Engineering PapersSearch

SEARCH · Engineering Papers

Results for “projection operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The gravitational lensing imprints of DES Y3 superstructures on the CMB: a matched filtering approach

Low-density cosmic voids gravitationally lens the cosmic microwave background (CMB), leaving a negative imprint on the CMB convergence |$\kappa$|⁠. This effect provides insight into the distribution of matter within voids, and can also be used to study the growth of structure. We measure this lensing imprint by cross-correlating the Planck CMB lensing convergence map with voids identified in the Dark Energy Survey Year 3 (DES Y3) data set, covering approximately 4200 deg|$^2$| of the sky. We use two distinct void-finding algorithms: a 2D void-finder that operates on the projected galaxy density field in thin redshift shells, and a new code, Voxel, which operates on the full 3D map of galaxy positions. We employ an optimal matched filtering method for cross-correlation, using the Marenostrum Institut de Ciències de l’Espai N-body simulation both to establish the template for the matched filter and to calibrate detection significances. Using the DES Y3 photometric luminous red galaxy sample, we measure |$A_\kappa$|⁠, the amplitude of the observed lensing signal relative to the simulation template, obtaining |$A_\kappa = 1.03 \pm 0.22$| (⁠|$4.6\sigma$| significance) for Voxel and |$A_\kappa = 1.02 \pm 0.17$| (⁠|$5.9\sigma$| significance) for 2D voids, both consistent with Lambda cold dark matter expectations. We additionally invert the 2D void-finding process to identify superclusters in the projected density field, for which we measure |$A_\kappa = 0.87 \pm 0.15$| (⁠|$5.9\sigma$| significance). The leading source of noise in our measurements is Planck noise, implying that data from the Atacama Cosmology Telescope, South Pole Telescope and CMB-S4 will increase sensitivity and allow for more precise measurements.

79 ASTRONOMY AND ASTROPHYSICS

(SPT-)LSM theorems from projective non-invertible symmetries

Projective symmetries are ubiquitous in quantum lattice models and can be leveraged to constrain their phase diagram and entanglement structure. In this paper, we investigate the consequences of projective algebras formed by non-invertible symmetries and lattice translations in a generalized 1+1 1 + 1 D quantum XY model based on group-valued qudits. This model is specified by a finite group G G and enjoys a projective \mathsf{Rep}(G)× Z(G) 𝖱 𝖾 𝗉 ( G ) × Z ( G ) and translation symmetry, where symmetry operators obey a projective algebra in the presence of symmetry defects. For invertible symmetries, such projective algebras imply Lieb-Schultz-Mattis (LSM) anomalies. However, this is not generally true for non-invertible symmetries, and we derive a condition on G G for the existence of an LSM anomaly. When this condition is not met, we prove an SPT-LSM theorem: any unique and gapped ground state is necessarily a non-invertible weak symmetry protected topological (SPT) state with non-trivial entanglement, for which we construct an example fixed-point Hamiltonian. The projectivity also affects the dual symmetries after gauging \mathsf{Rep}(G)× Z(G) 𝖱 𝖾 𝗉 ( G ) × Z ( G ) sub-symmetries, giving rise to non-Abelian and non-invertible dipole symmetries, as well as non-invertible translations. We complement our analysis with the SymTFT, where the projectivity causes it to be a topological order non-trivially enriched by translations. Throughout the paper, we develop techniques for gauging \mathsf{Rep}(G) 𝖱 𝖾 𝗉 ( G ) symmetry and inserting its symmetry defects on the lattice, which are applicable to other non-invertible symmetries.

Pace, Salvatore D. (ORCID:0000000306093335)

Solar and Storage Integration in the U.S. Southeast: Implications for Resource Adequacy

Resource adequacy concerns may be very different in electricity systems that have higher levels of solar and storage, requiring changes to existing planning models. This study explores a novel approach to evaluating resource adequacy under future scenarios with higher solar and storage in the Southeast U.S. It uses NREL’s Probabilistic Resource Adequacy Suite (PRAS), a collection of probabilistic resource adequacy modeling tools, and compares results when interacting PRAS and a portfolio planning tool with a more traditional modeling approach. The results suggest that traditional models perform reasonably well with lower levels of solar PV, but at higher levels of solar probabilistic tools better capture the changes in resource adequacy concerns—such as winter energy availability—associated with higher solar systems. This is the final study in the Preparing Southeast Markets for Reliable and Affordable Integration of Solar into Operations and Planning project. Two prior reports can be found at: Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations. https://emp.lbl.gov/publications/solar-and-storage-integration Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region. https://eta-publications.lbl.gov/sites/default/files/2024-11/multiutility_fe_reserve_sharing_final.pdf

14 SOLAR ENERGY

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION

TA-54 Flanged Tritium Waste Container Operations, Radioactive Air Emissions Summary Volume 1: Stack Emissions & Off-Site Dose Consequence

In September 2025, pressure mitigation operations began on the four Flanged Tritium Waste Containers (FTWCs) that had been in storage at Los Alamos National Laboratory (LANL), Technical Area (TA-) 54, Area G, Building 1028. Each FTWC was opened at TA-54 and put into a stable configuration, then containers were moved to LANL’s Weapons Engineering Tritium Facility (WETF) for further processing in preparation for shipment off-site. Over the course of 13 operational days, the project had air emissions of 123 curies of tritium (hydrogen-3). The radiological dose to the hypothetical maximally exposed individual (MEI) member of the public from these emissions was 0.012 millirem. This is well within the limits established by the Environmental Protection Agency (EPA), which allows 10 millirem per year to any member of the public. Naturally occurring background radiation in Northern New Mexico averages about 300-400 millirem per year to residents. This report is intended to briefly summarize operations that took place in September and October 2025, provide documentation of the radionuclide air emissions from these operations, and summarize the off-site dose consequence to the public that resulted from these air emissions. Informal notifications addressing these areas were made via email to the EPA and NMED throughout the project, and summaries of these data were also posted on the LANL external web site 1 for FTWC operations.

54 ENVIRONMENTAL SCIENCES

Restructuring and Optimizing Reactor Building Lifting Processes & Designing a Solution for an Overhead Door Handling Forklift Attachment

This poster presents two innovative projects aimed at enhancing operational efficiency and safety at the Advanced Test Reactor (ATR) Complex. The first project focuses on restructuring the existing lift book used for hoisting operations within the ATR Reactor Building. The current lift book, a cumbersome 150+ page document, is being transformed into a more efficient format using charts that allow for quick identification of maximum lift heights based on object footprint and weight. This new method also considers various parameters such as floor integrity and reactor status, dividing entries into four distinct charts to improve usability and safety during lifts. The second project involves designing a specialized forklift attachment for handling an overhead door at the ATR Reactor Building. The attachment is engineered to securely lift and lower a 1200lb, 14ft long door, ensuring safe replacement operations. The design process included research on forklift attachment codes, modeling in Autodesk Inventor, and testing through Finite Element Analysis (FEA) and hand calculations to confirm the attachment's structural integrity. Future work includes completing detailed drawings and an Engineering Calculations Analysis and Review (ECAR) document to proceed with manufacturing and assembly. Together, these projects demonstrate a commitment to optimizing reactor building operations through innovative engineering solutions and safety considerations.

42 - ENGINEERING

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal

Loss Factors for Small Distributed Wind Turbines Based on Field Data in the United States

While wind energy production loss due to unavailability, environmental impacts, curtailment, and other causes has been studied and characterized at the utility-scale wind farm level, observation-based characterization of project loss is lacking for distributed wind energy, particularly for projects involving small wind turbines. Contemporary tools and research that support pre-construction distributed wind energy characterization present a wide range of default loss factors to convert gross energy estimates to net: 7-18%. We hypothesize that we can use generation observations from operational distributed wind projects to develop more accurate representations of loss. Using a density-based filtering technique on distributed wind power generation timeseries, we determine periods of typical performance and use them with regression algorithms in a measure-correlate-predict fashion to simulate what the generation would have been during periods of atypical or unreported performance. From there, the actual versus predicted generation leads to the establishment of observation-informed loss factors (median = 17%) for small, single turbine installation distributed wind projects.

17 WIND ENERGY

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Nano Filters for Selective Metal Capture (CRADA Final Report)

As part of the Cyclotron Road program, Sunchem investigated novel nanoporous materials and their metal extraction performance in both batch and dynamic continuous flow operations. The proposed project developed novel nanoporous materials for selective metal extraction from complex industrial mixtures. The technical objectives were to synthesize and characterize the nanoporous materials, structure the nanoporous materials with binders along with structuring techniques and evaluate its performance in both a batch and dynamic continuous flow operation. The nanoporous material was structured through a disc granulation method to obtain particles in the size range of 250 to 500 micron diameter. This structured material was packed into a continuous flow column which achieved up to 48 wt% of gold capture. This work aimed to address the key technical risk of the materials’ capability to be employed in an industrial operation with competitive performance compared to other adsorbents.

36 MATERIALS SCIENCE

CO2 Storage Economic Analysis: CarbonSAFE Use Case

Poster on “CO2 Storage Economic Analysis: CarbonSAFE Use Case” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. The cost of designing, permitting, constructing, operating, and closing a CO2 storage project is of vital importance to project developers. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. This study presents a collaborative economic analysis applying TALES with data from the San Juan Basin CarbonSAFE Phase III project led by the New Mexico Institute of Mining and Technology to estimate potential costs incurred during the implementation of a real-world commercial-scale carbon storage project. Scenario analysis was implemented in which different operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics, first-year breakeven price of CO2 ($/tonne) and net present value (NPV), are presented for base and alternative cases. Output provides a unique perspective for project stakeholders towards evaluating the influence of different operational strategies and financing approaches on overall project cost and financial viability.

carbon storage

Ash Fouling Free Regenerative Air Preheater for Deep Cyclic Operation

The University of Kentucky (UKy) project titled “Ash Fouling Free Regenerative Air Preheater for Deep Cyclic Operation”, DE-FE0031757, was conducted from 8/15/2019 to 8/14/2024 in two Budget Periods. Other participants included PPL Corporation and Black Dragon Double Boiler. The overall goal was to investigate the proposed self-cleaning technology to achieve ash fouling free air preheater operation in a coal-fired power plant, especially during deep cycling. All project deliverables, milestones, and success criteria were met. UKy obtained the following scientific findings. • Temporary and periodic high temperature of heating elements (450 ~ 500 °F) can prevent ash accumulation and maintain air preheater free of clogging. • The ash samples analysis and unit operation provide solid evidence of ABS formed during low load with SCR ammonia slip being the major cause of ash accumulation, and air preheater clogging can be prevented by raising the heating element temperature up to 450 °F~ 500 °F at which ABS is decomposed. • In-situ self-cleaning can be controlled by monitoring temperature and/or presetting fixed number of cleanings per day. Both approaches in pilot testing show positive results for maintaining an ash free state for the air preheater. • Temperature criteria (cold end or gas outlet temperature) for entering self-cleaning service is critical to balance the number of cleaning cycles with maintaining the ash level. • Temperature criteria (cold end or gas outlet temperature) for exiting self-cleaning service is critical to balance the duration of the cleaning cycles with maintaining the ash level.

01 COAL, LIGNITE, AND PEAT

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY

Control System Upgrade for Battery State-of-Charge Indications

The Advanced Test Reactor (ATR) Complex at Idaho National Laboratory (INL) relies on Battery Backed Power (BBP) systems and Uninterruptible Power Supplies (UPS) to ensure continuous power supply to critical components. This project aims to enhance the reliability and functionality of the battery monitoring and control systems by updating the State-of-Charge (SOC) system, Programmable Logic Controller (PLC), and Human-Machine Interface (HMI) for the nuclear safety-related battery banks. The current system, while functional, has areas for improvement, particularly in recharging calculations and alarm functions. The project objectives include developing flow charts, programming the new PLC and HMI, conducting bench tests, and updating design documentation. Additionally, the project ensures compliance with safety standards, develops training materials, creates comprehensive documentation, and integrates seamlessly with existing ATR infrastructure. The new SOC system is designed to be scalable for future upgrades, improve efficiency, enhance data accuracy, implement redundancy features, and achieve project goals within budget constraints while considering environmental impact. The methodology involved familiarizing with BBP and UPS systems, collecting current readings, rescaling signals, learning ladder logic, and updating the HMI. The transition from SLC 5/03 PLC using RS Logix 500 to CompactLogix 5380 using Studio 5000 was a key step. Despite challenges in transferring outdated PLC ladder logic and HMI code, starting from scratch led to a more accurate and efficient monitoring system, contributing to improved safety and operational efficiency. The project is currently awaiting approval of the Engineering Calculation and Analysis Report (ECAR) before implementation.

42 - ENGINEERING

ROTA-CAP™: An Intensified Carbon Capture System Using Rotating Packed Beds (Final Scientific/Technical Report)

GTI Energy and Carbon Clean Solutions Limited successfully designed, constructed, and operated an integrated ROTA-CAP carbon capture skid. ROTA-CAP™ is a process intensification technology, applied for post-combustion carbon capture, which utilizes the centrifugal forces generated from rotation of rotating packed beds as well as advanced solvents to achieve increased mass transfer rates 1-2 orders of magnitude higher than conventional columns while substantially decreasing footprint. The test skid, which consisted of a dual stage RPB absorber with external interstage cooling and a single stage RPB regenerator, was operated at capacities up to 0.5 tonne/day of CO 2 capture with flue gas concentrations ranging from 4% to 22% CO 2 by vol. CO 2 removal rates greater than 95% were achieved, with CO 2 product purity also exceeding 95% by vol. Over 1,600 hours of operation were accumulated throughout the project, including over 1,000 hours of operation of the with real flue gas containing at least 9.8% CO 2 by vol. The skid was operated continuously for 24 hours per day and 7 days per week over the course of 7 long-term test campaigns, with the campaigns ranging from approximately 2-4 weeks per campaign. A techno-economic analysis was performed, and a cost of capture of $\$$41.18/tonne CO 2 was calculated for the ROTA-CAP process, compared to $\$$45.75/tonne for a Cansolv-based process. These results show a cost reduction of approximately 10% compared to the Cansolv-based process. Although this still exceeds the target cost of capture of $\$$30/tonne specified for this project, GTI expects that the cost of capture can be further reduced through further optimization of the design and technology. GTI also performed an engineering design review to determine the scale-up potential of the technology, with the results of the preliminary assessment indicating that it appears to be feasible to scale up the RPB technology to 4,000 TPD. It was also determined that both horizontal and vertical rotor orientations are feasible, though there are mechanical advantages to the vertical orientation.

20 FOSSIL-FUELED POWER PLANTS

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Simple and Scalable Process for Nanocellulose Production from Residues and Waste (CRADA Final Report)

This project successfully developed an innovative, cost-effective, and scalable method for converting low-cost agricultural waste feedstocks into nanocellulose—a sustainable material with wide-ranging industrial applications. It addressed the critical challenges of high production costs and limited global supply, which have hindered the widespread adoption of nanocellulose in industry. Through this work, significant advancements were made in optimizing resource use, improving process efficiency, and reducing costs. Notable achievements included a 50% reduction in water usage, 30% lower chemical consumption, and 20% energy savings, all while maintaining high-quality product standards. The technical feasibility of the process was further validated at a 10L scale in collaboration with the Advanced Biofuels and Bioproducts Development Unit (ABPDU), demonstrating scalability and replicability. Key challenges in reducing nanocellulose production costs were addressed by utilizing low-cost biomass feedstocks and implementing low-temperature conversion reactions, leading to lower capital and operating expenses. The project also mitigated financial risk by generating critical data on the feasibility, adaptability, and scalability of the conversion technology, paving the way for its commercial implementation. Public benefits include advancing the circular bioeconomy, reducing environmental impact, fostering job creation, and enabling a shift toward biobased materials as sustainable alternatives to fossil-based products. These outcomes align closely with national goals to reduce greenhouse gas emissions and promote sustainable technological innovation.

09 BIOMASS FUELS

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS