Engineering PapersSearch

SEARCH · Engineering Papers

Results for “performance objectives”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Adopting an Objectives-Driven Assurance Case Approach for Achieving Space Flight Mission Planetary Protection Objectives

Traditionally, NASA has utilized prescriptive technical and process requirements to ensure safety and mission assurance performance objectives for space flight missions are achieved. While prescriptive re-quirements may be easier to communicate and manage throughout the systems engineering process, the highly-constrained nature of prescriptive requirements can limit the ability to take advantage of cost-saving opportunities and offer limited ability to explore other options or alternative designs, processes, and methods. It can also be difficult to develop prescriptive requirements for objectives that are prob-abilistic in nature or that cannot be satisfied by direct verification. In contrast, the development of an assurance case allows for a compelling, comprehensible, and valid argument to be developed with support-ing evidence that shows safety and mission assurance objectives have been satisfied. Analogous to how patent applications are constructed for inventions, an assurance case has a high-level claim of meeting a safety and mission assurance objective, followed by a more specific set of sub-claims and technical evidence which supports the claims. The objectives-driven assurance case approach allows for a better understand-ing and exploration of the trade space, more flexibility to balance trades, and the ability to realize and implement technical and process innovations for resource, time, and cost savings. The assurance case is a living case that evolves over the entire program life cycle. Recently, NASA’s Office of Planetary Pro-tection (OPP) has adopted the assurance case approach as an acceptable methodology for demonstrating avoidance of contamination of target solar system bodies explored by NASA space flight missions. This methodology has been incorporated into NASA’s new technical standard for planetary protection and is currently being utilized by the Mars Sample Return campaign for safe sample containment during sample return. This presentation will explore the development and implementation of an assurance case approach in the context of planetary protection, the shift from prescriptive requirements and the ongoing culture change in the technical community, and the support and guidance from NASA’s OPP in adopting the assurance case approach for achieving planetary protection objectives on NASA’s space flight missions.

Elaine Seasly

K-band high power latching switch

A 19 GHz waveguide latching switch with a bandwidth of 1400 MHz and an exceptionally low insertion loss of 0.25 dB was demonstrated. The RF and driver ferrites are separate structures and can be optimized individually. This analysis for each structure is separately detailed. Basically, the RF section features a dual turnstile junction. The circulator consists of a dielectric tube which contains two ferrite rods, and a dielectric spacer separating the ferrite parts along the center of symmetry of the waveguide to form two turnstiles. This subassembly is indexed and locked in the center of symmetry of a uniform junction of three waveguides by the metallic transformers installed in the top and bottom walls of the housing. The switching junction and its actuating circuitry met all RF performance objectives and all shock and vibration requirements with no physical damage or performance degradation. It exceeds thermal requirements by operating over a 100 C temperature range (-44 C to +56 C) and has a high power handling capability allowing up to 100 W of CW input power.

Mlinar, M. J.

Flight simulator platform motion and air transport pilot training

The effect of a flight simulator platform motion on the performance and training of a pilot was evaluated using subjective ratings and objective performance data obtained on experienced B-727 pilots and pilots with no prior heavy aircraft flying experience flying B-727-200 aircraft simulator used by the FAA in the upgrade and transition training for air carrier operations. The results on experienced pilots did not reveal any reliable effects of wide variations in platform motion design. On the other hand, motion variations significantly affected the behavior of pilots without heavy-aircraft experience. The effect was limited to pitch attitude control inputs during the early phase of landing training.

Lee, Alfred T.

Overview of NASA's Space Solar Power Technology Advanced Research and Development Program

Large solar power satellite (SPS) systems that might provide base load power into terrestrial markets were examined extensively in the 1970s by the US Department of Energy (DOE) and the National Aeronautics and Space Administration (NASA). Following a hiatus of about 15 years, the subject of space solar power (SSP) was reexamined by NASA from 1995-1997 in the 'fresh look' study, and during 1998 in an SSP 'concept definition study', and during 1999-2000 in the SSP Exploratory Research and Technology (SERT) program. As a result of these efforts, during 2001, NASA has initiated the SSP Technology Advanced Research and Development (STAR-Dev) program based on informed decisions. The goal of the STAR-Dev program is to conduct preliminary strategic technology research and development to enable large, multi-megawatt to gigawatt-class space solar power (SSP) systems and wireless power transmission (WPT) for government missions and commercial markets (in-space and terrestrial). Specific objectives include: (1) Release a NASA Research Announcement (NRA) for SSP Projects; (2) Conduct systems studies; (3) Develop Component Technologies; (4) Develop Ground and Flight demonstration systems; and (5) Assess and/or Initiate Partnerships. Accomplishing these objectives will allow informed future decisions regarding further SSP and related research and development investments by both NASA management and prospective external partners. In particular, accomplishing these objectives will also guide further definition of SSP and related technology roadmaps including performance objectives, resources and schedules; including 'multi-purpose' applications (commercial, science, and other government).

Howell, Joe

Space Solar Power Demonstrations: Challenges and Progress

The prospects of using electrical power beamed from space are coming closer to reality with the continued pursuit and improvements in the supporting space solar research and technology. Space Solar Power (SSP) has been explored off and on for approximately three decades as a viable alternative and clean energy source. Results produced through the more recent Space Solar Power Exploratory Research and Technology (SERT) program involving extensive participation by industry, universities, and government has provided a sound technical basis for believing that technology can be improved to the extent that SSP systems can be built, economically feasible, and successfully deployed in space. Considerable advancements have been made in conceptual designs and supporting technologies including solar power generation, wireless power transmission, power management distribution, thermal management and materials, and the integrated systems engineering assessments. Basic technologies have progressed to the point were the next logical step is to formulate and conduct sophisticated demonstrations involving prototype hardware as final proof of concepts and identify high end technology readiness levels in preparation for full scale SSP systems designs. In addition to continued technical development issues, environmental and safety issues must be addressed and appropriate actions taken to reassure the public and prepare them for the future use of this alternative renewable energy resource. Accomplishing these objectives will allow informed future decisions regarding further SSP and related R&D investments by both NASA management and prospective external partners. In particular, accomplishing these objectives will also guide further definition of SSP and related technology roadmaps including performance objectives, resources and schedules; including 'multi-purpose' applications (terrestrial markets, science, commercial development of space, and other government missions).

Howell, Joe T.

Design and Verification

As future space missions become longer, an important aspect to consider is the habitability of the spacecraft. The amount of habitable volume affects not only astronaut comfort, but safety and mission success as well. However, as the volume is increased to aid in task performance, the weight of the vehicle and cost of the mission escalates in proportion. Pressure to reduce mission cost is constant, but the risk to mission success and crew survival must remain the priorities. The Constellation Program's Altair Lunar Lander is designed for short duration surface operation missions of seven to ten days. For short duration missions, humans will tolerate fairly primitive environmental situations provided the basic physiological arrangements are acceptable. However, for long-duration lunar surface operations, the living and operational spaces within which the crew work must provide both the essentials of life, as well as the support necessary for the crew to be productive in accomplishing their mission. The Altair is still in the preliminary design phase, which is the optimal time for Human Factors data to be provided to designers and engineers. A Human Centered Design (HCD) approach is being taken with our Human Factors evaluations. Human-in-the-loop testing is conducted using low-medium fidelity mock-ups of proposed lunar architecture. Based on current ConOps (Concept of Operations) procedures, a task analysis is performed in which individual tasks are combined into larger operational scenarios. Subjective and objective performance measures are gathered at both the task and scenario level. These scores are used to determine the functionality of the vehicle in terms of task performance. Results from these evaluations will highlight areas for design or operational improvement.

Thompson, Shelby G.

Establishing a Distance Learning Plan for International Space Station (ISS) Interactive Video Education Events (IVEE)

Educational outreach is an integral part of the International Space Station (ISS) mandate. In a few scant years, the International Space Station has already established a tradition of successful, general outreach activities. However, as the number of outreach events increased and began to reach school classrooms, those events came under greater scrutiny by the education community. Some of the ISS electronic field trips, while informative and helpful, did not meet the generally accepted criteria for education events, especially within the context of the classroom. To make classroom outreach events more acceptable to educators, the ISS outreach program must differentiate between communication events (meant to disseminate information to the general public) and education events (designed to facilitate student learning). In contrast to communication events, education events: are directed toward a relatively homogeneous audience who are gathered together for the purpose of learning, have specific performance objectives which the students are expected to master, include a method of assessing student performance, and include a series of structured activities that will help the students to master the desired skill(s). The core of the ISS education events is an interactive videoconference between students and ISS representatives. This interactive videoconference is to be preceded by and followed by classroom activities which help the students aftain the specified learning objectives. Using the interactive videoconference as the centerpiece of the education event lends a special excitement and allows students to ask questions about what they are learning and about the International Space Station and NASA. Whenever possible, the ISS outreach education events should be congruent with national guidelines for student achievement. ISS outreach staff should recognize that there are a number of different groups that will review the events, and that each group has different criteria for acceptance. For example, school administrators are more likely to be concerned about an event meeting national standards and the cost of the event. In contrast, a teacher's acceptance of an education event may be directly related to the amount of extra work the event imposes upon that teacher. ISS education events must be marketed differently to the different groups of educators, and must never increase the workload of the average teacher.

Wallington, Clint

Adopting an Objectives-Driven Assurance Case Approach for Achieving Space Flight Mission Planetary Protection Objectives

Traditionally, the National Aeronautics and Space Administration (NASA) has utilized prescriptive technical and process requirements to ensure safety and mission assurance performance objectives for planetary protection are achieved during space flight missions. While prescriptive requirements may be easier to communicate and manage throughout the systems engineering process, the highly constrained nature of prescriptive requirements can limit the ability to take advantage of cost-saving opportunities and offer limited ability to explore other options or alternative designs, processes, and methods. It can also be difficult to develop prescriptive requirements for objectives that are probabilistic in nature or that cannot be satisfied by direct verification. In contrast, the development of an assurance case allows for a compelling, comprehensible, and valid argument to be developed with supporting evidence that shows safety and mission assurance objectives have been satisfied. Analogous to how patent applications are constructed for inventions, an assurance case has a high-level claim of meeting a safety and mission assurance objective, followed by a more specific set of sub-claims and technical evidence which supports the claims. The objectives-driven assurance case approach allows for a better understanding and exploration of the trade space, more flexibility to balance trades, and the ability to realize and implement technical and process innovations for resource, time, and cost savings. The assurance case is a living case that evolves over the entire program life cycle. Recently, NASA’s Office of Planetary Protection (OPP) has adopted the assurance case approach as an acceptable methodology for demonstrating avoidance of contamination of target solar system bodies explored by NASA space flight missions. This methodology has been incorporated into NASA’s new technical standard for planetary protection and is currently being utilized by the Mars Sample Return campaign for safe sample containment during sample return.

Assurance Case

Loop Gain and Circuit Parameters for Residual Carrier Tracking in the Advanced DSN Block V Receiver

A circuit level analysis for residual carrier tracking of a deep space network signal by a proposed Block V receiver as conceived by the Receiver Advanced Development Team is presented. The objective is to aid the circuit designer in selection of loop parameters to achieve the required performance objectives. The topics specifically addressed are: (1) loop stability and gain requirements, (2) loop component parametric equations, and (3) phase detector technology.

Young, P. H.

Multilevel decomposition approach to the preliminary sizing of a transport aircraft wing

A multilevel/multidisciplinary optimization scheme for sizing an aircraft wing structure is described. A methodology using nonlinear programming in application to a very large engineering problem is presented. This capability is due to the decomposition approach. Over 1300 design variables are considered for this nonlinear optimization task. In addition, a mathematical link is established coupling the detail of structural sizing to the overall system performance objective, such as fuel consumption. The scheme is implemented as a three level system analyzing aircraft mission performance at the top level, the total aircraft structure as the middle level, and individual stiffened wing skin cover panels at the bottom level. Numerical show effectiveness of the method and its good convergence characteristics.

Wrenn, Gregory A.

Rapid prototyping 3D virtual world interfaces within a virtual factory environment

On-going work into user requirements analysis using CLIPS (NASA/JSC) expert systems as an intelligent event simulator has led to research into three-dimensional (3D) interfaces. Previous work involved CLIPS and two-dimensional (2D) models. Integral to this work was the development of the University of Massachusetts Lowell parallel version of CLIPS, called PCLIPS. This allowed us to create both a Software Bus and a group problem-solving environment for expert systems development. By shifting the PCLIPS paradigm to use the VEOS messaging protocol we have merged VEOS (HlTL/Seattle) and CLIPS into a distributed virtual worlds prototyping environment (VCLIPS). VCLIPS uses the VEOS protocol layer to allow multiple experts to cooperate on a single problem. We have begun to look at the control of a virtual factory. In the virtual factory there are actors and objects as found in our Lincoln Logs Factory of the Future project. In this artificial reality architecture there are three VCLIPS entities in action. One entity is responsible for display and user events in the 3D virtual world. Another is responsible for either simulating the virtual factory or communicating with the real factory. The third is a user interface expert. The interface expert maps user input levels, within the current prototype, to control information for the factory. The interface to the virtual factory is based on a camera paradigm. The graphics subsystem generates camera views of the factory on standard X-Window displays. The camera allows for view control and object control. Control or the factory is accomplished by the user reaching into the camera views to perform object interactions. All communication between the separate CLIPS expert systems is done through VEOS.

Kosta, Charles Paul

A turbojet-boosted two-stage-to-orbit space transportation system design study

The concept to use twin turbo-powered boosters for acceleration to supersonic staging speed followed by an all rocket powered orbiter stage was proposed. A follow-on design study was then made of the concept with the performance objective of placing a 29,483 Kg payload into a .2.6 X 195.3 km orbit. The study was performed in terms of analysis and trade studies, conceptual design, utility and economic analysis, and technology assessment. Design features of the final configuration included: strakes and area rule for improved take off and low transonic drag, variable area inlets, exits and turbine, and low profile fixed landing gear for turbojet booster stage. The payload required an estimated GLOW of 1,270,000 kg for injection in orbit. Each twin booster required afterburning turbojet engines each with a static sea level thrust rating of 444,800 N. Life cycle costs for this concept were comparable to a SSTO/SLED concept except for increased development cost due to the turbojet engine propulsion system.

Hepler, A. K.

Experimental experience with flexible structures

The focus is on a flexible structure experiment developed at the California Institute of Technology. The main thrust of the experiment is to address the identification and robust control issues associated with large space structures by capturing their characteristics in the laboratory. The design, modeling, identification and control objectives will be discussed. Also, the subject of uncertainty in structural plant models and the frequency shaping of performance objectives will be expounded upon. Theoretical and experimental results of control laws designed using the identified model and uncertainty descriptions will be presented.

Balas, Gary J.

Automation - Changes in cognitive demands and mental workload

The effect of partial automation on mental workloads in man/machine tasks is investigated experimentally. Subjective workload measures are obtained from six subjects after performance of a task battery comprising two manual (flight-path control, FC, and target acquisition, TA) tasks and one decisionmaking (engine failure, EF) task; the FC task was performed in both a fully manual (altitude and lateral control) mode and in a semiautomated mode (autmatic latitude control). The performance results and subjective evaluations are presented in graphs and characterized in detail. The automation is shown to improve objective performance and lower subjective workload significantly in the combined FC/TA task, but not in the FC task alone or in the FC/EF task.

Tsang, Pamela S.

TPSAS-NF1676L-30697-DND

The goal of the NASA X-57 Electric Airplane was to utilize the versatility and efficiency of electric propulsion to design a cruise optimized airplane. The wing planform was reduced 42%. A slotted flap and distributed fan system were developed to achieve CL?s in excess of 4.0. Performance objectives, features of the wing and high-lift system, as well as integration considerations will be discussed. CFD performance analysis and details of the integrated structure will be discussed.

Jeff Viken

Comanche Helmet-Mounted Display Symbology Simulation

The Aeroflightdynamics Directorate (AMRDEC) conducted a simulation to examine the performance of the Comanche Contact Analog world-referenced symbology displayed on the Comanche HIDSS when compared with a compressed symbology design similar to that specified by the former MIL-STD 1295. Six experimental test pilots flew one modified ADS-33 maneuver (hover turn, bob-up), an unusual attitude recovery, and two terrain flight tactical tasks in the NASA Vertical Motion Simulator (VMS). Analysis of the pilot objective performance data and subjective data showed the following results. Objective test results showed that 1295 symbology yielded more rapid maneuvering in the hover turn bob-up than Contact Analog symbology. The average margin of difference in the time to complete the maneuver was approximately two seconds, which was statistically significant. There were no significant differences measured between symbology sets with respect to altitude or position performance measures for all other maneuvers. The NOE target ID task data showed improved accuracy in determining heading to target when using Contact Analog over MIL-STD-1295. Subjective test results, including handling qualities ratings (HQRs) and NASA-TLX workload ratings, showed small but consistent advantages of 1295 symbology over Contact Analog for most parameters. For the bob-up maneuver, 1295 symbology handling qualities were rated Desired for lateral position error and time to complete whereas Contact Analog was rated adequate. The average HQRs for all other maneuvers were rated the same for both symbology sets. Pilot comments and the results of an online questionnaire more strongly favored 1295 over Contact Analog. Repeated comments from all six pilots led to a focus on design issues with six Contact Analog symbols. Those symbols were the heading tape, horizon line, radar altitude six-second predictor, the position of the torque symbol, the absence of a hover position cue, and the widespread positioning of the symbology to the outer edges of the display field-of-view. Pilots rated the present design of three of the six symbols as having safety-of-flight implications. Those symbols were the heading tape, horizon line, and six-second predictor. To summarize, test results showed no objective data that would warrant restricting experimental test pilots from flying constrained tasks. Small but consistent advantages were recorded for the MILSTD-1295 symbology design when executing ADS-33 constrained tasks. No general performance differences were recorded for the operational maneuvers (NOE, contour flight modes) except for the azimuth-to-target task, which favored the Contact Analog heading tape design. There were consistent and strong pilot comments supporting the MIL-STD-1295 design over Contact Analog in both this current simulation and in Comanche Sim I. Three Contact Analog symbols warrant modification and further evaluation to mitigate safety-of-flight implications noted by participating test pilots. A plan for symbology redesign and testing was developed. However, the Comanche program was cancelled by Department of Army in February 2004.

Turpin, Terry S.

Traction-drive force transmission for telerobotic joints

The U.S. Space Station Program is providing many technological developments to meet the increasing demands of designing such a facility. One of the key areas of research is that of telerobotics for space station assembly and maintenance. Initial implementation will be teleoperated, but long-term plans call for autonomous robotics. One of the essential components for making this transition successful is the manipulator joints mechanism. Historically, teleoperated manipulators and industrial robotics have had very different mechanisms for force transmission. This is because the design objectives are almost mutually exclusive. A teleoperator must have very low friction and inertia to minimize operator fatigue; backlash and stiffness are of secondary concern. A robot, however, must have minimum backlash, and high stiffness for accurate and rapid positioning. A joint mechanism has yet to be developed that can optimize these divergent performance objectives. A joint mechanism that approaches this optimal performance was developed for NASA Langley, Automation Technology Branch. It is a traction-drive differential that uses variable preload mechanisms. The differential provides compact, dexterous motion range with a torque density similar to geared systems. The traction drive offers high stiffness and zero backlash, for good robotic performance, and the variable loading mechanism (VLM) minimizes the drive-train friction, for improved teleoperation.

Kuban, D. P.

Software cost/resource modeling: Software quality tradeoff measurement

A conceptual framework for treating software quality from a total system perspective is developed. Examples are given to show how system quality objectives may be allocated to hardware and software; to illustrate trades among quality factors, both hardware and software, to achieve system performance objectives; and to illustrate the impact of certain design choices on software functionality.

Lawler, R. W.