Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ramp forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

HAIMOS Ensemble Forecasts for Intra-day and Day- Ahead GHI, DNI and Ramps

The objective of this research is to develop a hybrid physics-based/data-driven forecast model to improve direct normal and global horizontal irradiance (DNI and GHI) prediction for horizons ranging from 1 to 72 hours. Project objectives also address key gaps in state-of-the-art solar forecasting: accurate probabilistic solar forecasts and the forecasting of large irradiance ramps (ramp onset and magnitude). The proposed model ensembles Numerical Weather Prediction (NWP) forecasts, determinist physics-based algorithms, and new-generation cloud cover products (high-resolution rapid refresh satellite images and Large Eddy Simulations). The result is the Hybrid Adaptive Input Model Objective Selection (HAIMOS) ensemble model. HAIMOS blends state of the art machine learning methodologies with physics-based models for cloud cover and cloud optical depth forecasts. The technical activities followed a two-pronged strategy. First, the preprocessing of data, the selection of inputs to the nonlinear approximators, the type of approximator and objective functions, and post-processing ensembling techniques included in HAIMOS were all optimized adaptively to find the best model for a specific goal (reduce DNI/GHI forecast error, improve the prediction of ramp onset, etc.). Second, a large effort was put in improving cloud identification and the forecast of cloud cover and cloud optical depth. To this end, new-generation cloud parametrization products were developed in this work. These include improved algorithms to assist in cloud identification, cloud classification and cloud parametrization from satellite images – three key factors in the accuracy of 1 to 6-hours irradiance forecasts and prediction of ramp onset. Furthermore, we also included cloud information extracted from high resolution rapid refresh satellite images (GOES-16) and Large Eddy Simulations (LES). LES was used to model the atmosphere in detail over locations of interest and produce cloud optical depth forecasts. Once these data streams were validated, they were used as input data to the HAIMOS forecast. The model was developed using data from several climatologically distinct locations with potential for high solar penetration. In the last year of the project, we conducted a validation campaign according to the guidelines stipulated by the Topic Area 1 project as described in the FOA. This effort brings, for the first time, proven machine-learning methodologies for generating state-of-the-art solar forecasts interweaved with detailed physics-based models for cloud detection, and cloud optical depth forecasts. HAIMOS will generate accurate irradiance probabilistic forecast to assist in reducing solar generation prediction error. Globally optimized solar forecast models are more likely to impact solar energy stakeholders. The goal of this project was to increase the state-of-the-art forecast skill from their present values of 10 to 35%. At the end of the project, we achieved between 30% and 50% forecast skill across a wide range of horizons for both GHI and DNI.

14 SOLAR ENERGY↗

Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is called Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year.

14 SOLAR ENERGY↗

Pro2R: Procurement of Ramping Product and Regulation in CAISO Using Probabilistic Solar Power Forecasts

This presentation summarizes the objectives and findings from the project titled, "Pro2R: Coordinated Procurement of Ramping Product & Regulation in CAISO Using Probabilistic Solar Power Forecasts," funded by DOE SETO. The goal is to develop cutting edge probabilistic solar power forecasting methods, and integrate them into ISO market operations. The team has integrated in two ways: 1) to procure ramping product and regulation requirements (ancillary services) in the California ISO market, and 2) to develop an open source visitation and ramp alert related situational awareness using probabilistic forecasts. This deck also summarizes the results from the use of machine learning methods to relate probabilistic solar forecasts to the the needs for flexible ramp product in the California ISO system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Wind-Friendly Flexible Ramping Product Design in Multi-Timescale Power System Operations

With increasing wind power penetration in the electricity grid, system operators are recognizing the need for additional flexibility, and some are implementing new ramping products as a type of ancillary service. However, wind is generally thought of as causing the need for ramping services, not as being a potential source for the service. In this paper, a multi-timescale unit commitment and economic dispatch model is developed to consider the wind power ramping product (WPRP). An optimized swinging door algorithm with dynamic programming is applied to identify and forecast wind power ramps (WPRs). Designed as positive characteristics of WPRs, the WPRP is then integrated into the multi-timescale dispatch model that considers new objective functions, ramping capacity limits, active power limits, and flexible ramping requirements. Numerical simulations on the modified IEEE 118-bus system show the potential effectiveness of WPRP in increasing the economic efficiency of power system operations with high levels of wind power penetration. It is found that WPRP not only reduces the production cost by using less ramping reserves scheduled by conventional generators, but also possibly enhances the reliability of power system operations. Moreover, wind power forecasts play an important role in providing high-quality WPRP service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Validation of Power Output for the WIND Toolkit

Renewable energy integration studies require wind data sets of high quality with realistic representations of the variability, ramping characteristics, and forecast performance for current wind power plants. The Wind Integration National Data Set (WIND) Toolkit is meant to be an update for and expansion of the original data sets created for the weather years from 2004 through 2006 during the Western Wind and Solar Integration Study and the Eastern Wind Integration Study. The WIND Toolkit expands these data sets to include the entire continental United States, increasing the total number of sites represented, and it includes the weather years from 2007 through 2012. In addition, the WIND Toolkit has a finer resolution for both the temporal and geographic dimensions. Three separate data sets will be created: a meteorological data set, a wind power data set, and a forecast data set. This report describes the validation of the wind power data set.

17 WIND ENERGY↗

Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid

This document discusses improving system operations with forecasting and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

17 WIND ENERGY↗

WindSENSE Project Summary: FY2009-2011

Renewable resources, such as wind and solar, are providing an increasingly larger percentage of our energy needs. To successfully integrate these intermittent resources into the power grid while maintaining its reliability, we need to better understand the characteristics and predictability of the variability associated with these power generation resources. WindSENSE, a three year project at Lawrence Livermore National Laboratory, considered the problem of scheduling wind energy on the grid from the viewpoint of the control room operator. Our interviews with operators at Bonneville Power Administration (BPA), Southern California Edison (SCE), and California Independent System Operator (CaISO), indicated several challenges to integrating wind power generation into the grid. As the percentage of installed wind power has increased, the variable nature of the generation has become a problem. For example, in the Bonneville Power Administration (BPA) balancing area, the installed wind capacity has increased from 700 MW in 2006-2007 to over 1300 MW in 2008 and more than 2600 MW in 2009. To determine the amount of energy to schedule for the hours ahead, operators typically use 0-6 hour ahead forecasts, along with the actual generation in the previous hours and days. These forecasts are obtained from numerical weather prediction (NWP) simulations or based on recent trends in wind speed in the vicinity of the wind farms. However, as the wind speed can be difficult to predict, especially in a region with complex terrain, the forecasts can be inaccurate. Complicating matters are ramp events, where the generation suddenly increases or decreases by a large amount in a short time (Figure 1, right panel). These events are challenging to predict, and given their short duration, make it difficult to keep the load and the generation balanced. Our conversations with BPA, SCE, and CaISO indicated that control room operators would like (1) more accurate wind power generation forecasts for use in scheduling and (2) additional information that can be exploited when the forecasts do not match the actual generation. To achieve this, WindSENSE had two areas of focus: (1) analysis of historical data for better insights, and (2) observation targeting for improved forecasts. The goal was to provide control room operators with an awareness of wind conditions and energy forecasts so they can make well-informed scheduling decisions, especially in the case of extreme events such as ramps.

17 WIND ENERGY↗

Incorporating Wind Generation Forecast Uncertainty into Power System Operation, Dispatch, and Unit Commitment Procedures

In this paper, an approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the "flying-brick" technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors.

17 WIND ENERGY↗

Potential of Wind Power to Provide Flexible Ramping Products and Operating Reserve: Preprint

With increasing penetration levels of variable renewable energy sources, such as wind and solar, electric power systems need flexible resources that can provide fast-response ramping capabilities to counter the variability and uncertainty of renewable generation. Although the California Independent System Operator and Midcontinent System Operator have lauched ramp products, determining how wind power can participate using their flexible ramping models is still largely unclear. This paper proposes a security-constrained unit commitment (SCUC) model considering a flexible ramping constraint representing the system's flexible ramping requirements that account for the net load probabilistic forecast uncertainty. Through this explicit modeling of the uncertainty, the true cost of the flexible ramp service can be determined after solving the SCUC problem. In addition, the potential of wind power to provide operating reserves is analyzed. Numerical case studies demonstrate that with wind power providing both flexible ramping products and operating reserve, the system operating costs and ramp shortages will be reduced significantly.

17 WIND ENERGY↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Investigation of model parameters for high-resolution wind energy forecasting: case studies over simple and complex terrain

We report that wind power forecasting, turbine micrositing, and turbine design require high-resolution simulations of atmospheric flow. Case studies at two West Coast North American wind farms, one with simple and one with complex terrain, are explored using the Weather Research and Forecasting (WRF) model. Both synoptically and locally driven events that include some ramping are considered. The performance of the model with different grid nesting configurations, turbulence closures, and grid resolutions is investigated through comparisons with observation data. For the simple terrain site, no significant improvement in the simulation results is found when using higher resolution. In contrast, for the complex terrain site, there is significant improvement when using higher resolution, but only during the locally driven event. This suggests the possibility that computational resources could be spared under certain conditions, for example when the topography is adequately resolved at coarser resolutions. Physical parameters such as soil moisture have a very large effect, but mostly for the locally forced events for both simple and complex terrain. The effect of the PBL scheme choice varies significantly depending on the meteorological forcing and terrain. On average, prognostic TKE equation schemes perform better than non-local eddy viscosity schemes.

17 WIND ENERGY↗

Online Analysis of Wind and Solar Part I: Ramping Tool

To facilitate wider penetration of renewable resources without compromising system reliability concerns arising from the lack of predictability of intermittent renewable resources, a tool for use by California Independent System Operator (CAISO) power grid operators was developed by Pacific Northwest National Laboratory (PNNL) in conjunction with CAISO with funding from California Energy Commission. This tool predicts and displays additional capacity and ramping requirements caused by uncertainties in forecasts of loads and renewable generation. The tool is currently operational in the CAISO operations center. This is one of two final reports on the project.

ancillary services↗

Distributed Resource Energy Analysis and Management System (DREAMS) Development for Real-time Grid Operations

This project supports development of the next generation, integrated energy management infrastructure (EMS) able to incorporate advance visualization of behind-the-meter distributed resource information and probabilistic renewable energy generation forecasts to inform real-time operational decisions. The project involves end-users and active feedback from an Utility Advisory Team (UAT) to help inform how information can be used to enhance operational functions (e.g. unit commitment, load forecasting, Automatic Generation Control (AGC) reserve monitoring, ramp alerts) within two major EMS platforms. Objectives include: Engaging utility operations personnel to develop user input on displays, set expectations, test and review; Developing ease of use and timeliness metrics for measuring enhancements; Developing prototype integrated capabilities within two operational EMS environments; Demonstrating an integrated decision analysis platform with real-time wind and solar forecasting information and timely distributed resource information; Seamlessly integrating new 4-dimensional information into operations without increasing workload and complexities; Developing sufficient analytics to inform and confidently transform and adopt new operating practices and procedures; Disseminating project lessons learned through industry sponsored workshops and conferences;Building on collaborative utility-vendor partnership and industry capabilities

14 SOLAR ENERGY↗

Characterizing and analyzing ramping events in wind power, solar power, load, and netload

Here, one of the biggest concerns associated with integrating a large amount of renewable energy into the power grid is the ability to handle large ramps in the renewable power output. For the sake of system reliability and economics, it is essential for power system operators to better understand the ramping features of renewable, load, and netload. An optimized swinging door algorithm (OpSDA) is used and extended to accurately and efficiently detect ramping events. For wind power ramps detection, a process of merging 'bumps' (that have a different changing direction) into adjacent ramping segments is included to improve the performance of the OpSDA method. For solar ramps detection, ramping events that occur in both clear-sky and measured (or forecasted) solar power are removed to account for the diurnal pattern of solar generation. Ramping features are extracted and extensively compared between load and netload under different renewable penetration levels (9.77%, 15.85%, and 51.38%). Comparison results show that (i) netload ramp events with shorter durations and smaller magnitudes occur more frequently when renewable penetration level increases, and the total number of ramping events also increases; and (ii) different ramping characteristics are observed in load and netload even with a low renewable penetration level.

24 POWER TRANSMISSION AND DISTRIBUTION↗