALEPS will provide the capability to generate and modify optimized loading plans for the logistics elements fleet.

Schwaab, Douglas G.↗

An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

Cathy L Padolewski↗

Telescope Scientist on the Advanced X-Ray Astrophysics Observatory

The most important activity during this reporting period was the calibration of the AXAF High Resolution Mirror Assembly (HRMA) and the analysis of the copious data which were obtained during that project. The calibration was highly successful, and will result in the AXAF being by far the best calibrated X-ray observatory ever flown, and more accurate results by all of its users. This period also included participation in the spacecraft alignment and assembly activities and final flight readiness reviews. The planning of the first year of Telescope Scientist AXAF observations also was accomplished. The Telescope Scientist team also served as a technical resource for various problems which were encountered during this period. Many of these contributions have been documented in memoranda sent to the project.

VanSpeybroeck, Leon↗

CFM Analysis, Documentation, and Planning Support

The Multipurpose Hydrogen Test Bed (MHTB) Test Readiness Review (TRR), in preparation for upcoming thermodynamic vent system testing with LN2 (an LO2 simulant), was conducted on Aug 10 with no significant concerns or open action items. The 21 day test series, designed to evaluate the spray bar mixer/vent system concept suitability for zero-g operation began on August 19. The testing is progressing very well and results indicate that the Moog latching valve is more effective than the Castor solenoid valve in reducing pressure during the vent/mixing cycles. Testing with self-pressurization is expected to be completed on September 3 and testing with helium pressurization will be initiated on September 4 or 5. Additional activities during first half of August included coordination of Notification of Intent (NOI) to propose letters involving CFM in response to the HR&T BAA for Extramural Proposals.

Hastings, Leon J.↗

GO/NO-GO - When is medical hazard mitigation acceptable for launch?

Medical support of spaceflight missions is composed of complex tasks and decisions that dedicated to maintaining the health and performance of the crew and the completion of mission objectives. Spacecraft represent one of the most complex vehicles built by humans, and are built to very rigorous design specifications. In the course of a Flight Readiness Review (FRR) or a mission itself, the flight surgeon must be able to understand the impact of hazards and risks that may not be completely mitigated by design alone. Some hazards are not mitigated because they are never actually identified. When a hazard is identified, it must be reduced or waivered. Hazards that cannot be designed out of the vehicle or mission, are usually mitigated through other means to bring the residual risk to an acceptable level. This is possible in most engineered systems because failure modes are usually predictable and analysis can include taking these systems to failure. Medical support of space missions is complicated by the inability of flight surgeons to provide "exact" hazard and risk numbers to the NASA engineering community. Taking humans to failure is not an option. Furthermore, medical dogma is mostly comprised of "medical prevention" strategies that mitigate risk by examining the behaviour of a cohort of humans similar to astronauts. Unfortunately, this approach does not lend itself well for predicting the effect of a hazard in the unique environment of space. This presentation will discuss how Medical Operations uses an evidence-based approach to decide if hazard mitigation strategies are adequate to reduce mission risk to acceptable levels. Case studies to be discussed will include: 1. Risk of electrocution risk during EVA 2. Risk of cardiac event risk during long and short duration missions 3. Degraded cabin environmental monitoring on the ISS. Learning Objectives 1.) The audience will understand the challenges of mitigating medical risk caused by nominal and off-nominal mission events. 2.) The audience will understand the process by which medical hazards are identified and mitigated before launch. 3.) The audience will understand the roles and responsibilities of all the other flight control positions in participating in the process of reducing hazards and reducing medical risk to an acceptable level.

Hamilton, Douglas R.↗

STS-1: Columbia Briefings

A video presentation on an update of the STS-1 Columbia Shuttle is shown. Hugh Harris is the moderator. He introduces Don Phillips, Chief STS Test OPS, who presents the status of the vehicle. Terry William, Chief of Mechanical Systems, discusses the debonding of the panels. A question and answer period from the news media is shown. The various topics of discussion from the news media include: 1) Repair of thermal tiles; 2) Launch dates; and 3) Landing and launch sites and 4) Low pressure/high pressure tanking tests. An audio presentation is given of questions from NASA Marshall Space Flight Center and NASA Washington. On March 12, 1981, another STS-1 Columbia update is shown. Bob Schick, Shuttle Test Director, and Bob Sieck, Flight Project Engineer answers questions about the actual repair time of the panels and a very detailed description of the three areas of debonding is presented. A brief launch date statement from Dr. Allen Lovelace, Acting NASA Administrator is given and John Lardley, Shuttle Associate Director, discusses the flight readiness review.

Source record↗

STS-121: Discovery Entry Flight Director Post Landing Press Conference

Steve Stitch, STS-121 Entry Flight Director, and Wayne Hale, Space Shuttle Program is shown in this post landing press conference. Steve Stitch begins with discussing the following topics: 1) Weather at Kennedy Space Center; 2) Gap filler protrusion; 3) De-orbit burn; 4) Space Shuttle Landing; 5) Global Position Satellite System (GPSS) performance; and 6) Post-landing rain showers. Wayne Hale discusses external tank observations at launch and the goals that were obtained by this flight, which are to deliver 4000 pounds of scientific equipment, increase the crew members to three on the International Space Station (ISS), and repair the ISS. Questions from the press on lessons learned from the Auxiliary Power Unit (APU) leak, and flight readiness reviews are addressed.

Source record↗

Visibility science operations with the Keck Interferometer

The visibility science mode of the Keck Interferometer fully transitioned into operations with the successful completion of its operational readiness review in April, 2004. The goal of this paper is to describe this science mode and the operations structure that supports it.

interferometer↗