Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Feedback of the Dutch Historical Waste Management Program - 17085

This paper provides a feedback on the Dutch historical waste management program. Over the past decades, the High Flux Reactor located in Petten in the province of North Holland has tested numerous types of materials and fuels irradiation, for both medical and nuclear energy applications. A number of waste containers was accumulated on site, where the storage facility was initially built. Following Dutch political decisions in the 1980's, the contents of the waste storage facility in Petten must be transferred to another location. The consequences of this decision included the transportation of waste containers from Petten to the new location, which is located in the South-West of the Netherlands. This project was initiated and is now running. It includes a complex structure and can be described as follows: each historical-waste container will be opened, its contents segregated in three categories depending on the dose rate emission, characterized and repacked in new containers suitable for transportation and storage at the new site. The approach chosen is based on the final dose rate emitted by the repacked containers, which are sub-divided into 3 categories.. The lowest dose-emitting containers are transported directly to the new storage facility. The 2 other categories are first transported to a third party to be super compacted and subsequently transported to the new storage facility. So far, the segregation method is based on Co-60 gamma emission and nuclide vectors associated to the different materials. A pre-sorting has been established to fit as much as possible IAEA recommendations. Historical waste has then to be classified in families sharing common history. Thus, a set of canisters containing the pieces of the old reactor vessel, which was replaced in 1984 was the first challenge, followed by a set of canisters containing residues of instruments only and pieces coming from the top of the control rods of the reactor which were not directly irradiated in the reactor. So far, the two first sets of canisters are being treated and characterized as well as possible. Reporting and official documents have been filled up to comply to Dutch transport regulations and to define waste acceptance criteria for the storage facility. The first transports of containers with Low Level Waste occurred in October 2015, and another transport took place at the end of 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Materials Management Program at the NNSS

The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was established in 1951 mainly for weapons testing; because special nuclear materials (SNM) were expended during the tests, a nuclear material management program was not required. That changed in December 2004 with the receipt of Category I SNM for purposes other than weapons testing. At that time, Material Control and Accountability and Nuclear Material Management were a joint laboratory (Los Alamos and Lawrence Livermore) effort with nuclear material management being performed at the laboratories. That changed in March 2006 when the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office appointed sole responsibility to the Management and Operations (M&O) contractor, National Security Technologies, LLC (NSTec). Since 2006 the basic nuclear material management work was completed by a combination of M&O employees and subcontractors, but a true Nuclear Material Management (NMM) Program was not determined to be necessary until recently. With expanding missions and more nuclear material (NM) coming to the NNSS, it became imperative to have an organization to manage these materials; therefore, an NMM Manager was officially appointed by NSTec in 2012. In June 2011 a Gap Analysis and white paper was completed by a subcontractor; this presentation will include highlights from those documents along with our plans to resolve the “gaps” and stand up a functional and compliant NMM Program at the NNSS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium Management Program Plan - 17376

Technetium management is a high-priority activity for the U.S. Department of Energy (DOE) Office of Environmental Management (EM) complex. Waste management and remediation issues involving technetium represent environmental risks and challenges that are unique to DOE. This plan lays out the technology development activities that are underway as well as future technology needs to address technetium issues across DOE EM sites and across programmatic areas of tank waste, groundwater and soils, and facility decommissioning and deactivation in order to be comprehensive and to allow integration of similar activities. The program was developed in close coordination with site representatives and program offices. Activities and needs that were identified share common themes and were grouped into areas of characterization, treatment, and disposition. Characterization includes understanding the inventory at particular locations, the chemical species, and chemical and physical behavior, whether in a treatment process flowsheet or a geological setting that displays periodic contaminant releases. The tools for characterization in these different environments might use the same sensors or protocols. Treatment options include methods to capture technetium such as ion-exchange or manipulation of oxidation states, which also may be applied across program areas. Disposition includes end-points of the processes and environmental risk, including waste form behavior, mobility of technetium once it is treated or remediated, and long-term monitoring. Disposition represents integration of all cleanup actions at a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US Department of Energy Federal Energy Management Program Energy Treasure Hunt Toolkit

The US Department of Energy’s Federal Energy Management Program (FEMP) aims to assist federal agencies and their stakeholders with their energy-focused goals, opportunities, and barriers. The program offers various technical trainings and resources to its stakeholders. One of these resources is an energy treasure hunt program. This report presents the FEMP energy treasure hunt toolkit, a technical resource designed for systematic application for federal facilities seeking to optimize their energy and carbon usage. The toolkit was designed to help facilitate energy-focused kaizen events, identify energy-saving recommendations, analyze identified opportunities, and provide the tools needed to detect actionable projects to advance federal facilities. Through a collaboration with the Oak Ridge National Laboratory team that executed the industrial-focused Better Plants energy treasure hunt program, a similar treasure hunt toolkit was designed for FEMP. The purpose of this report is to provide an overview of the treasure hunt process and FEMP toolkit capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation and Demonstration of Reliability Target Allocation to Support Reliability and Integrity Management Program

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States (U.S.), nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the U.S., and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy (DOE) launched multiple programs to support advanced reactor deployment. The research described in this report explores implementation strategies for the Reliability and Integrity Management Program that directly supports the DOE goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the DOE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal management program for asbestos containing building materials to be available in the event of a disaster

Highlights: • The safe management of asbestos is a matter of considerable importance. • There is a lack of literature concerning the development of a program for ACBMs. •A management program for the optimal disposal of ACBMs has been developed. • This program is also available in the event of a post-disaster. - Abstract: The safe management and disposal of asbestos is a matter of considerable importance. A large number of studies have been undertaken to quantify the issue of waste management following a disaster. Nevertheless, there have been few (if any) studies concerning asbestos waste, covering the amount generated, the cost of disposal, and the degree of hazard incurred. Thus, the current study focuses on developing a program for the management of Asbestos Containing Building Materials (ACBMs), which form the source of asbestos waste in the event of a disaster. The study will also discuss a case study undertaken in a specific region in Korea in terms of: (1) the location of ACBM-containing buildings; (2) types and quantities of ACBMs; (3) the cost of ACBM disposal; (4) the amount of asbestos fiber present during normal times and during post-disaster periods; (5) the required order in which ACBM-containing buildings should be dismantled; and (6) additional greenhouse gases generated during ACBM removal. The case study will focus on a specific building, with an area of 35.34 m{sup 2}, and will analyze information concerning the abovementioned points. In addition, the case study will focus on a selected area (108 buildings) and the administrative district (21,063 buildings). The significance of the program can be established by the fact that it visibly transmits information concerning ACBM management. It is a highly promising program, with a widespread application for the safe management and optimal disposal of asbestos in terms of technology, policy, and methodology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reliability and Integrity Management Program Implementation Approach

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States, nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the United States, and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy launched multiple programs to support advanced reactor deployment. The research described in this paper explores implementation strategies for the Reliability and Integrity Management Program that directly supports the U.S. Department of Energy goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the U.S. Department of Energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The United States Federal Energy Management Program lighting energy efficiency 2017 update and impacts

Lighting consumes a great deal of electrical energy in buildings, and the U.S. federal government is the largest single energy consumer in the United States. Therefore, the way that the U.S. federal government manages its lighting energy use is of great importance. One important way that energy use is managed is through Federal Energy Management Program (FEMP) energy efficiency requirements. However, there is not much literature on how these requirements are set and how to value the resulting savings. This paper documents the methodology used to develop these for the 2017 FEMP lighting update. A methodology for calculating the total benefits is presented that goes beyond site energy saved, and includes full fuel cycle energy savings, energy cost savings, emissions offset and monetized emissions costs. The results show total benefits of $33 million USD including 475 kilotons of carbon dioxide (CO2) offset under the low compliance scenario, $104 million USD including 1494 kilotons of CO2 offset under the medium compliance scenario, and $217 million USD including 3124 kilotons of CO2 offset under the high compliance scenario.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

54 ENVIRONMENTAL SCIENCES↗