Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “probabilistic modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Bayesian probabilistic model for life prediction and fault mode classification of solid state luminaires

A new method has been developed for assessment of the onset of degradation in solid state luminaires to classify failure mechanisms by using metrics beyond lumen degradation that are currently used for identification of failure. Luminous Flux output, Correlated Color Temperature Data on Philips LED Lamps has been gathered under 85°C/85%RH till lamp failure. Failure modes of the test population of the lamps have been studied to understand the failure mechanisms in 85°C/85%RH accelerated test. Results indicate that the dominant failure mechanism is the discoloration of the LED encapsulant inside the lamps which is the likely cause for the luminous flux degradation and the color shift. The acquired data has been used in conjunction with Bayesian Probabilistic Models to identify luminaires with onset of degradation much prior to failure through identification of decision boundaries between lamps with accrued damage and lamps beyond the failure threshold in the feature space. In addition luminaires with different failure modes have been classified separately from healthy pristine luminaires. The α-λ plots have been used to evaluate the robustness of the proposed methodology. Results show that the predicted degradation for the lamps tracks the true degradation observed during 85°C/85%RH during accelerated life test fairly closely within the ±20% confidence bounds. Correlation of model prediction with experimental results indicates that the presented methodology allows the early identification of the onset of failure much prior to development of complete failure distributions and can be used for assessing the damage state of SSLs in fairly large deployments. It is expected that, the new prediction technique will allow the development of failure distributions without testing till L70 life for the manifestation of failure.

Bayesian probability↗

Effectiveness of denoising diffusion probabilistic models for fast and high-fidelity whole-event simulation in high-energy heavy-ion experiments

Artificial intelligence (AI) generative models, such as generative adversarial networks (GANs), variational autoencoders, and normalizing flows, have been widely used and studied as efficient alternatives for traditional scientific simulations. However, they have several drawbacks, including training instability and inability to cover the entire data distribution, especially for regions where data are rare. This is particularly challenging for whole-event, full-detector simulations in high-energy heavy-ion experiments, such as sPHENIX at the Relativistic Heavy Ion Collider and Large Hadron Collider experiments, where thousands of particles are produced per event and interact with the detector. This work investigates the effectiveness of denoising diffusion probabilistic models (DDPMs) as an AI-based generative surrogate model for the sPHENIX experiment that includes the heavy-ion event generation and response of the entire calorimeter stack. DDPM performance in sPHENIX simulation data is compared with a popular rival, GANs. Results show that both DDPMs and GANs can reproduce the data distribution where the examples are abundant (low-to-medium calorimeter energies). Nonetheless, DDPMs significantly outperform GANs, especially in high-energy regions where data are rare. Additionally, DDPMs exhibit superior stability compared to GANs. The results are consistent between both central and peripheral centrality heavy-ion collision events. Moreover, DDPMs offer a substantial speedup of approximately a factor of 100 compared to the traditional Geant4 simulation method.

42 ENGINEERING↗

Probabilistic model for fracture mechanics service life analysis

The service longevity of complex propulsion systems, such as the Space Shuttle Main Engine (SSME), can be at risk from several competing failure modes. Conventional life assessment practice focuses upon the most severely life-limited feature of a given component, even though there may be other, less severe, potential failure locations. Primary, secondary, tertiary failure modes, as well as their associated probabilities, must also be considered. Futhermore, these probabilities are functions of accumulated service time. Thus a component may not always succumb to the most severe, or even the most probable failure mode. Propulsion system longevity must be assessed by considering simultaneously the actions of, and interactions among, life-limiting influences. These include, but are not limited to, high frequency fatigue (HFF), low cycle fatigue (LCF), and subsequent crack propagation, thermal and acoustic loadings, and the influence of less-than-ideal nondestructive evaluation (NDE). An outline is provided for a probabilistic model for service life analysis, and the progress towards its implementation is reported.

Annis, Charles↗

Physics-Based Probabilistic Model of the Effects of Ionizing Radiation on Polymeric Insulators of Electric Cables used in Nuclear Power Plants

This report describes the results of a 3-year project aimed at developing a probabilistic predictive model of degradation of insulation of cables installed in nuclear power plants where heat and radiation are two major environmental stressors. The developed models have been developed based on exploring fundamental physical and chemical processes involved and validated by experimental data from open literature and data collected from experiments conducted as part of this study. The report comprises of two parts: Volume I and Volume II. In Volume I, degradation of three most widely-used insulation materials, cross-linked polyethylene (XLPE or PEX), ethylene propylene rubber (EPR), and silicone rubber (SIR) are discussed. Based on the identified degradation mechanisms and kinetics of the cable insulation, physics-based models have been proposed to quantitatively define and predict the degree of the degradation for functional failures of concern. Various sets of experimental data from the literature were used to help understand the phenomenon involved and to validate the models developed. Further validations were performed with data collected from experiments conducted as part of the research project. Methods and results of the experimental work are detailed in Volume II. These experimental results were found to be consistent with data reported in the literature and support the proposed models. The models developed here can probabilistically predict the lifetime of the cable insulation used in nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Language for Probabilistic Modeling of Scientific Data

We describe a portable container which allows specification of the probabilistic relations between several variables. The applications motivating this work are mainly scientific inference problems.

probabilistic modeling scientific data↗

Scaling Input Distributions for Probabilistic Models - 19472

It is important to address scaling issues when building models to support risk-based decisions for radioactive waste disposal sites. Currently, probabilistic risk assessment and probabilistic performance assessment models are run for multiple realizations where each realization uses one value from each input distribution over the entire modeled time. The input distributions represent the current state of knowledge in the mean of the input variable over the spatial region of interest and over the time period of the model run. This paper focuses on the time factor in input distribution scaling because it presents more serious conceptual and distributional challenges than the spatial factor. One of the challenges in temporal scaling is the effect of non-linearity on propagation of distribution uncertainty through to uncertainty in results. Radioactive waste disposal models tend to have both linear and non-linear components in their models. Dose assessment calculations are typically represented by linear models, while contaminant transport models have linear and non-linear components. In principle, temporal scaling of input parameter distributions for a linear model is straightforward, but scaling of input distributions for non-linear models is not. This paper uses examples to investigate the effects of input distribution temporal scaling on simple linear and non-linear models. Different scaling scenarios were investigated by comparing three analysis tools: analytical mathematical representations, statistical software programming, and GoldSim Monte Carlo simulation software. R statistical software is an open source statistical programming language often used for statistical analyses and graphical representation of data. GoldSim is a robust probabilistic dynamic modeling platform used in performance assessment modeling of radioactive waste sites. A simple linear model, a quadratic model and a multiplicative model were the cases explored for each of these tools. For the three analysis tools considered and with each of the scaling cases, 1,000 realizations were implemented from distributions of the random variables of interest. This is a sufficient number of realizations for simple models to capture the model space. An annual temporal resolution of a 100-year simulation period was chosen for all models and analysis tools. The effects of temporal scaling were demonstrated by investigating two different options for time scaling. Option 1 was set up so that the input distributions represented the expected value on an annual time scale, and a new value from that distribution was chosen every year (at every time step which equaled a year) for 100 years. In Option 2, the input distributions were scaled to represent the expected mean value of the input variable over the 100 years of simulation, and one value from that distribution was chosen for the entire elapsed time. Results show agreement across the three analysis tools. As expected, the linear models have identical results for the two different scaling Options, and the non-linear models diverge in the results for different time scale implementation. The implications of this work point to the need for careful consideration of input distribution temporal scaling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic modeling of solar power systems

The author presents a probabilistic approach based on Markov chain theory to model stand-alone photovoltaic power systems and predict their long-term service performance. The major advantage of this approach is that it allows designers and developers of these systems to analyze the system performance as well as the battery subsystem performance in the long run and determine the system design requirements that meet a specified service performance level. The methodology presented is illustrated by using data for a radio repeater system for the Boston, Massachusetts, location.

Safie, Fayssal M.↗

A probabilistic model of a porous heat exchanger

This paper presents a probabilistic one-dimensional finite element model for heat transfer processes in porous heat exchangers. The Galerkin approach is used to develop the finite element matrices. Some of the submatrices are asymmetric due to the presence of the flow term. The Neumann expansion is used to write the temperature distribution as a series of random variables, and the expectation operator is applied to obtain the mean and deviation statistics. To demonstrate the feasibility of the formulation, a one-dimensional model of heat transfer phenomenon in superfluid flow through a porous media is considered. Results of this formulation agree well with the Monte-Carlo simulations and the analytical solutions. Although the numerical experiments are confined to parametric random variables, a formulation is presented to account for the random spatial variations.

Agrawal, O. P.↗

WE-H-BRC-06: A Unified Machine-Learning Based Probabilistic Model for Automated Anomaly Detection in the Treatment Plan Data

Purpose: The purpose of this work was to investigate the ability of a machine-learning based probabilistic approach to detect radiotherapy treatment plan anomalies given initial disease classes information. Methods In total we obtained 1112 unique treatment plans with five plan parameters and disease information from a Mosaiq treatment management system database for use in the study. The plan parameters include prescription dose, fractions, fields, modality and techniques. The disease information includes disease site, and T, M and N disease stages. A Bayesian network method was employed to model the probabilistic relationships between tumor disease information, plan parameters and an anomaly flag. A Bayesian learning method with Dirichlet prior was useed to learn the joint probabilities between dependent variables in error-free plan data and data with artificially induced anomalies. In the study, we randomly sampled data with anomaly in a specified anomaly space.We tested the approach with three groups of plan anomalies – improper concurrence of values of all five plan parameters and values of any two out of five parameters, and all single plan parameter value anomalies. Totally, 16 types of plan anomalies were covered by the study. For each type, we trained an individual Bayesian network. Results: We found that the true positive rate (recall) and positive predictive value (precision) to detect concurrence anomalies of five plan parameters in new patient cases were 94.45±0.26% and 93.76±0.39% respectively. To detect other 15 types of plan anomalies, the average recall and precision were 93.61±2.57% and 93.78±3.54% respectively. The computation time to detect the plan anomaly of each type in a new plan is ∼0.08 seconds. Conclusion: The proposed method for treatment plan anomaly detection was found effective in the initial tests. The results suggest that this type of models could be applied to develop plan anomaly detection tools to assist manual and automated plan checks. The senior author received research grants from ViewRay Inc. and Varian Medical System.

60 APPLIED LIFE SCIENCES↗

Probabilistic Models of the Conservation and Balance Laws in Switching Regimes

A probabilistic representation is constructed for classical solution to the Cauchy problem for system of semilinear parabolic equations such that the second order terms with different coefficients enter in diagonal way, while the lower order terms enter in nondiagonal way. The systems of this kind arise as mathematical models of the parabolic conservation and balance laws and as mathematical models of dynamical systems with switching regimes.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Modeling of Settlement Risk at Land Disposal Facilities - 12304

The long-term reliability of land disposal facility final cover systems - and therefore the overall waste containment - depends on the distortions imposed on these systems by differential settlement/subsidence. The evaluation of differential settlement is challenging because of the heterogeneity of the waste mass (caused by inconsistent compaction, void space distribution, debris-soil mix ratio, waste material stiffness, time-dependent primary compression of the fine-grained soil matrix, long-term creep settlement of the soil matrix and the debris, etc.) at most land disposal facilities. Deterministic approaches to long-term final cover settlement prediction are not able to capture the spatial variability in the waste mass and sub-grade properties which control differential settlement. An alternative, probabilistic solution is to use random fields to model the waste and sub-grade properties. The modeling effort informs the design, construction, operation, and maintenance of land disposal facilities. A probabilistic method to establish design criteria for waste placement and compaction is introduced using the model. Random fields are ideally suited to problems of differential settlement modeling of highly heterogeneous foundations, such as waste. Random fields model the seemingly random spatial distribution of a design parameter, such as compressibility. When used for design, the use of these models prompts the need for probabilistic design criteria. It also allows for a statistical approach to waste placement acceptance criteria. An example design evaluation was performed, illustrating the use of the probabilistic differential settlement simulation methodology to assemble a design guidance chart. The purpose of this design evaluation is to enable the designer to select optimal initial combinations of design slopes and quality control acceptance criteria that yield an acceptable proportion of post-settlement slopes meeting some design minimum. For this specific example, relative density, which can be determined through field measurements, was selected as the field quality control parameter for waste placement. This technique can be extended to include a rigorous performance-based methodology using other parameters (void space criteria, debris-soil mix ratio, pre-loading, etc.). As shown in this example, each parameter range, or sets of parameter ranges can be selected such that they can result in an acceptable, long-term differential settlement according to the probabilistic model. The methodology can also be used to re-evaluate the long-term differential settlement behavior at closed land disposal facilities to identify, if any, problematic facilities so that remedial action (e.g., reinforcement of upper and intermediate waste layers) can be implemented. Considering the inherent spatial variability in waste and earth materials and the need for engineers to apply sound quantitative practices to engineering analysis, it is important to apply the available probabilistic techniques to problems of differential settlement. One such method to implement probability-based differential settlement analyses for the design of landfill final covers has been presented. The design evaluation technique presented is one tool to bridge the gap from deterministic practice to probabilistic practice. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sequential Inference of Hospitalization Electronic Health Records Using Probabilistic Models

In the dynamic hospital setting, decision support can be a valuable tool for improving patient outcomes. Data-driven inference of future outcomes is challenging in this dynamic setting, where long sequences such as laboratory tests and medications are updated frequently. This is due in part to heterogeneity of data types and mixed-sequence types contained in variable length sequences. In this work we design a probabilistic unsupervised model for multiple arbitrary-length sequences contained in hospitalization Electronic Health Record (EHR) data. The model uses a latent variable structure and captures complex relationships between medications, diagnoses, laboratory tests, neurological assessments, and medications. It can be trained on original data, without requiring any lossy transformations or time binning. Inference algorithms are derived that use partial data to infer properties of the complete sequences, including their length and presence of specific values. We train this model on data from subjects receiving medical care in the Kaiser Permanente Northern California integrated healthcare delivery system. The results are evaluated against held-out data for predicting the length of sequences and presence of Intensive Care Unit (ICU) in hospitalization bed sequences. Our method outperforms a baseline approach, showing that in these experiments the trained model captures information in the sequences that is informative of their future values.

97 MATHEMATICS AND COMPUTING↗

LADTAP-PROB: A PROBABILISTIC MODEL TO ASSESS RADIOLOGICAL CONSEQUENCES FROM LIQUID RADIOACTIVE RELEASES

The potential radiological consequences to humans resulting from aqueous releases at the Savannah River Site (SRS) have usually been assessed using the computer code LADTAP or deterministic variations of this code. The advancement of LADTAP over the years included LADTAP II (a computer program that still resides on the mainframe at SRS) [1], LADTAP XL{copyright} (Microsoft Excel{reg_sign} Spreadsheet) [2], and other versions specific to SRS areas such as [3]. The spreadsheet variations of LADTAP contain two worksheets: LADTAP and IRRIDOSE. The LADTAP worksheet estimates dose for environmental pathways including ingestion of water and fish and external exposure resulting from recreational activities. IRRIDOSE estimates potential dose to individuals from irrigation of food crops with contaminated water. A new version of this deterministic methodology, LADTAP-PROB, was developed at Savannah River National Laboratory (SRNL) to (1) consider the complete range of the model parameter values (not just maximum or mean values), (2) determine the influences of parameter uncertainties within the LADTAP methodology, to perform a sensitivity analysis of all model parameters (to identify the input parameters to which model results are most sensitive), and (3) probabilistically assess radiological consequences from contaminated water. This study presents the methodology applied in LADTAP-PROB.

61 RADIATION PROTECTION AND DOSIMETRY↗

Probabilistic modeling of the indoor climates of residential buildings using EnergyPlus

The indoor air temperature and relative humidity in residential buildings significantly affect material moisture durability, HVAC system performance, and occupant comfort. Therefore, indoor climate data is generally required to define boundary conditions in numerical models that evaluate envelope durability and equipment performance. However, indoor climate data obtained from field studies is influenced by weather, occupant behavior and internal loads, and is generally unrepresentative of the residential building stock. Likewise, whole-building simulation models typically neglect stochastic variables and yield deterministic results that are applicable to only a single home in a specific climate. The

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y Zhu↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y. Zhu↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗