Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “permitting timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

42 records · Page 3

Balancing Participation and Speed: A Polycentric Governance Lens on Renewable‐Energy Siting

Siting and permitting for renewable projects vary in process and authority structures. Such variation can create coordination challenges and inconsistent public participation processes. We develop a Governance Trade-Off Matrix to classify permitting processes by (1) authority structure (polycentric vs. monocentric) and (2) procedural extensiveness (minimal vs. extensive). The matrix shows when jurisdictional dispersion enables timely implementation and when it creates coordination breakdowns. We propose testable hypotheses on how governance design affects project timelines, conflict escalation, and local acceptance. Here, the framework highlights design levers, like single lead agencies, structured public involvement, and statutory shot clocks, to reconcile meaningful local input with urgent climate imperatives.

14 SOLAR ENERGY↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

PermitTEC v0.1: Standardized Metadata Corpus of NEPA Litigation Documents

The National Environmental Policy Act of 1969, as amended (NEPA), mandates that federal agencies assess and document potential environmental impacts before deciding on proposed actions. While significant progress has been made in cataloging and standardizing NEPA documents themselves, the legal challenges that frequently arise from these decisions remain poorly cataloged and largely inaccessible for systematic analysis. Litigation challenging NEPA compliance can substantially delay project timelines, reshape agency decision-making, and establish precedents that influence future environmental reviews — yet no standardized, machine-readable corpus exists that links litigation records to the NEPA projects they contest.

54 ENVIRONMENTAL SCIENCES↗