Storing Co 2 in Built Infrastructure: Co 2 Carbonation of Precast Concrete Products

The overall objective of the proposed study was to advance the technical understanding of CO 2 incorporation into novel cementitious materials for the development of high value products that provide a net reduction in carbon emissions. This project combined two primary phases of research that addressed technical barriers related to (i) optimizing CO 2 storage capability of cementitious materials, (ii) evaluating and enhancing physical properties of novel carbonated materials, and (iii) assessing the reductions in life cycle CO 2 emissions attributed to CO 2 carbonation of precast cementitious materials. Engineered cementitious composites (ECC) are a class of highly ductile concrete composites that have been shown to be very durable when used in the built environment. CO 2 carbonation of ECC was examined in this study and it was found that precast ECC specimens could sequester up to 35% CO 2 by cement mass after 24 hours of curing at a CO 2 pressure of 0.5 MPa and 23°C and had a strain capacity of 3%. Carbonation conditions were optimized at the bench-scale and then utilized to create full-scale CO 2 -cured ECC railroad ties that were field tested on a train track. Rail ties were selected for this initial assessment of CO 2 storage in precast concrete materials due to the large market for concrete ties in the railroad industry. Although the full-scale rail ties passed all of the required American Railway Engineering and Maintenance-of-Way Association qualifying mechanical tests, on-track testing of the CO 2 -cured ECC rail ties was unsuccessful due to fiber alignment in the ECC the during the rail tie casting process which prevented the material from achieving the expected level of strain capacity. This result highlights the challenge in scaling up bench-scale processes to full-scale product manufacturing and requires additional investigation into the casting process of large-scale infrastructure elements using ECC combined with carbonation curing. Life cycle assessment of a CO 2 -cured ECC rail tie versus a traditional concrete rail tie indicates that the ECC tie can have lifecycle carbon savings of between 11% and 51% depending on how much longer its useful lifetime is compared to traditional concrete rail ties. Both carbon and cost savings are driven by a reduction in the need to replace broken rail ties, so the key factor is the extent to which a CO 2 -cured ECC rail tie will have increased lifetime durability compared to alternative rail ties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continuous Monitoring and Partial Water Softening for Cooling Tower Water Treatment

Cooling towers are an integral component of many refrigeration systems, providing comfort or process cooling across a broad range of applications. They are the point in the system where heat is dissipated to the atmosphere through the evaporative cooling process. Cooling towers are commonly found in industrial applications and are also often used in water-cooled chilled water plants in medium to large commercial buildings. Continuous monitoring and partial water softening for cooling towers used in medium to large commercial buildings are the focus of this paper. Cooling towers consume large amounts of water. Cooling tower-related water consumption is one of largest potable water loads within buildings in the United States, with substantial building water use associated with heating and cooling. Regional water shortages have highlighted a need to reduce water consumption; the U.S. General Services Administration (GSA) and Executive Order 13834 place priority on reducing water consumption. This priority has fueled interest in the identification, investigation, and potential broad deployment of cost-effective opportunities to reduce water use, such as alternative water treatment (AWT) technologies for cooling towers. Traditional water treatment approaches use chemicals to extend the ability of the water to hold scaling minerals in suspension, minimize corrosion, and prevent biological growth. This treatment protects the chillers and cooling tower equipment; however, even when chemicals are used regularly, a certain percentage of condenser water must be drained and made up with fresh water to maintain system water quality parameters. In addition, the use of chemicals sometimes creates a waste disposal issue and can cause building owners to incur additional fees, such as disposal or wastewater charges. To manage cooling tower water treatment, GSA typically contracts with a company specializing in conventional chemical maintenance for a fixed fee. While there are many types and vendors of AWT systems, this project assesses the effectiveness of one technology provided by Aqualogix. This system is a chilled water plant monitoring and control system aimed at optimizing system performance by reducing the blowdown occurrences used to remove mineral build-up. The technology consists of two components – continuous programmable logic control (PLC) monitoring and side-stream filtration with partial water softening. PLC monitoring calculates cycles of concentration (CoC) and determines the optimum amount of blowdown water required to satisfy all water chemistry requirements. Side-stream filtration removes suspended matter and improves biocide efficacy while precisely dispensing softened water to achieve optimal makeup water hardness. Unlike other AWT systems evaluated by GSA to date, this system does not replace the legacy treatment system but is used in addition to chemical water treatment. The vendor claims their technology will reduce water consumption, water discharge, and maintenance costs. The AWT system evaluated in this demonstration is a commercialized technology. Given its commercialized state, the system evaluated in this report is at a Technology Readiness Level 9 according to National Aeronautics and Space Administration (NASA) definitions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A Self-Sustained CPS Design for Reliable Wildfire Monitoring

Continuous monitoring of areas nearby the electric grid is critical for preventing and early detection of devastating wildfires. Existing wildfire monitoring systems are intermittent and oblivious to local ambient risk factors, resulting in poor wildfire awareness. Ambient sensor suites deployed near the gridlines can increase the monitoring granularity and detection accuracy. However, these sensors must address two challenging and competing objectives at the same time. First, they must remain powered for years without manual maintenance due to their remote locations. Second, they must provide and transmit reliable information if and when a wildfire starts. The first objective requires aggressive energy savings and ambient energy harvesting, while the second requires continuous operation of a range of sensors. To the best of our knowledge, this paper presents the first self-sustained cyber-physical system that dynamically co-optimizes the wildfire detection accuracy and active time of sensors. The proposed approach employs reinforcement learning to train a policy that controls the sensor operations as a function of the environment (i.e., current sensor readings), harvested energy, and battery level. Here, the proposed cyber-physical system is evaluated extensively using real-life temperature, wind, and solar energy harvesting datasets and an open-source wildfire simulator. In long-term (5 years) evaluations, the proposed framework achieves 89% uptime, which is 46% higher than a carefully tuned heuristic approach. At the same time, it averages a 2-minute initial response time, which is at least 2.5× faster than the same heuristic approach. Furthermore, the policy network consumes 0.6 mJ per day on the TI CC2652R microcontroller using TensorFlow Lite for Micro, which is negligible compared to the daily sensor suite energy consumption.

54 ENVIRONMENTAL SCIENCES↗

High-burnup boiling water reactor steady-state operating conditions and fuel performance analysis

The primary operational costs for existing nuclear reactors are plant operation costs, maintenance costs, and fuel costs, all of which are influenced by the materials used and the design of the reactor core. Optimizing core design parameters—including burnup limits and enrichment levels—can lengthen cycles, reduce outages, reduce reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. Furthermore, developing higher-fidelity tools to simulate these parameters enables better identification of the available margin, improves overall plant safety, and improves the understanding a given plant’s responses to accident scenarios. Here, in the US, much of the research and development focus has traditionally been on pressurized water reactors (PWRs), but boiling water reactors (BWRs) comprise approximately one-third of the US reactor fleet. Modeling and simulation advances for BWRs and PWRs—particularly those achieved through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program—are crucial to the long-term viability of the light–water reactor industry. A key research area of the high burnup and increased enriched fuel initiative is focused on addressing issues related to postulated loss-of-coolant accident (LOCA) scenarios. NEAMS has dedicated significant effort to enhancing tools to better support BWRs. A current focus is showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity steady-state analysis is a first step toward demonstrating a best-estimate, pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior for a representative BWR. The objective of this effort is to provide a modeling capability that will help elucidate and provide a best-estimate evaluation for cladding rupture susceptibility in BWRs. This modeling capability could then be used to prevent and/or mitigate cladding ruptures in postulated accident scenarios without penalizing operational parameters. Additionally, the results of this work will help identify strategies for finding additional margins or potentially limiting cladding ruptures through core design optimizations to enable more efficient core designs.

Capps, Nathan [Oak Ridge National Laboratory (ORNL↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

ELM 1016706669-AA B581 GDE01 Generator Summary pg 4-5 only

The table below shows the general load breakdown for 581GDE01. Although the total connected load exceeds the generator’s 150kW nameplate capacity, the normal configured load during standby power mode is less, which was measured at 81kW, or 54%, during preventive maintenance activities on 12/12/24. The generator’s available spare capacity must account for dynamically changing loads that can increase the total power demand at any time. If the two online VFD’s are operated at full speed the actual standby mode load is estimated to increase by 38kW, which would bring the total configured load during standby power mode to 119kW, or 79%, still within 581GDE01’s acceptable capacity. Per the LLNL Site 200 Generator Consolidation Final Study 2022, “Standby Emergency Generator nameplate ratings are based upon operation with varying load averaging 70% of the nameplate for 200 hours per year. Continuous loading between 70% and 100% will reduce a generator’s expected lifetime before a major overhaul. This is never a problem with Laboratory machines because of conservative application of generators and the reliability of the normal power system combines to keeps the load and hours down”. To achieve optimal performance and prolong generator life, the recommended generator loading is between 40% and 70%, optimally at 70%, which 581GDE01 appropriately falls within.

42 ENGINEERING↗

Advanced Anti-Fouling Coatings to Improve the Efficiency of Coal Power Plants

As the total cost of carbon to generate energy has become a global concern, operators are increasingly looking at all parts of the generation cycle to find areas where efficiency gains may be found. It has been long identified that fouling of heat exchangers is a persistent cause of up to 2.5% of global CO 2 emissions. Unfortunately, practice has also demonstrated that unless a powerful economic driver exists to encourage preemptive mitigation of fouling, there will always be a strong tendency for operators to minimize any form of intervention due to high costs and challenges in scheduling downtime. The objective of this proposed research effort was to demonstrate how existing power plants could lower their carbon emissions and significantly improve heat transfer efficiency using new surface treatment materials to control fouling in a variety of heat exchange equipment. The surface treatment material which was optimized and deployed in this effort is now known commercially as HeatX. It is a low-surface energy, water- and oil-repellent, abrasion resistant material which can be applied in-situ to a wide variety of previously worn/used/in-service substrates. Once applied, it provides a barrier against corrosion, scale deposit formation, and biofilm adhesion on the circulating water-containing tube-side. Alternatively, if applied to the tube exterior, the non-wetting nature of the surface was demonstrated to promote dropwise condensation, subsequently lowering condenser backpressure and increasing overall plant efficiency. As part of this cooperative effort, the Department of Energy’s support was crucial to de-risk and demonstrate the concept of HeatX, while validating both the performance and economic benefit in multiple pilot field studies. The HeatX material properties were optimized in this effort for full field applicability to heat exchangers and condensers, and Oceanit developed the necessary procedures and protocols to provide enough material to support extended length, multi-year demonstrations in the power generation, desalination, and refining industries, making this technology broadly applicable and ready for commercial transition. Field deployment case studies at thermal power plants have shown that the HeatX treatment can provide economic savings of up to $15,000 per day for an operator based on avoiding maintenance costs and lowering fuel usage. The complete mitigation of fouling effects can increase the efficiency of equipment by up to 7%, in a field where gains of 0.5% are generally seen as operationally significant. The HeatX treatment has also demonstrated exceptional lifetime and compatibility with a wide variety of seawater and hydrocarbon environments, further increasing both the return on investment and the effective emission reduction. Such efficiency improvements correlate to massive carbon savings. For every 1 GW of capacity, operators can see carbon emissions reductions of 300,000 tons of CO 2 per year. When looking at the bigger picture, improved condenser function across the U.S. has the potential to prevent 221.3 million tons of CO 2 emissions, equivalent to the sequestration capacity of 129 million acres of forest. If applied on a global scale, 1.26 billion metric tons of CO 2 could be averted from the atmosphere, the same amount of carbon sequestrated by 1.5 billion acres of forest annually or 262,000 wind turbines operating annually. As businesses across multiple industries take a more active role in focusing on environmental, social, and governance (ESG) solutions as part of their core business operations, HeatX will be an attractive technology for commercial investment.

01 COAL, LIGNITE, AND PEAT↗

Power System Resilience Enhancement in Typhoons Using a Three-Stage Day-Ahead Unit Commitment

In this work, we propose a three-stage resilient unit commitment model which considers uncertain typhoon paths and line outages to improve the power system resilience against typhoon events. The proposed solution coordinates resources in response to the worst-case scenario for each possible typhoon path. The optimal decision is based on the characterization of the power system schedule into three stages of preventive control, emergency control, and restoration. Preventive control is performed before the typhoon occurs by quickly adjusting the three-stage resilient unit commitment schedule; emergency control is conducted during the typhoon by shedding local loads to meet the power balance, while other control strategies are assumed to be unavailable due to possible interruptions in the communication system; restoration is realized after the typhoon, when resources are optimally dispatched to repair the outages of critical devices and recover the normal operation state of the power system quickly. Considering the typhoon path uncertainty, we have introduced a stochastic model for possible typhoon paths where all possible affected lines along each typhoon path are assumed to be on outage during the typhoon. Accordingly, we explore the strategy for co-optimizing the three stages in unit commitment. The proposed model is tested on the IEEE 118-bus system and the real-world provincial system to verify its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of risk mitigation guidance for sensor placement inside mechanically ventilated enclosures – Phase 1

Guidance on Sensor Placement was identified as the top research priority for hydrogen sensors at the 2018 HySafe Research Priority Workshop on hydrogen safety in the category Mitigation, Sensors, Hazard Prevention, and Risk Reduction. This paper discusses the initial steps (Phase 1) to develop such guidance for mechanically ventilated enclosures. This work was initiated as an international collaborative effort to respond to emerging market needs related to the design and deployment equipment for hydrogen infrastructure that is often installed in individual equipment cabinets or ventilated enclosures. The ultimate objective of this effort is to develop guidance for an optimal sensor placement such that, when integrated into a facility design and operation, will allow earlier detection at lower levels of incipient leaks, leading to significant hazard reduction. Reliable and consistent early warning of hydrogen leaks will allow for the risk mitigation by reducing or even eliminating the probability of escalation of small leaks into large and uncontrolled events. To address this issue, a study of a real-world mechanically ventilated enclosure containing GH2 equipment was conducted, where CFD modeling of the hydrogen dispersion (performed by AVT and UQTR, and independently by the JRC) was validated by the NREL Sensor laboratory using a Hydrogen Wide Area Monitor (HyWAM) consisting of a 10-point gas and temperature measurement analyzer. In the release test, helium was used as a hydrogen surrogate. Expansion of indoor releases to other larger facilities (including parking structures, vehicle maintenance facilities and potentially tunnels) and incorporation into QRA tools, such as HyRAM is planned for Phase 2. It is anticipated that results of this work will be used to inform national and international standards such as NFPA 2 Hydrogen Technologies Code, Canadian Hydrogen Installation Code (CHIC) and relevant ISO/TC 197 and CEN documents.

08 HYDROGEN↗

Fault Characterization and Diagnostics Supporting Condition-Based Operation and Maintenance of Gas Turbine Engines

Condition-Based Operation and Maintenance (CBOM) is the state-of-the-art in maintenance approaches for gas turbine engines. CBOM applies engine sensor information to the optimization of future operation and maintenance procedures; this technique reduces costs for engine operators by minimizing unplanned outages and catastrophic engine degradation. However, due to the complexities of gas turbine operation and the lack of available engine sensors, further development is required to fully realize the benefits of CBOM. In the turbine section, rotating components interact with high temperature flows, which creates intense thermal and mechanical stresses. As a result, there are numerous mechanisms of component degradation in the turbine section. Furthermore, turbine components – like stator vanes and rotor blades – are among the most expensive in the engine because they are complex to design and manufacture. For these reasons, this dissertation addresses two main questions: (i) which parameters or faults within the turbine section are most important to monitor, and (ii) how can these parameters or faults be monitored in an engine-relevant environment? Although many turbine parameters and faults have been investigated in the open literature, there are some faults that are still not well understood. Rotor-casing eccentricity, which causes a non-constant blade tip clearance around the annulus, has not been investigated in terms of its effects on turbine efficiency. Therefore, the first study in this dissertation quantifies overall and local turbine efficiency for varying levels of rotor-casing eccentricity. Results showed negligible variations to overall turbine efficiency, meaning rotor-casing eccentricity only becomes relevant to CBOM when its severity causes rotordynamic issues. Purge flow is critical to turbine hardware longevity because it prevents ingestion of hot main gas path (MGP) flow into the under-platform regions. Despite its importance, there are currently no methods for monitoring purge flow performance in an engine environment. Therefore, the second study in this dissertation develops a predictive model for sealing effectiveness using inputs from two fast-response pressure sensors. Results exhibited low prediction errors across a full range of purge flow rates, which supports the viability of the modelling approach for CBOM. The final two studies in this dissertation address blade coolant flow monitoring. This cooling flow is responsible for protecting the turbine blades from the MGP flow, which exits the combustor at temperatures greater than the blade melting point. These studies showed that temperature measurements on the blade surface can be used to accurately predict blade coolant flow rate, and that defining the candidate features relative to the coolant trajectory is important for maintaining accuracy as coolant flow rate degradation occurs. This work enables blade coolant flow monitoring, which is currently not possible through existing condition monitoring techniques.

condition-based, gas turbines, diagnostics,↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.