Progress updates for the Hanford waste treatment and immobilization plant project - 15593

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In recent years, the project has encountered issues that affected project design completion, especially in the Pretreatment and High-Level Waste Facilities. These included technical issues, changes in requirements, changes in funding, weaknesses in the nuclear supply chain, identification of new hazards, and new information about the tank waste. The combination of these issues led to a suspension of construction of the Pretreatment Facility and a partial suspension of construction of the High-Level Waste Facility in mid-2012. Since then, the WTP Project has made significant progress in establishing and implementing a strategy for resolving these issues. This strategy focuses on resuming full production work in a sequence that fully supports the DOE plan for a phased approach for starting treatment of the Hanford tank waste, beginning with the low-activity waste streams. Concurrent with the technical and programmatic issues, the DOE Office of River Protection has made numerous changes in the processes it uses to manage and oversee the WTP Project. These changes have had a beneficial impact on the progress the project has made in establishing a path forward for resuming production activities, and on planning for the necessary contract and baseline changes needed to complete the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress update on lower length scale research and development on U3Si2 fuel and FeCrAl cladding

This report summarizes the lower length scale model development and studies in regards to two accident tolerant (ATF) concepts, U 3 Si 2 and FeCrAl. U 3 Si 2 is proposed to replace UO 2 fuel for its high thermal conductivity and higher uranium density. FeCrAl alloys are proposed to replace Zr based cladding for their high mechanical strength and good corrosion resistance. Before applying them in reactors, sufficient data are needed to establish their predictable in-pile performance, but largely missing, and they are costly and time consuming to obtain by experimental approaches. Under the NEAMS ATF high-impact-problem (HIP), multiscale modeling and simulations are used to develop atomistic and mesoscale tools, obtain fundamental material properties, and assess the behaviors of these two ATF concepts. The accomplishments in FY17 are briefly introduced in this report including the development of interatomic potentials, assessment of swelling in U 3 Si 2 , and Cr precipitation in FeCrAl alloys.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PROACTIVE FA4: Progress Update 2024

The Priority Research Objectives for Arms Control Technology Innovation, Verification, and Evaluation (PROACTIVE) venture’s overall goal is to address the technical challenges that will “enable the negotiation and implementation of future nuclear arms limitation/reduction treaties with verification at the level of individual warheads by advancing the state of the art in verification and monitoring capabilities.” One of the four focus areas of the venture, Focus Area 4 (FA4), is a system-of-systems effort to establish methodologies for the integration of monitoring and verification (M&V) technologies into verification systems that support treaty objectives.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Progress Update on the In Situ Load Retention Aging Vessel

To improve upon our conventional thermally accelerated aging study methods which require periodic interruption of aging to perform load testing in an Instron machine, a new aging system is being developed to: (1) automate/facilitate data acquisition/analysis, (2) improve data quality, and (3) enable uninterrupted aging conditions (compression, temperature, atmosphere) which represents the service condition. In FY24, a thermal aging vessel instrumented with load cells was fabricated and tested. That unit demonstrated the primary function of the vessel: to continuously monitor the in situ load retention of up to three compressed polymer coupons undergoing thermally accelerated aging under nitrogen. A secondary objective, not realized in the unit due to inadequate sealing, was to enable a single initial nitrogen backfill (as opposed to a continuous purge) and gas sampling of the vessel headspace during thermal aging. Heating of the vessel was achieved using a custom heater jacket.

36 MATERIALS SCIENCE↗

Ball Aerospace AMSD Progress Update

The current status of the Advanced Mirror System Demonstrator program being performed by Ball Aerospace is presented. The hexagonal low-areal density Beryllium mirror blank has been fabricated and undergoing polishing at the time of this presentation.

Blair, Mark↗

Ares Projects Office Progress Update

NASA's Vision for Exploration requires a safe, reliable, affordable launch infrastructure capable of replacing the Space Shuttle for low Earth orbit transportation, as well as supporting the goal of returning humans to the moon. This presentation provides an overview of NASA's Constellation program and the Ares I and Ares V launch vehicles, including accomplishments and future work.

Vanhooser, Teresa↗

Progress Update: Brad Manuel

An employee of the Savannah River Site, Brad Manuel, discusses his job and the impact it has had on his career. Manuel discusses the opportunites the ARRA stimulis has given him and how it effected unemployment rates in his hometown.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update: H4 Basin Concrete Pour

The Recovery Act funded project in the H area basin. A concrete ditch built longer than half a mile to prevent contaminated water from expanding and to reduce the footprint on the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗