Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “queuing model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

39 records · Page 3

Sheaf Theoretic Models for Routing in Delay Tolerant Networks

One key to communications scalability is routing; as such the goal of this paper is to build upon successful efforts towards general routing for space-based networks. With the ever-increasing accessibility of space, the number of assets is increasing, which becomes a critical communications burden in terms of scheduling, spectrum allocation, and resource allocation. In order to mitigate these concerns, a true networking approach is necessary; a standard approach for space systems is Delay Tolerant Networking (DTN). For DTN to be a meaningful answer to the Solar System Internet (SSI) question, DTN must offer meaningful routing solutions that span the heterogeneous collection of links and nodes. This, in turn, depends on the general structure of these disconnected networks -- a structure that remains largely unknown. In ground communications networks, routing decisions are made based on several pathfinding algorithms working in tandem. In previous work, we modeled Dijkstra's pathfinding algorithm using sheaves and provided a more general framework for determining paths using sheaves over graphs. Continuing our sheaf-theoretic approach, we introduce here an expansion of our pathfinding sheaf to handle more general information, and we expand on additional pathfinding algorithms that can be represented using sheaves. Moreover, we demonstrate means of combining multiple algorithms into a single sheaf structure so that changes of scale can be presented in the language of sheaves. In addition, space communications networks rely upon radio transmitter antennas which can establish broadcast and multicast communications options, rather than the primarily unicast options available to wired networks. Last year, we also introduced a multicast routing sheaf for presenting broadcast, unicast, and multicast communications over a graph. Extending that work, we also introduce queuing sheaves so that we can blend these communications options together to simulate a variety of routing options across space networks. In addition, we include examples to illustrate the applicability of this abstract theory to routing in disconnected networks.

Robert Short↗

The SGI/Cray T3E: Experiences and Insights

The NASA Goddard Space Flight Center is home to the fifth most powerful supercomputer in the world, a 1024 processor SGI/Cray T3E-600. The original 512 processor system was placed at Goddard in March, 1997 as part of a cooperative agreement between the High Performance Computing and Communications Program's Earth and Space Sciences Project (ESS) and SGI/Cray Research. The goal of this system is to facilitate achievement of the Project milestones of 10, 50 and 100 GFLOPS sustained performance on selected Earth and space science application codes. The additional 512 processors were purchased in March, 1998 by the NASA Earth Science Enterprise for the NASA Seasonal to Interannual Prediction Project (NSIPP). These two "halves" still operate as a single system, and must satisfy the unique requirements of both aforementioned groups, as well as guest researchers from the Earth, space, microgravity, manned space flight and aeronautics communities. Few large scalable parallel systems are configured for capability computing, so models are hard to find. This unique environment has created a challenging system administration task, and has yielded some insights into the supercomputing needs of the various NASA Enterprises, as well as insights into the strengths and weaknesses of the T3E architecture and software. The T3E is a distributed memory system in which the processing elements (PE's) are connected by a low latency, high bandwidth bidirectional 3-D torus. Due to the focus on high speed communication between PE's, the T3E requires PE's to be allocated contiguously per job. Further, jobs will only execute on the user specified number of PE's and PE timesharing is possible but impractical. With a highly varied job mix in both size and runtime of jobs, the resulting scenario is PE fragmentation and an inability to achieve near 100% utilization. SGI/Cray has provided several scheduling and configuration tools to minimize the impact of fragmentation. These tools include PScheD (the political scheduler), GRM (the global resource manager) and NQE (the Network Queuing Environment). Features and impact of these tools will be discussed, as will resulting performance and utilization data. As a distributed memory system, the T3E is designed to be programmed through explicit message passing. Consequently, certain assumptions related to code design are made by the operating system (UNICOS/mk) and its scheduling tools. With the exception of HPF, which does run on the T3E, however poorly, alternative programming styles have the potential to impact the T3E in unexpected and undesirable ways. Several examples will be presented (preceeded with the disclaimer, "Don't try this at home! Violators will be prosecuted!")

Bernard, Lisa Hamet↗

Event driven executive

Tasks may be planned for execution on a single processor or are split up by the designer for execution among a plurality of signal processors. The tasks are modeled using a design aid called a precedence graph, from which a dependency table and a prerequisite table are established for reference within each processor. During execution, at the completion of a given task, an end of task interrupt is provided from any processor which has completed a task to any and all other processors including itself in which completion of that task is a prerequisite for commencement of any dependent tasks. The relevant updated data may be transferred by the processor either before or after signalling task completion to the processors needing the updated data prior to commencing execution of the dependent tasks. Coherency may be ensured, however, by sending the data before the interrupt. When the end of task interrupt is received in a processor, its dependency table is consulted to determine those tasks dependent upon completion of the task which has just been signalled as completed, and task dependency signals indicative thereof are provided and stored in a current status list of a prerequisite table. The current status of all current prerequisites are compared to the complete prerequisites listed for all affected tasks and those tasks for which the comparison indicates that all prerequisites have been met are queued for execution in a selected order.

Tulpule, Bhalchandra R.↗