Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “project information”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Climate Change Impact Uncertainties for Maize in Panama: Farm Information, Climate Projections, and Yield Sensitivities

We present results from a pilot project to characterize and bound multi-disciplinary uncertainties around the assessment of maize (Zea mays) production impacts using the CERES-Maize crop model in a climate-sensitive region with a variety of farming systems (Panama). Segunda coa (autumn) maize yield in Panama currently suffers occasionally from high water stress at the end of the growing season, however under future climate conditions warmer temperatures accelerate crop maturation and elevated CO (sub 2) concentrations improve water retention. This combination reduces end-of-season water stresses and eventually leads to small mean yield gains according to median projections, although accelerated maturation reduces yields in seasons with low water stresses. Calibrations of cultivar traits, soil profile, and fertilizer amounts are most important for representing baseline yields, however sensitivity to all management factors is reduced in an assessment of future yield changes (most dramatically for fertilizers), suggesting that yield changes may be more generalizable than absolute yields. Uncertainty around General Circulation Model (GCM)s' projected changes in rainfall gain in importance throughout the century, with yield changes strongly correlated with growing season rainfall totals. Climate changes are expected to be obscured by the large inter-annual variations in Panamanian climate that will continue to be the dominant influence on seasonal maize yield into the coming decades. The relatively high (A2) and low (B1) emissions scenarios show little difference in their impact on future maize yields until the end of the century. Uncertainties related to the sensitivity of CERES-Maize to carbon dioxide concentrations have a substantial influence on projected changes, and remain a significant obstacle to climate change impacts assessment. Finally, an investigation into the potential of simple statistical yield emulators based upon key climate variables characterizes the important uncertainties behind the selection of climate change metrics and their performance against more complex process-based crop model simulations, revealing a danger in relying only on long-term mean quantities for crop impact assessment.

Maize↗

2020 State of the Science Report, Chapter 12: Adaptive Management Related to Marine Renewable Energy

As the marine renewable energy (MRE) industry is rapidly ramped up from single devices to commercial-scale deployments, developers and regulators will need evidence of the environmental effects of MRE to inform project development and consenting/permitting (hereafter consenting) processes. Uncertainty surrounding the potential impacts of novel RE technologies on sensitive marine animals, habitats, and ecosystem processes means that even robust baseline environmental information cannot comprehensively address all pre-deployment knowledge gaps. Tools and practical approaches are needed to help with the sustainable development of the industry. Adaptive management (AM), also referred to as learning by/while doing, enables projects to be deployed incrementally, despite uncertainty, in a way that prevents unacceptable harm to the marine environment. If rigorously implemented, this approach may provide a reliable mechanism for closing knowledge gaps, thereby retiring risks for future MRE developments. This chapter explores and suggests a pathway for applying a passive approach to AM for the consenting of single devices and array-scale MRE projects. Complementary information is available online at https://tethys.pnnl.gov/state-of-thescience-2020 -supplementaryadaptive-management. https://tethys.pnnl.gov/publications/state-of-the-science-2020-chapter-12-adaptive-management

16 TIDAL AND WAVE POWER↗

Quick-look guide to the crustal dynamics project's data information system

Described are the contents of the Crustal Dynamics Project Data Information System (DIS) and instructions on the use of this facility. The main purpose of the DIS is to store all geodetic data products acquired by the Project in a central data bank and to maintain information about the archive of all Project-related data. Access and use of the DIS menu-driven system is described as well as procedures for contacting DIS staff and submitting data requests.

Noll, Carey E.↗

Metagenome-assembled genomes from soil samples in control and warming plots in Blodgett Forest, CA (2014-2021)

The pathways of carbon transport and loss through and from soils—soil organic matter (SOM) depolymerization to dissolved organic carbon and mineralization to carbon dioxide (CO2)—are fundamentally driven by microbial activity, which is strongly regulated by environmental conditions. As part of LBNL (Lawrence Berkeley National Laboratory) TES (Terrestrial Ecosystem Science) Belowground Biogeochemistry Science Focus Area (SFA), we have established a novel whole-soil long-term warming experiment at the University of California (UC) Blodgett Forest Research Station (Sierra Nevada) in 2014, where we study the role of biogeochemical, microbial and geochemical process interactions in SOM decomposition and stabilization.Here, we present metagenome-assembled genomes (MAGs) for the bacterial and archaeal community from soil depth profiles collected from 2014 to 2021 from three paired control and warming plots. We collected soil samples across a range of depth profiles (spanning surface to 90 cm deep) from three paired control and warming plots from a temperate mixed forest in Northern California. Each paired plot had been subjected to experimental warming since June 2014 to simulate a predicted climate change scenario for northern California. 101 soil metagenomes were sequenced at JGI (Joint Genome Institute) and UCSF (University of California San Francisco) Center for Advanced Technology and can be found under the JGI (Joint Genome Institute) GOLD (Genomes Online Database) Sequencing project Gs0151586 and NCBI (National Center for Biotechnology Information) Projects PRJNA1225762 and PRJEB39497. Metagenomes were assembled using JGI (Joint Genome Institute) Metagenome Workflow (10.1128/mSystems.00804-20). For each metagenome, the assembled contigs were binned into genomes using 3 binning algorithms (cocacola, metabat, and maxbin) and the resulting bins were consolidated using dastool. The consolidated bins from all metagenomes were pooled, filtered by completeness (>50%) and contamination (<25%), and dereplicated at 99% ANI (average nucleotide identity) using dRep (https://github.com/MrOlm/drep).The dataset includes a zip file of 2321 MAG (Metagenome Assembled Genome) fasta files, the accession numbers for the underlying metagenomes, and a csv file with MAG (Metagenome Assembled Genome) quality metrics and taxonomic classification (GTDB -Genome Taxonomy Database-RS220). This dataset also includes a file-level metadata (flmd.csv) file that lists each file contained in the dataset with associated metadata and a data dictionary (dd.csv) file that contains column/row headers used throughout the files along with a definition, units, and data type. A sample metadata file (samples.csv) that contains site information has also been included.

54 ENVIRONMENTAL SCIENCES↗

The integrated scheduling system: A case study in project management

A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

Bishop, Peter C.↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

A Planetary Protection Strategy for the Mars Aerial Regional-Scale Environmental Survey (ARES) Mission Concept

The Aerial Regional-scale Environmental Survey (ARES) is a Mars exploration mission concept designed to send an airplane to fly through the lower atmosphere of Mars, with the goal of taking scientific measurements of the atmosphere, surface, and subsurface phenomenon. ARES was first proposed to the Mars Scout program in December 2002 for a 2007 launch opportunity and was selected to proceed with a Phase A study, step-2 proposal which was submitted in May 2003. ARES was not selected for the Scout mission, but efforts continued on risk reduction of the atmospheric flight system in preparation for the next Mars Scout opportunity in 2006. The ARES concept was again proposed in July 2006 to the Mars Scout program but was not selected to proceed into Phase A. This document describes the Planetary Protection strategy that was developed in ARES Pre Phase-A activities to help identify, early in the design process, certain hardware, assemblies, and/or subsystems that will require unique design considerations based on constraints imposed by Planetary Protection requirements. Had ARES been selected as an exploration project, information in this document would make up the ARES Project Planetary Protection Plan.

Kuhl, Christopher A.↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

Science Desk: General Overview

This viewgraph presentation discusses information sharing and other management procedures between related groups of scientists. ScienceOrganizer is an information repository and digital library for use by distributed scientific project teams which enables the storage and retrieval of heterogeneous project information in multiple formats. Over time, usage by persons results in the development of an increasingly information-rich knowledge base and network. Some of the engineering details include the determination of useful navigation hubs by which users can most easily navigate the information management system.

Keller, Richard M.↗

ScienceOrganizer System and Interface Summary

ScienceOrganizer is a specialized knowledge management tool designed to enhance the information storage, organization, and access capabilities of distributed NASA science teams. Users access ScienceOrganizer through an intuitive Web-based interface that enables them to upload, download, and organize project information - including data, documents, images, and scientific records associated with laboratory and field experiments. Information in ScienceOrganizer is "threaded", or interlinked, to enable users to locate, track, and organize interrelated pieces of scientific data. Linkages capture important semantic relationships among information resources in the repository, and these assist users in navigating through the information related to their projects.

Keller, Richard M.↗

Using Cyber-Informed Engineering for Cyber Defense Workbook

This workbook was prepared for a detailed workshop in Cyber-Informed Engineering. It is designed to provide an audience of electrical cooperative engineering staff with an opportunity to practice leveraging the principles of Cyber-Informed Engineering for a hypothetical system upgrade. This workbook contains material describing the fictional project, information about Cyber-Informed Engineering, hands-on exercises, and a copy of the slides presented during the workshop. It can stand alone as a CIE resource.

42 ENGINEERING↗

Managing Information On Technical Requirements

Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

Mauldin, Lemuel E., III↗

eProject Builder (ePB) v3.1

eProject Builder (ePB) is a secure, web-based system that enables agencies and ESCOs to securely: (1) preserve, track, and access energy project information for the life of the contract (2) quickly generate data and reports for their portfolio of projects (3) develop project scenarios using standardized amortization calculations (4) benchmark new projects against historical project data

Larsen, Peter↗