Engineering PapersSearch

SEARCH · Engineering Papers

Results for “propulsive maneuvers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Aeromaneuvering Orbit Transfer Vehicles for the space transport system

Alternatives to all-propulsive manned Orbit Transfer Vehicles (OTV) are presented that utilize aeromaneuvering in combination with propulsive maneuvering. A summary of the results of feasibility and concept definition studies is induced along with a discussion of the advantages and disadvantages of aeromaneuvering as compared with all-propulsive vehicles. Manned aeromaneuvering OTV concepts are described, including the Aeromaneuvering Orbit-to-Orbit Shuttle (AMOOS) for future orbital transportation and the Aeromaneuvering Recovery System (AMRS) for emergency recovery of crewmen from high-altitude orbits. Data are provided regarding aeromaneuvering OTV configurations, performance, systems, tradeoffs, mission applications, and major design parameters, such as dynamic pressure, heating rates, and guidance.

Hethcoat, J. P.

Maneuver Design Implementation and Verification for the Mars 2020 Mission

On February 18, 2021, the Perseverance rover landed in Jezero Crater on Mars, transported by the Mars 2020 spacecraft on a nearly seven-month journey to the Red Planet. The execution of three propulsive maneuvers during the interplanetary cruise phase was required to remove the launch-injection bias and deliver the spacecraft to the Mars atmospheric entry point. This paper focuses on the maneuver implementation and verification process between the navigation and spacecraft teams. Additionally, this paper discusses the execution error models that were used to determine maneuver performance and delivery accuracy at the atmospheric entry interface point.

Kruizinga, Gerhard

Orbit trim maneuver design and implementation for the 1975 Mars Viking Mission

The Viking Mission included the insertion of two unmanned spacecraft into orbit about Mars and the deployment of a soft-lander from each. A description is presented of the adaptive design and implementation of the spacecraft propulsive maneuvers as these flights progressed, taking into account also the inflight results for the orbital phase of the primary Viking mission. The design process included the selection of target parameters and the minimization of both propellant usage and the effects of execution errors, while complying with mission and operational constraints. All maneuvers performed to trim the spacecraft orbits are considered. Attention is given to navigation requirements, geometry definitions and terminology, maneuver mechanization and constraints, and maneuver capability.

Hintz, G. R.

Cassini - Huygens maneuver experience : cruise and arrival at Saturn

The Cassini-Huygens mission to Saturn and Titan was launched in 1997. It is an international effort to study the Saturnian system. Cassini-Huygens' interplanetary cruise delivered the spacecraft to Saturn in 2004. It also made use of many propulsive maneuvers, both statistical and deterministic. Maneuver-related analysis and performance for latter half of cruise is reported. The system has performed more accurately than the pre-launch expectations and requirements. Additionally, some maneuvers have already been skipped, saving propellant and flight team effort. Analysis of historical execution error data is presented.

Huygens

Mars Reconnaissance Orbiter Maneuver Plan Following Mars 2020 Landing

The Mars Reconnaissance Orbiter spacecraft continues to perform valuable science observations at Mars, provide telecommunication relay for surface assets, and characterize landing sites for future missions. The spacecraft provided the primary relay support for the Mars 2020 mission during entry, descent, and landing on February 18, 2021. This paper discusses the propulsive maneuver plan following the Mars 2020 landing to return the spacecraft to its primary science orbit by November 2021 and maintain it through 2029. Alternate maneuver plans considered for supporting Mars 2020 surface operations and the entry, descent, and landing of the ExoMars 2022 mission are also described.

Menon, Premkumar R.

Titan Flagship Mission 3-Degree-of-Freedom Simulation Analysis

A NASA flagship mission to Titan, the largest moon of Saturn and the only moon in the solar system with a significant atmosphere, has been designed that uses three separate spacecraft, each requiring significant interaction with the atmosphere. The first vehicle is a Titan lander for lower-atmosphere and surface science. The second is an aerial vehicle for aerial science at approximately 10 km altitude with an expected lifetime of one year. This spacecraft will use the natural winds of Titan to cover a large area over its lifetime. The third vehicle is a Titan orbiter that will interact with the atmosphere in two respects. The first atmospheric interaction is the orbital insertion maneuver that will be accomplished using aerocapture, during which time the hyperbolic approach of 6.5 km/s will be reduced to 1.6 km/s over 41 minutes with an exit periapsis altitude of 130 km. The second atmospheric interaction occurs after a propulsive maneuver has raised the periapsis after aerocapture to 1170 km, where the atmosphere will be sampled over several months. This is the first phase of aerosampling that covers southern latitudes. After a 3.3-year circular science phase at an altitude of 1700 km, a second phase of additional aerosampling is performed sampling northern latitudes. The atmospheric trajectory analysis for these three spacecraft will be discussed throughout this paper.

Prince, Jill L.

Approximate solutions to minimax optimal control problems for aeroassisted orbital transfer

The maneuver considered in the present investigation involves the coplanar transfer of a spacecraft from a high earth orbit (HEO) to a low earth orbit (LEO). HEO can be a geosynchronous earth orbit (GEO). The basic concept utilized involves the hybrid combination of propulsive maneuvers in space and aerodynamic maneuvers in the sensible atmosphere. The considered type of flight is also called synergetic space flight. With respect to the atmospheric part of the maneuver, trajectory control is achieved by means of lift modulation. The Bolza problem of optimal control is stated, and the first-order optimality conditions for this problem are given. The one-arc approach, the two-arc approach, and the three-subarc approach are discussed. Attention is given to the Chebyshev problem of optimal control, details concerning aeroassisted orbital transfer (AOT), AOT optimization problems, and numerical experiments.

Miele, A.

Concept for a manned Mars flyby

A concept is presented for a three man crew to fly by the planet Mars. The ground rule for the study is to execute the mission as quickly as possible which dictates using late 1990's technologies and space infrastructure. The proposed mission described herein uses a preliminary concept for the agency's Manned Orbit Transfer Vehicle (MOTV) and proposed space station elements. The space vehicle will depart from the LEO space station and is delivered to Low Earth Orbit (LEO) by a future launch vehicle of a Shuttle Derived Launch Vehicle (SDV) class. The trajectory parameters are chosen such that the mission duration is on the order of one year, with a two and one-half hour period within ten planetary radii of Mars. If the issues of acceptable crew g loads and entry vehicle heat load can be resolved, then the returning vehicle can aerobrake at Earth into a space station compatible orbit. Otherwise, a propulsive maneuver will be required to reduce vehicle velocity prior to Earth entry interface. It is possible to execute a mission of reasonable capability at an initial LEO departure weight of 716,208 pounds for the aerobraked case of 1,350,000 pounds for the propulsive case.

Barney B Roberts

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003(dagger), and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) - 2 days were +/-0.12(deg) (3(sigma)) for Spirit and +/-0.14(deg) (3(sigma)) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary avigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was +/-0.028(deg) (3(sigma) ) for Spirit and +/-0.035(deg) (3(sigma)) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)

Performance analysis of a laser propelled interorbital tansfer vehicle

Performance capabilities of a laser-propelled interorbital transfer vehicle receiving propulsive power from one ground-based transmitter was investigated. The laser transmits propulsive energy to the vehicle during successive station fly-overs. By applying a series of these propulsive maneuvers, large payloads can be economically transferred between low earth orbits and synchronous orbits. Operations involving the injection of large payloads onto escape trajectories are also studied. The duration of each successive engine burn must be carefully timed so that the vehicle reappears over the laser station to receive additional propulsive power within the shortest possible time. The analytical solution for determining these time intervals is presented, as is a solution to the problem of determining maximum injection payloads. Parameteric computer analysis based on these optimization studies is presented. The results show that relatively low beam powers, on the order of 50 MW to 60 MW, produce significant performance capabilities.

Minovitch, M. A.

Manned Mars flyby mission and configuration concept

A concept is presented for a flyby mission of the planet. The mission was sized for the 2001 time period, has a crew of three, uses all propulsive maneuvers, and requires 442 days. Such a flyby mission results in significantly smaller vehicles than would a landing mission, but of course loses the value of the landing and the associated knowledge and prestige. Stay time in the planet vicinity is limited to the swingby trajectory but considerable time still exists for enroute science and research experiments. All propulsive braking was used in the concept due to unacceptable g-levels associated with aerobraking on this trajectory. LEO departure weight for the concept is approximately 594,000 pounds.

Archie Young

Navigation and the Mars global surveyor mission

Navigation and trajectory planning aspects for the Mars global surveyor (MGS) mission, are discussed. In the first 205 days of the mission since launch on 7 November July 1996, two trajectory maneuvers were successfully completed. The third maneuver was cancelled due to the accuracy of the targeting of the previous maneuvers. The final trajectory correction maneuver will occur on arrival in order to adjust the arrival conditions for the Mars orbit insertion maneuver. The planned capture orbit is highly elliptical with a 45 hour orbital period, a 300 km periapsis altitude and a descending node. Two-way coherent Doppler and time delay measurements are acquired in the X-band by the Deep Space network and used to navigate the spacecraft. After capture, the orbit will be circularized by aerobraking and propulsive maneuvers. The three-phase aerobraking maneuver is described. During the 687 earth-day observation period, navigation will maintain a 2:00 pm descending node, sun-synchronous low altitude, short periodic orbit. Ground track coverage will remain almost uniform in order to maximize data acquisition.

Esposito, P.

Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity

NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.

Moon missions

Halo orbit station keeping for International Sun-Earth Explorer-C /ISEE-C/

The ISEE-C spacecraft must be kept close to an unstable 'halo' orbit with a series of discrete orbital maneuvers set at intervals at least one month apart. A numerical algorithm has been developed to compute a velocity correction at any point on the trajectory which will minimize the distance between the satellite orbit and the nominal halo path. This algorithm is used to generate a number of station keeping histories with fixed time intervals between maneuvers to ascertain bounds on fuel cost, tightness of fit to nominal path and expected duration between thrust applications. The difference between a third order analytic representation of the halo orbit and a numerically improved nominal path as a reference orbit in the station keeping scheme is investigated as well as the distinction between a tight control and a loose control. A simulation of an operational approach to station keeping is also presented which shows that intermittant propulsive maneuvers can be used to control the spacecraft with very modest fuel expenditure.

Heuberger, H.

Natural Hazards of the Space Environment

Spacecraft in Low Earth Orbit (LEO) are subject to numerous environmental hazards. Here I'll briefly discuss three environment factors that pose acute threats to the survival of spacecraft systems and crew: atmospheric drag, impacts by meteoroids and orbital debris, and ionizing radiation. Atmospheric drag continuously opposes the orbital motion of a satellite, causing the orbit to decay. This decay will lead to reentry if not countered by reboost maneuvers. Orbital debris is a by-product of man's activities in space, and consists of objects ranging in size from miniscule paint chips to spent rocket stages and dead satellites. Ionizing radiation experienced in LEO has several components: geomagnetically trapped protons and electrons (Van Allen belts); energetic solar particles; galactic cosmic rays; and albedo neutrons. These particles can have several types of prompt harmful effects on equipment and crew, from single-event upsets, latchup, and burnout of electronics, to lethal doses to crew.All three types of prompt threat show some dependence on the solar activity cycle. Atmospheric drag mitigation and large debris avoidance require propulsive maneuvers. M/OD and ionizing radiation require some form of shielding for crew and sensitive equipment. Limiting exposure time is a mitigation technique for ionizing radiation and meteor streams.

Evans, Steven W.

Propulsion System and Orbit Maneuver Integration in CubeSats: Trajectory Control Strategies Using Micro Ion Propulsion

The Propulsion System and Orbit Maneuver Integration in CubeSats project aims to solve the challenges of integrating a micro electric propulsion system on a CubeSat in order to perform orbital maneuvers and control attitude. This represents a fundamentally new capability for CubeSats, which typically do not contain propulsion systems and cannot maneuver far beyond their initial orbits.

Propulsion

A Study on the Effects of J2 Perturbations on a Drag-Free Control System for Spacecraft in Low Earth Orbit

Low Earth Orbit (LEO) missions provide a unique means of gathering information about many of Earth s aspects such as climate, atmosphere, and gravitational field. Among the greatest challenges of LEO missions are designing, predicting, and maintaining the spacecraft orbit. The predominant perturbative forces acting on a spacecraft in LEO are J2 and higher order gravitational components, the effects of which are fairly easy to predict, and atmospheric drag, which causes the greatest uncertainty in predicting spacecraft ephemeris. The continuously varying atmospheric drag requires increased spacecraft tracking in order to accurately predict spacecraft location. In addition, periodic propulsive maneuvers typically must be planned and performed to counteract the effects of drag on the spacecraft orbit. If the effects of drag could be continuously and autonomously counteracted, the uncertainty in ephemeris due to atmospheric drag would essentially be eliminated from the spacecraft dynamics. One method of autonomous drag compensation that has been implemented on some missions is drag-free control. Drag-free control of a spacecraft was initially proposed in the 1960's and is discussed extensively by Lange. His drag-free control architecture consists of a free-floating proof mass enclosed within a spacecraft, isolating it from external disturbance forces such as atmospheric drag and solar radiation pressure. Under ideal conditions, internal disturbance forces can be ignored or mitigated, and the orbit of the proof mass depends only on gravitational forces. A sensor associated with the proof mass senses the movement of the spacecraft relative to the proof mass. Using the sensor measurements, the spacecraft is forced to follow the orbit of the proof mass by using low thrust propulsion, thus counteracting any non-gravitational disturbance forces. If the non-gravitational disturbance forces are successfully removed, the spacecraft s orbit will be affected only by well-known gravitational forces and will thus be easier to predict.

Vess, Melissa Fleck

Smallsat 2024 - Starling Cubesat Swarm Technology Demonstration Flight Results

The Starling swarm of four 6U CubeSats launched in July 2023 to test four key technologies to enable future swarm missions: 1) Mobile Ad-Hoc Networking (MANET) over a crosslink radio network 2) Autonomous onboard decision-making for operations 3) Optical-based absolute and relative navigation 4) Autonomous maneuver planning and execution The Starling team implemented the Better Approach to Mobile Ad-hoc Networking (B.A.T.M.A.N.) protocol to automatically manage the crosslink network of four satellites. The B.A.T.M.A.N. protocol uses a decentralized approach to managing a multi-hop mesh network of devices, in this case, a satellite swarm. The four satellites were able to successfully establish a network at multiple data rates and demonstrate file transfer and command issuance between spacecraft over the network. Starling incorporated Distributed Spacecraft Autonomy's (DSA) software to demonstrate onboard decision-making. The DSA software takes L1/L2 band GPS measurements and uses them to estimate the relative Total Electron Count (TEC) in the ionosphere. The onboard software then determines if there are any features of interest and provides that information to the other satellites over the crosslink network. The swarm of satellites then reaches a consensus on the optimal TEC observation strategy and adjusts its measurement collection tactics autonomously. The Starling Formation-Flying Optical Experiment (StarFOX), produced by Stanford's Space Rendezvous Laboratory, uses the onboard star trackers to collect images of the other swarm spacecraft and produce angles-only navigation estimates. This system is envisioned to be valuable in applications in which Global Navigation Satellite Systems (GNSS) are not available, such as in cis-lunar or deep space. StarFOX successfully applied its algorithms to multiple simultaneous spacecraft targets using the star tracker imagery. Finally, Starling used Emergent Space's Cluster Flight Application (CFA) software suite for the Reconfiguration and Orbit Maintenance Experiments Onboard (ROMEO) demonstration of autonomously planning and executing propulsive maneuvers. Large swarms will need to be able to maintain formation requirements with minimal operator involvement, especially as the size of the swarm scales up. Results from the ROMEO experiment are presented. Starling is funded by the Small Spacecraft Technology (SST) program out of NASA's Space Technology Mission Directorate (STMD).

distributed systems