Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “preventive maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Modeling of Vertical Motor-driven Pump for Simulation of a Fault Signature \\ for Condition Monitoring

As part of the ongoing effort to transition from preventive maintenance strategies to condition-based maintenance strategies in nuclear power plants, there is significant reliance on using machine learning techniques. To develop a robust machine learning model that can diagnose all the fault modes of a vertical motor-driven pump, data capturing the unique signature of each fault mode is required. In practice, it is difficult to collect or capture data that captures all the fault modes from a single plant site. So to address this situation, a computational model of a vertical motor-driven pump is developed using the multipurpose finite element software COMSOL Multiphysics. The developed model is used to generate simulated data under normal operation and is compared with the vibration data collected using vibration sensors. Once the simulation model is verified under normal operating condition, simulated data for the fault mode for which minimal or no evidence is available in historical plant process data is developed. This simulated data is used to develop fault signatures to achieve robust predictive models. This paper presents modeling details and verification of the model that can used to generate data for fault modes that are not available at a plant site for condition monitoring purpose.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Adaptive Framework for Maintenance Scheduling Based on Dynamic Preventive Intervals and Remaining Useful Life Estimation

Data-based prognostic methods exploit sensor data to forecast the remaining useful life (RUL) of industrial settings to optimize the scheduling of maintenance actions. However, implementing sensors may not be cost-effective or practical for all components. Traditional preventive approaches are not based on sensor data; however, they schedule maintenance at equally spaced intervals, which is not a cost-effective approach since the distribution of the time between failures changes with the degradation state of other parts or changes in working conditions. This study introduces a novel framework comprising two maintenance scheduling strategies. In the absence of sensor data, we propose a novel dynamic preventive policy that adjusts intervention intervals based on the most recent failure data. When sensor data are available, a method for RUL prediction, designated k-LSTM-GFT, is enhanced to dynamically account for RUL prediction uncertainty. The results demonstrate that dynamic preventive maintenance can yield cost reductions of up to 51.8% compared to conventional approaches. The predictive approach optimizes the exploitation of RUL, achieving costs that are only 3–5% higher than the minimum cost achievable while ensuring the safety of critical systems since all of the failures are avoided.

Nunes, Pedro (ORCID:0000000180012172)↗

OPTOM: Optimization of Parabolic Trough - Operations & Maintenance

The US Department of Energy’s SunShot goals look to reduce the cost of Concentrating Solar Power (CSP) technology to 5¢/kWh for baseload plants. This is about a 50% reduction from current costs. To achieve this cost target, a significant reduction in operation and maintenance (O&M) costs of 40 to 50% is likely needed. Advances are needed in the O&M practices of CSP plants if the technology is to achieve the SunShot cost goals. Digitization of plant performance and O&M data has become a new best practice in the world of renewable energy asset management. Owners and operators of large photovoltaic and wind power plants are working to digitize performance and O&M data at their existing assets, to improve their management of the facilities, to increase performance, reduce O&M costs, and lower the overall life cycle cost of ownership. CSP power plants are behind the curve of other technologies on the digitization of plant information to aid in the plant asset management. This project directly addresses the objective of digitizing the O&M data of the solar field, focusing on three areas: 1) creating a framework for sharing data and information, 2) creating a system for monitoring and managing the maintenance of the solar field collectors, and 3) developing analytic tools to identify issues in the solar field. According to the NREL CSP Best Practices Study, the current practice at many CSP plants is to rely on paper lists, spreadsheets, and email for monitoring and managing problems and maintenance in the solar field. The key element to digitize solar field O&M is the creation of a centralized data archive that all users and systems can interface with. This project developed a centralized relational database framework that allows users and applications to access and share data. Conventional power plants utilize Computerized Maintenance Management Systems (CMMSs) to track the corrective, preventive (scheduled), and predictive maintenance of equipment and subsystems in the power plant. CSP plants use these systems in the power block, but while these systems specialize at tracking maintenance on up to thousands of pieces of equipment, they are not well suited for tracking the tens or hundreds of thousands of components in large commercial CSP or photovoltaic solar fields. In this project we developed a new software application referred to as FieldStatus (TM). This is a specialized database program that is used to track the status of each collector and its components. This application is designed to complement the existing CMMS to enable improved tracking and management of maintenance activities in the solar field. One of the major maintenance tasks for solar fields is maintaining the cleanliness of the mirrors. Although seemingly a relatively straight forward task, it has often proven challenging to maintain high levels of cleanliness in an efficient and cost-effective manner. This project developed new tools and metrics for monitoring and optimizing solar field cleaning resources and overall solar field cleanliness.

14 SOLAR ENERGY↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants: 2nd Annual Report

For economic reasons, the nuclear industry is witnessing premature closure of nuclear power plants, despite excellent safety records. Operations and Maintenance (O&M) activities are some of the largest costs in operating legacy light-water plants. By reducing O&M costs, nuclear energy can become more economically competitive with other energy sources. This can be achieved by leveraging machine-learning and artificial intelligence technologies to develop data-driven algorithms to better diagnose potential faults within the system. Improved accuracy of the models can lead to a reduction in unnecessary maintenance, thus reducing costs associated with parts, labor, and unnecessary planned, forced, or extended outages. To address these challenges, the goal of this project is to perform research and development in the area of digital monitoring, i.e., the application of advanced sensor technologies (particularly wireless sensor technologies) and data science based analytic capabilities, to advance online monitoring and predictive maintenance in nuclear plants and improve plant performance (efficiency gain and economic competitiveness). This report summarizes the fiscal year 2020 research progress encompassing (1) different wireless vibration sensor and data indicators used to assess the health of a plant asset; (2) development of diagnostic models for fault detection; and (3) development of prognostic models for estimating the health of the system up to 7 days ahead.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PMDT: AI-Enabled Predictive Maintenance Digital Twins for Advanced Nuclear Reactors

Our team made substantial technical progress on various fronts during the course of the program. Multiple milestones were geared towards demonstrating the feasibility of machine learning based predictive maintenance digital twins towards reducing O&M costs, whereas some other milestones actually focused on identifying technical gaps and developing technologies such as humble AI to provide necessary robustness to the ML-based models. We were able to demonstrate in many cases that Machine learning-based methods can be successfully adapted for Nuclear plant environments especially for remote monitoring applications. Detailed analyses were carried out with plant and full scope simulation data along with capabilities of enhanced analytics to assess and set realistic expectations on cost reductions in O&M. These assessments are paving the way for investments towards reactor design improvements as well project planning for SMR projects as they develop and mature in the next few years. Technology developed under this program got direct visibility to GE Hitachi and their utility customers and resulted in positive intents to deploy some of the elements from design phase. The project additionally resulted in several reports, publications, software and data generation that will be useful in deployment and O&M services for BWRX300 fleets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Anomaly Detection in Seismic Data with Deep Learning: Application for Instrument Failure Detection and Forecasting

Seismic data quality assessment (QA) is the first and one of the most important steps before conducting any further data analysis. Traditional methods involve checking various metrics, such as spike detection and power spectral density, by setting strict thresholds or comparing data against synthetic benchmarks. However, these approaches often rely on pre-existing knowledge and assumptions about data anomalies, leading to potential misclassification of unusual cases. Here, in this study, we propose a deep autoencoder model, an unsupervised learning approach that evaluates data quality without making assumptions about normal and anomalous data, which can be used to identify deviations in recorded data that may indicate nascent instrument failure. We test the model with the U.S. International Monitoring System (IMS) seismic stations and demonstrate the capability of detecting anomalies on a monthly scale. This could prompt station operators to examine potential problems early, allowing sufficient time for instrument maintenance to prevent data outages. In addition, we use a new manually selected testing dataset to compare our model performance against two supervised machine learning (ML) approaches and a standard QA package, as baseline models. When applied to the dataset containing known data anomalies, performance of the supervised and unsupervised ML approaches is similar, with an accuracy of 88.1% for our model compared to ∼90% for the supervised ML approach and 78.2% for the standard QA package. Our model outperforms the baseline models when applied to new stations, where new types of data anomalies can be station-specific and not included in the training dataset. Finally, we show model transferability by training the model with data from the Global Seismograph Network only and applying it to the IMS network data. The results suggest that our model is generalizable and can be applied to new stations with good accuracy.

Lin, Jiun-Ting [Lawrence Livermore National Labora↗

Field Experience Detecting PV Underperformance in Real Time Using Existing Instrumentation

Maintenance at large-scale photovoltaic plants employs a mix of preventative and corrective maintenance practices. Large outages, such as an inverter tripping offline, are often easy to detect. More subtle sub-inverter faults and failures can accumulate and go unnoticed for months or years. A software-based fault detection method has been developed to analyze commonly measured data from large-scale PV plants for more timely detection of subtle underperformance. The method has been demonstrated on eight datasets from large-scale plants with high accuracy of detection. Results are validated using aerial infrared scanning. String outages are detected with a true positive rate of 73 percent and tracker issues are detected with a true positive rate of 88 percent. The developed method can be uniformly applied to photovoltaic plants across a range of scales and configurations to assess performance, quickly detect underperformance, and determine the source and location of failures. The results inform and improve operations and maintenance at PV plants, ultimately aiding in improved affordability, reliability, availability, and resiliency of solar electricity.

14 SOLAR ENERGY↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind Turbine Gearbox Failure Detection Through Cumulative Sum of Multivariate Time Series Data

The wind energy industry is continuously improving their operational and maintenance practice for reducing the levelized costs of energy. Anticipating failures in wind turbines enables early warnings and timely intervention, so that the costly corrective maintenance can be prevented to the largest extent possible. It also avoids production loss owing to prolonged unavailability. One critical element allowing early warning is the ability to accumulate small-magnitude symptoms resulting from the gradual degradation of wind turbine systems. Inspired by the cumulative sum control chart method, this study reports the development of a wind turbine failure detection method with such early warning capability. Specifically, the following key questions are addressed: what fault signals to accumulate, how long to accumulate, what offset to use, and how to set the alarm-triggering control limit. We apply the proposed approach to 2 years’ worth of Supervisory Control and Data Acquisition data recorded from five wind turbines. We focus our analysis on gearbox failure detection, in which the proposed approach demonstrates its ability to anticipate failure events with a good lead time.

17 WIND ENERGY↗

Connector Reliability Across the U.S. Solar Sector

This presentation describes preventative and corrective maintenance costs associated with PV connectors, downtime resulting from failed connectors, and impact of connectors on LCOE. The presentation described the NREL portion of a project also involving portions by Sandia NL and EPRI which will be presented separately.

connector↗

Advancing Asset Management in Water Infrastructure Systems

Aging water system infrastructure, including drinking water, wastewater, and stormwater, poses a growing challenge for utilities and municipalities. These water systems have well documented challenges with respect to their age, condition, and level of service. ASCE annual report cards consistently rate these infrastructure systems in the United States as underfunded, overcapacity, or past service life (ASCE 2025 Report Card). For example, Chini and Stillwell (2017) estimated that the mean water loss in drinking water systems, i.e., non-revenue water, is approximately 16% across the United States. These concerns are not just relegated to the United States, with Courtenay, British Columbia, identifying 17% of their water main pipes as in a ‘poor’ condition state, defined as a category condition 5 out of 5 (City of Courtenay, 2024). These cases illustrate the challenges utilities are facing to manage extensive networks of infrastructure to deliver a consistent and high level of service. For buried infrastructure such as water systems, studies suggest that preventative interventions can lead to lower maintenance costs and fewer service disruptions (Mazumder et al, 2018; Li et al, 2014). The demonstrated need and benefit of appropriately applied asset management is juxtaposed against the relatively sparse literature that evaluates water systems within an asset management construct. Since 2020, just 37 papers specifically reference asset management in the Journal of Water Resources Planning and Management. Of those, only a few specifically look to develop strategies for improved asset management. Therefore, we highlight four key research areas that represent opportunities for advancement of asset management research for water systems. First, advances in condition assessment and forecasting are needed to better estimate asset deterioration using diverse datasets. Second, machine learning (ML) and artificial intelligence (AI) hold promise for predictive maintenance and investment prioritization, though questions of generalizability and model transparency remain. Third, applying a value of information framework can guide utilities in making cost-effective sensor deployment and data collection decisions, to direct monitoring strategies towards data-informed asset management decisions. Finally, integrated infrastructure management is critical, requiring coordinated planning with other infrastructure systems and stakeholder engagement to reduce costs and enhance service delivery.

Chini, Christopher M.↗

Economic Analysis of Condition-Monitoring-Based Predictive Maintenance in Power Plants under Market Elasticity

Condition-monitoring-based predictive maintenance can increase the power plant availability by preventing forced outages. However, the actual on-stream time depends on market elasticity and dynamics, which are affected by cost and penetration of other power generation technologies. This paper develops a systematic approach for the economic analysis of investment in condition monitoring technologies with due consideration of market elasticity. Focus is on corrosion monitoring in coal-fired power plants (CFFPs) since corrosion in high-temperature coal-fired boilers is a leading cause of equipment failure. Investment in sensor networks for measuring corrosion and operating conditions like metal temperature and concentrations of O 2 and SO 2 is investigated. The unscented Kalman filter is used to estimate corrosion in the waterwall section of the boiler under multiple sensor networks. Electricity produced by CFPPs in the future in the U.S. due to changes in availability under market elasticity is studied. Sensitivity of the incremental net present value to factors like the number, type, and cost of sensors is analyzed.

Electrochemistry↗

Conceptual design of the LHCD system on CFETR

With the capability of saving flux consumption in the current ramp up phase, controlling the safety factor (q) profile, providing the required off-axis current drive (CD), a lower hybrid current drive (LHCD) system was eventually determined to be used on the China Fusion Engineering Test Reactor (CFETR). Here, in this paper, a 20 MW/4.6 GHz system composed of 40 units of 500 kW continuous wave (CW) klystron amplifier is preliminarily designed. The feasibility of the frequency choice of 4.6 GHz in the physical aspect is discussed. In order to minimize the transmission loss, a TE01 over-mode of circular waveguide will be used in the transmission system. Although previous calculations indicates that high field side (HFS) launcher location results in waves damping at inner region than low field side (LFS) launcher, which is favorable for plasma stability, HFS launcher will be extremely difficult in engineering due to the limited space. Calculations show that the tritium breeding ratio (TBR) will be decreased by ~ 1.5% with HFS launcher, while it will be decreased by ~ 0.22% only with LFS launcher. As a result, the LH power will be coupled to plasma from the top port at LFS. The designed passive active multi-junction (PAM) launcher is arranged in an array of 5 rows and 8 columns with the height of 1181 mm and the width of 794 mm. A shielding block with a thickness of 20 cm will be equipped around the feeding waveguides to protect the feeding waveguides and to prevent neutron leakage. A preliminary scheme of the remote maintenance for the LFS launcher is given. The modeling results shows that the density for optimum coupling is ~ 1.8 × 10 17 /m 3 , lower than the 4.6 GHz cut-off density n e_co = 2.6 × 10 17 /m 3 . Around this density, the power directivity (D p ) can be high as 71%.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

AI-Enabled Robotic NDE for Structural Damage Assessment and Repair

The aim of this paper is to develop the concept and a prototype of an intelligent mobile robotic platform that is integrated with nondestructive evaluation (NDE) capabilities for autonomous live inspection and repair. In many industrial environments, such as the application of power plant boiler inspection, human inspectors often have to perform hazardous and challenging tasks. There is a significant chance of injury, considering the confined spaces and limited visibility of the inspection environment and hazards such as pressurization and improper water levels. In order to provide a solution to eliminate these dangers, the concept of a new robotic system was developed and prototyped that is capable of autonomously sweeping the region to be inspected. The robot design contains systematic integration of components from robotics, NDE, and artificial intelligence (AI). A magnetic track system is used to navigate over the vertical steel structures required for examination. While moving across the inspection area, the robot uses an NDE sensor to acquire data for inspection and repair. This paper presents a design of a portable NDE scanning system based on eddy current array probes, which can be customized and installed on various mobile robot platforms. Machine learning methods are applied for semantic segmentation that will simultaneously localize and recognize defects without the need of human intervention. Experiments were conducted that show the NDE and repair capabilities of the system. Improvements in human safety and structural damage prevention, as well as lowering the overall costs of maintenance, are possible through the implementation of this robotic NDE system.

Materials Science↗

INL POSTER 2025- KRYSTAL FOSTER

The Advanced Test Reactor (ATR) employs the N-16 system to measure reactor power by detecting beta particles emitted from nitrogen-16 isotopes. During startup, the N-16 pumps cause rapid oscillations in the discharge piping due to pressure transients, which cease when the valve supplying N-16 flow to the reactor is opened. To address this, a soft-starter is proposed to gradually increase the motor voltage, reducing mechanical stress and preventing pressure surges. This solution enhances system stability, lowers maintenance costs, extends equipment lifespan, and is more cost-effective than Variable Frequency Drives (VFDs), making it ideal for the infrequently activated N-16 pumps.

42 - ENGINEERING↗

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗