At least 55 records · Page 3

Finding Balance Between Biological Groundwater Treatment and Treated Injection Water

At the U.S. Department of Energy’s Hanford Site, CH2M HILL Plateau Remediation Company operates the 200 West Pump and Treat which was engineered to treat radiological and chemical contaminants in groundwater as a result of the site’s former plutonium production years. Fluidized bed bioreactors (FBRs) are used to remove nitrate, metals, and volatile organic compounds. Increasing nitrate concentrations in the treatment plant effluent and the presence of a slimy biomass (a typical microorganism response to stress) in the FBRs triggered an investigation of nutrient levels in the system. Little, if any, micronutrient feed was coming into the bioreactors. Additionally, carbon substrate (used to promote biological growth) was passing through to the injection wells, causing biological fouling of the wells and reduced specific injectivity. Adjustments to the micronutrient feed improved microorganism health, but the micronutrients were being overfed (particularly manganese) plugging the injection wells further. Injection well rehabilitation to restore specific injectivity required repeated treatments to remove the biological fouling and precipitated metal oxides. A combination of sulfamic and citric acids worked well to dissolve metal oxides and sodium hypochlorite effectively removed the biological growth. Intensive surging and development techniques successfully removed clogging material from the injection wells. Ultimately, the investigation and nutrient adjustments took months to restore proper balance to the microbial system and over a year to stabilize injection well capacities. Carefully tracking and managing the FBRs and well performance monitoring are critical to balancing the needs of the treatment system while reducing fouling mechanisms in the injection wells.

Carlson, Mark A.↗

Vitrification of Sellafield Wastes with High Metallic Magnesium Alloy Content - 17495

The Sellafield nuclear complex, located in northwest England, is the largest such site in the United Kingdom. Sellafield Limited, which is the operating contractor for the Nuclear Decommissioning Authority, is evaluating thermal treatment technologies for a potential future facility to process a variety of Intermediate Level Waste sludges and slurries accumulated from historical site operations. In support of that effort, Atkins and the Vitreous State Laboratory (VSL) of The Catholic University of America conducted studies to evaluate the feasibility and implications of installing a joule-heated ceramic melter (JHCM) vitrification system to process a variety of sludge and slurry radioactive wastes at the Sellafield site. These sludges have the potential to contain a significant proportion of reactive metals in localized regions. The metallic fraction derives from unreacted Magnox spent fuel cladding. Thus, an important objective of this work was to investigate the performance of JHCM technology for the treatment of streams with localized regions of high reactive metal contents. The present work was focused on Site Ion Exchange Effluent Plant (SIXEP) Magnox sludges, investigated previously. Suitable waste simulants were developed for the SIXEP Magnox sludge waste stream, which included surrogates for all important radionuclides. High waste-loading, fully compliant glass formulations were designed using a combination of previous experience, extensive waste glass data bases, and small-scale crucible melts. Glasses from the test melts were characterized for properties that are important for processability and product quality. The most viable compositions were then selected for small-scale melter trials to collect information on processing rates and behavior, off-gas and secondary waste compositions, and overall system mass balance. These data were used to support the technology evaluation, which considered such factors as minimization of inactive additions, waste volume reduction, retention of radionuclides, minimization of secondary wastes, and overall process efficiency and effectiveness. The data were also used to develop sizing estimates for the full-scale facility and to estimate treatment durations under various treatment scenarios. A series of tests was then performed with partial replacement of the magnesium hydroxide with a metallic magnesium alloy that is close in composition to Magnox alloy. A commercially available magnesium alloy, Elecktron AZ31B, which has a nominal magnesium content of 95.7%, was used for this purpose. The testing was performed on a DuraMelter 10 (DM10) JHCM system to characterize the melter off-gas, glass product, and the effects of magnesium alloy particle size on feed processing. Data on processing rate and any processing issues, product glass composition, off-gas composition including hydrogen, and system operating parameters, including flows, temperatures, pressures, etc., were collected and analyzed to evaluate the effects of magnesium alloy on the vitrification process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WASTE TREATMENT PLANT (WTP) LIQUID EFFLUENT TREATABILITY EVALUATION (SEPTEMBER 2004)

A forecast of the radioactive, dangerous liquid effluents expected to be produced by the Waste Treatment Plant (WTP) was provided by Bechtel National, Inc. (BNI 2004). The forecast represents the liquid effluents generated from the processing of Tank Farm waste through the end-of-mission for the WTP. The WTP forecast is provided in the Appendices. The WTP liquid effluents will be stored, treated, and disposed of in the Liquid Effluent Retention Facility (LERF) and the Effluent Treatment Facility (ETF). Both facilities are located in the 200 East Area and are operated by Fluor Hanford, Inc. (FH) for the US. Department of Energy (DOE). The treatability of the WTP liquid effluents in the LERF/ETF was evaluated. The evaluation was conducted by comparing the forecast to the LERF/ETF treatability envelope (Aromi 1997), which provides information on the items which determine if a liquid effluent is acceptable for receipt and treatment at the LERF/ETF. The format of the evaluation corresponds directly to the outline of the treatability envelope document. Except where noted, the maximum annual average concentrations over the range of the 27 year forecast was evaluated against the treatability envelope. This is an acceptable approach because the volume capacity in the LERF Basin will equalize the minimum and maximum peaks. Background information on the LERF/ETF design basis is provided in the treatability envelope document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Effluents from Nuclear Power Plants Annual Report 2007

This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2007. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

61 RADIATION PROTECTION AND DOSIMETRY↗

Radioactive Effluents from Nuclear Power Plants Annual Report 2008

This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2008. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

61 RADIATION PROTECTION AND DOSIMETRY↗

Effluents from MBT plants: Plasma techniques for the treatment of VOCs

Highlights: • Dielectric Barrier Discharge was applied to remove methyl ethyl ketone from air. • Methyl ethyl ketone was chosen since it represents emissions from MBT plants. • The removal efficiency was linearly dependent on time, power and energy density. • Besides CO{sub 2}, methyl nitrate and 2,3-butanedione were the main byproducts formed. • The removal efficiency can be increased by increasing the convective flow. - Abstract: Mechanical–biological treatments (MBTs) of urban waste are growing in popularity in many European countries. Recent studies pointed out that their contribution in terms of volatile organic compounds (VOCs) and other air pollutants is not negligible. Compared to classical removal technologies, non-thermal plasmas (NTP) showed better performances and low energy consumption when applied to treat lowly concentrated streams. Therefore, to study the feasibility of the application of NTP to MBTs, a Dielectric Barrier Discharge reactor was applied to treat a mixture of air and methyl ethyl ketone (MEK), to simulate emissions from MBTs. The removal efficiency of MEK was linearly dependent upon time, power and specific input energy. Only 2–4% of MEK was converted to carbon dioxide (CO{sub 2}), the remaining carbon being involved in the formation of byproducts (methyl nitrate and 2,3-butanedione, especially). For future development of pilot-scale reactors, acting on residence time, power, convective flow and catalysts will help finding a compromise between energy consumption, desired abatement and selectivity to CO{sub 2}.

54 ENVIRONMENTAL SCIENCES↗

A Brief Review of Technologies for Separating Tritium from the Aqueous Effluent of Reprocessing Plants

The scope of this letter report encompasses a review of technologies applicable to separating tritiated water from light and heavy water with a focus on wastewater arising from the reprocessing of UNF. Reports considering flowsheet options for tritium management are also reviewed. The main objective of this letter report is to support consideration of programmatic opportunities for the Materials Recovery and Waste Form Development (MRWFD) Campaign within the Department of Energy’s Office of Nuclear Energy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Modular Design in Abatement of Fuel Element Debris (FED) Liquid Waste Stream - 16635

This paper provides a description of the processes applied within the Aqueous Discharge Abatement Plant (ADAP) at Bradwell nuclear power plant in the UK. This incorporates the Fuel Element Debris (FED) abatement plant and the Modular Active Effluent Treatment Plant (MAETP). These plants are housed in adjacent, but separate, structures and are inter-linked and share common services and control systems. The FED abatement plant, which has a shorter mission than MAETP, can be removed for decommissioning or redeployment without any impact to MAETP operation. ADAP treats aqueous waste streams generated during the ongoing decontamination and decommissioning (D and D) operations for release from the Bradwell Power Station. The plant is designed to receive and treat two major classes of liquids: 1. Slightly contaminated water from various D and D sources and collected rainwater from the power station, referred to as Aqueous Effluent (AE). 2. Dissolved fuel element debris solution. This comprises of contaminated magnesium alloy (generated during the stripping of external structures from spent Magnox fuel elements prior to shipment for reprocessing) which has been dissolved in nitric acid. All received wastes are treated to remove heavy metals and radioactive constituents prior to isolation, sampling, verification, and ultimately release to the Blackwater Estuary. The treatment consists of multiple processes including precipitation, filtration, adsorption and ion exchange carefully designed to remove targeted radionuclides and heavy metals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3,3',5-Triiodo-L-thyronine-like activity in effluents from domestic sewage treatment plants detected by in vitro and in vivo bioassays

Thyroid system-disrupting activity in effluents from municipal domestic sewage treatment plants was detected using three in vitro assays and one in vivo assay. Contaminants in the effluents were extracted by solid-phase extraction (SPE) and eluted stepwise with different organic solvents. The majority of the thyroid system-disrupting activity was detected in the dichloromethane/methanol (1/1) fraction after SPE in all three in vitro assays: competitive assays of 3,3',5-[{sup 125}I]triiodo-L-thyronine ([{sup 125}I]T{sub 3}) binding to the plasma protein transthyretin (TTR assay) and thyroid hormone receptor (TR assay) and T{sub 3}-dependent luciferase assay (Luc assay). Subsequent reverse-phase high-performance liquid chromatography (RP-HPLC) of the dichloromethane/methanol (1/1) fraction separated contaminants potent in the TR and Luc assays from those potent in the TTR assay. The contaminants potent in the TR and Luc assays were also potent in an in vivo short-term gene expression assay in Xenopus laevis (Tadpole assay). The present study demonstrated that the effluents from domestic sewage treatment plants contain contaminants with T{sub 3}-like activity of {approx} 10{sup -10} M T{sub 3}-equivalent concentration (T{sub 3}EQ) and that the TR and Luc assays are powerful in vitro bioassays for detecting thyroid system-disrupting activity in effluents. The availability and applicability of these bioassays for screening contaminants with thyroid system-disrupting activity in the water environment are discussed.

60 APPLIED LIFE SCIENCES↗

Evaluation of Ammonium and Iodine Decontamination Factors for Hanford's Waste Treatment and Immobilization Plant Feed in the Effluent Treatment Facility

Savannah River National Laboratory (SRNL) reviewed the unit operations in the Effluent Treatment Facility (FTP) at the Hanford site to estimate the partitioning of iodine and ammonia when processing Waste Treatments and Immobilization Plant (WTP) feed. The evaluation consisted of literature and vendor data reviews and no experiments were performed. A list of the unit operations reviewed, along with estimated decontamination factors (DFs) for both iodine and ammonium are shown in the table below. With the exception of the Peroxide Decomposer, reasonable estimations of the decontamination factors for all operations are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience on Safety Review of Liquid and Gaseous Effluent Monitoring System for Nuclear Power Plants in Korea - 16237

The liquid and gaseous effluent monitoring systems are important components in order to evaluate and minimize the radiation environmental impacts from Nuclear Power Plants (NPPs). Therefore, licensee should install liquid and gaseous effluent monitoring systems and these systems should be reviewed by regulatory body. In Korea, the criteria of liquid and gaseous effluent monitoring systems for NPPs are stipulated in Nuclear Safety Act (NSA) and subordinate statute, and it is stated in 'Regulation on Technical Standards for Nuclear Reactor Facilities, etc.' that 'Instrumentation shall be provided to monitor related variables, including the following, and systems over their anticipated ranges of normal operations, anticipated operational occurrences, and accident conditions'. RG-1.97(Rev. 3, 1983) of US Nuclear Regulatory Commission (NRC) was used as criterion for accident monitoring instrumentations for NPPs in Korea. Licensee, however, started to apply RG-1.97(Rev. 4, 2006) as new criterion for accident monitoring instrumentation of the Construction Permit (CP) of new NPPs (Shin-kori Unit 5 and 6). Licensee submitted the report for type selection criteria and this report shows selection criteria of from 'Type A variables' to 'Type E variables'. Licensee of Korea has plans to submit the validation report regarding the criteria for accident monitoring instrumentation during Operation License (OL) and regulatory body of Korea also will conduct safety review of these reports. A graded approach to establishing a sampling program is required in ANSI/HPS N13.1-1999. Because deaerator release pipe of Shin-kori unit 5, 6 was integrated into condenser vacuum system release pipe, regulatory body reviewed application of a graded approach on this integration. Output of PWR GALE shows that iodine released from turbine building is 0.12% of total iodine release amount and this value is potential impact categories (PICs) 3 in ANSI/HPS N13.1-1999. So, periodic sampler installed in condenser vacuum system release pipe in Shin-kori unit 5, 6 is suitable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗