Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Guidance and Recommendations for Streamlining Reporting for Federal Energy and Water Efficiency Projects

Federal agencies are required to report on their progress in meeting various energy and water management requirements. These reporting requirements encompass energy and water projects at federal facilities, including projects that are alternatively financed, e.g., conducted through energy savings performance contracts (ESPCs) or utility energy service contracts (UESCs). The purpose of this guidance is to provide recommendations to streamline federal agency reporting. The guidance recommends the use of eProject Builder (ePB), a project development and archiving tool for energy projects. ePB carries additional value in its simplification of federal agency reporting by dovetailing with the Federal Energy Management Program’s (FEMP’s) EISA 432 Compliance Tracking System (CTS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Effect of Active Lengthening and Shortening on Small-Angle X-ray Reflections in Skinned Skeletal Muscle Fibres

Our purpose was to use small-angle X-ray diffraction to investigate the structural changes within sarcomeres at steady-state isometric contraction following active lengthening and shortening, compared to purely isometric contractions performed at the same final lengths. We examined force, stiffness, and the 1,0 and 1,1 equatorial and M3 and M6 meridional reflections in skinned rabbit psoas bundles, at steady-state isometric contraction following active lengthening to a sarcomere length of 3.0 µm (15.4% initial bundle length at 7.7% bundle length/s), and active shortening to a sarcomere length of 2.6 µm (15.4% bundle length at 7.7% bundle length/s), and during purely isometric reference contractions at the corresponding sarcomere lengths. Compared to the reference contraction, the isometric contraction after active lengthening was associated with an increase in force (i.e., residual force enhancement) and M3 spacing, no change in stiffness and the intensity ratio I 1,1 /I 1,0 , and decreased lattice spacing and M3 intensity. Compared to the reference contraction, the isometric contraction after active shortening resulted in decreased force, stiffness, I 1,1 /I 1,0 , M3 and M6 spacings, and M3 intensity. This suggests that residual force enhancement is achieved without an increase in the proportion of attached cross-bridges, and that force depression is accompanied by a decrease in the proportion of attached cross-bridges. Furthermore, the steady-state isometric contraction following active lengthening and shortening is accompanied by an increase in cross-bridge dispersion and/or a change in the cross-bridge conformation compared to the reference contractions.

59 BASIC BIOLOGICAL SCIENCES↗

Quantifying Occupant Health and Productivity for Deep Retrofits: Beyond Traditional IEQ Studies

As energy-efficiency standards for both new construction and existing building renovations become more stringent, further reductions become less tractable and more expensive. With increasing interest and rising investment in healthy built environments, integrating energy efficiency with improved occupant experience (i.e., health, comfort, and work performance) offers a new path to drive deep energy retrofits. However, the difficulty in quantifying and verifying health and productivity gains from building upgrades leads to lower valuation of human benefits in practice. Building codes and standards have progressive energy targets but often give minimum requirements to occupant health for factors such as ventilation and thermal comfort. State and federal laws in the United States that govern the energy service performance contract (ESPC) have no clear and consistent guidance on quantifying non-energy benefits and incorporating them into a formal cost-effectiveness analysis. This paper presents a methodology to measure a building’s potential performance improvement regarding occupant health based on existing evidence correlating IEQ to occupant outcomes. Health improvement measures are integrated with a building energy model to identify and measure the impact of holistic improvement strategies. The net present value of these measures is determined based on the investment costs required to attain those improvements, energy savings, and personnel gains. We will discuss results from one pilot building, which showed nearly $50 per square foot 20-year net present value using the integrated approach.

Keene, Kevin M.↗

Recognizing and Assigning Risks and Responsibilities Using the Risk, Responsibility, and Performance (RRP) Matrix

The Risk, Responsibility, and Performance Matrix (RRP Matrix) is the energy savings performance contract (ESPC) document that focuses on 16 areas of risks and responsibilities in an ESPC project. The RRP Matrix summarizes and documents the contractor (energy service company, i.e., ESCO) and ordering agency’s agreements about allocating risks and responsibilities – to the ESCO, to the ordering agency, or shared. Ordering agencies and ESCOs should be mindful, however, that the ESCO remains responsible for achieving energy savings guaranteed under the ESPC, notwithstanding the allocations of risks, responsibilities, and performance.

Walker, Christine↗

U.S. ESCO Industry: Industry Size and Recent Market Trends

This study is the latest in a series of LBNL research into U.S. ESCO industry characteristics and market trends. The research is based on interviews with ESCO industry executives conducted during the fall of 2019 and the first half of 2020. Nearly all companies that identified themselves as ESCOs were contacted as part of this project. We find that after a period of little growth (2011-2014), industry revenues reached an estimated $6 billion in 2018, or a 3.4% annual average growth rate from 2015-2018. ESCOs primarily serve the public an institutional sectors (e.g., federal, state, and local governments; university and colleges; and K-12 schools). In 2018, project investments by public and institutional organizations accounted for over 90% of industry revenue, which is consistent with previous industry studies. ESCO activity in the Middle Atlantic, East North Central, and Pacific regions in the U.S. delivered the highest share of revenue in 2018, which is also consistent with earlier research. ESCOs reported that a majority of their customers use energy savings performance contracts (ESPCs) primarily for facility capital improvement needs and resilience rather than utility savings. In addition, the importance of non-energy benefits (e.g., water savings, avoided operations and maintenance costs, and avoided capital costs) accounted for in the project savings guarantee reportedly increased in all markets during 2016-2018 compared to previous time periods. The study found that the ESCO industry faces several key challenges, including: (1) increasing project development times due to more complex projects and other factors; (2) difficulty finding qualified subcontractors in some regions, including minority- women- and disadvantaged population-owned small business enterprises; and (3) difficulty accessing project documents and quickly fulfilling customer requests to justify project payments several years into the performance period of a project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

torch-einshard v1.0

torch-einshard is a Python library for describing local and distributed PyTorch tensor computations with compact, einsum-like notation. Its expressions name logical axes, specify how they are sharded across a PyTorch DeviceMesh, and represent partial reductions. The library automatically performs contractions, permutations, reshaping, splitting, gathering, reduction, reduce-scatter, and repartitioning while preserving autograd. Additional features include sharding-aware FFTs, tensor rolls, halo exchange, sliding windows, 1D–3D convolutions, uneven-shard handling, parameter initialization and gradient management, and cost-based execution planning. It is designed for scientific machine learning and large-model workloads, including tensor-, sequence-, and spatial-parallel MLPs, attention, convolutions, and spectral operations. Compared with manually combining torch.einsum and distributed collectives, torch-einshard expresses both the mathematical operation and data placement in one readable formula. This reduces boilerplate and synchronization errors, keeps forward and backward communication consistent, and allows the library to select optimized collective strategies without changing model code.

Morozov, Dmitriy [Lawrence Berkeley National Labor↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2019

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 187 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Procurement Options for Low Temperature Geothermal Technologies at Federal Facilities

Federal agencies are moving towards more efficient and resilient facilities by increasingly implementing energy projects in an effort to meet federally mandated goals, agency needs, and administration priorities. Low temperature geothermal technologies, which include geothermal heat pumps (GHP) and district heating systems, can contribute to meeting these goals. These technologies provide facilities with heating and cooling while reducing facility energy use and improving resilience. However, in order to implement these solutions, federal facilities must identify and execute a strategy for the procurement of these technologies. Federal facilities have successfully completed energy efficiency projects using a variety of procurement options. The purpose of this document is to provide federal agencies with a comprehensive overview of the procurement options available for low temperature geothermal technologies and other energy efficiency projects. The procurement options discussed include third-party financing mechanisms such as energy saving performance contracts (ESPCs), ESPC energy sales agreements (ESPC ESAs), and utility energy service contracts (UESCs), as well as dedicated funds in the form of federal grants and appropriated funds.

15 GEOTHERMAL ENERGY↗

Evaluating GHG Mitigation Potential from ESPC Projects [Slides]

This report explores the impact of implemented ESPC projects on the projected greenhouse gas (GHG) emissions reductions in the U.S. buildings sector, and the associated projected annual cost savings and marginal abatement costs. It is important to investigate the role that energy retrofits can play in achieving GHG emission reduction targets given the use of ESPC by public agencies to reduce emissions from energy use in addition to the historical use of ESPC to to achieve cost/energy savings and ancillary benefits (e.g., addressing deferred maintenance, aging infrastructure, etc.). The analysis draws from LBNL’s eProject Builder (ePB) database, which contains approximately 3,000 energy retrofit projects implemented by energy service companies (ESCOs), mostly energy savings performance contract (ESPC) projects. This is the first report to model GHG emission reductions from ongoing ESPC projects in the U.S public sector based on ePB project data. It is intended for policymakers, federal, state and local government officials and other potential ESPC customers, the ESCO industry, researchers, and other energy policy professionals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. ESCO Industry Report: Industry Size and Recent Market Trends, 2022- 2024

The latest edition of the U.S. Energy Service Company (ESCO) Industry Report by Lawrence Berkeley National Laboratory (LBNL) finds that the U.S. ESCO industry continues to show strong growth. The report draws from ESCO industry reported revenue data for the 2022-2024 period, detailing the current size and characteristics of the U.S. ESCO industry. Following 20 years of ESCO industry reports, the 2024 report explores significant revenue trends across market segments, geographic regions, ESCO size, financing structures, and business activities. New analysis in this report outlines customer priorities and non-energy benefit drivers of Energy Savings Performance Contract projects, adjusted revenue analysis detailing the impacts of inflation on industry growth, and project challenges by market segment.

Chelminski, Kathryn↗

ESPC ESA Overview and Requirements

This webinar is the first of a series that provides information, best practices, and resources for implementing energy savings performance contract (ESPC) energy sales agreement (ESA) projects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Net Zero Labs Pilot: NREL Roadmap to Decarbonization

NREL's Roadmap to decarbonize its campus aligns with Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad and EO 14057 Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. NREL's strategic approach to reach net-zero emissions for its operational footprint and will occur in phases over the next decade. Decarbonizing NREL's footprint will require the elimination of greenhouse gas (GHG) emissions from all campus facilities' energy use and will be achieved through energy efficiency enhancements and the increased integration of clean energy sources. Engaging the private sector through an energy savings performance contract (ESPC) and relationships with NREL's utility providers will be crucial to NREL's implementation strategy.

decarbonize↗

Better bang for your buck? Comparing savings realization from ESPCs and direct-funded projects

Energy savings performance contracts (ESPCs) offer an opportunity to tremendously scale decarbonization projects, given their paid-from-savings premise. However, prospective customers still question whether ESPC is worth the effort and expense. This study evaluates the savings realization rates of ESPCs compared to direct-funded projects using ENERGY STAR Portfolio Manager (ESPM) benchmarking data. It compares normalized EUIs from ESPM before and after energy conservation projects implemented via ESPC or direct funding in roughly 450 federal buildings. This documented change, ideally a savings, can then be compared to the estimated savings from the energy conservation initiative in order to generate a rough realization rate. Preliminary results indicate a notably greater savings realization rate for the ESPC buildings (median = 105% of estimated savings) than those that underwent direct-funded projects (median = 46%). Because of a shortage of good quality data and the wide range in results, the difference is only significant at the p < 0.20 level. However, the higher savings realization of ESPCs corroborates the authors’ 2014 findings using a different comparison method. With continued soft government funding and regulatory impediments for climate change mitigation in the U.S., financed, paid-from-savings project models (e.g., ESPC, PACE, EaaS and others) certainly merit more attention. This study’s results are particularly compelling (and encouraging) given the country’s likely reliance on these vehicles to address existing building retrofits.

Earni, Shankar↗

Athena: High-Performance Sparse Tensor Contraction Sequence on Heterogeneous Memory

Sparse tensor contraction sequence has been widely employed in many fields, such as chemistry and physics. However, how to efficiently implement the sequence faces multiple challenges, such as redundant computations and memory operations, massive memory consumption, and inefficient utilization of hardware. To address the above challenges, we introduce Athena, a high-performance framework for SpTC sequences. Athena introduces new data structures, leverages emerging Optane-based heterogeneous memory (HM) architecture, and stage parallelism. In particular, Athena introduces shared hash table-represented sparse accumulator to eliminate unnecessary input processing and data migration; Athena uses a novel data-semantic guided dynamic migration solution to make the best use of the Optane-based HM for high performance; Athena also co-runs execution phases with different characteristics to enable high hardware utilization. Evaluating with 12 datasets, we show that Athena brings 327-7362× speedup over the state-of-the-art SpTC algorithm. With the dynamic data placement guided by data semantics, Athena brings performance improvement on Optane-based HM over a state-of-the-art software-based data management solution, a hardware-based data management solution, and PMM-only by 1.58×, 1.82×, and 2.34× respectively.

Liu, Jiawen↗

UESC Overview and FEMP Resources for Project Success

The first part of this webinar provides an introduction to utility energy service contracts (UESCs) and describes the features and benefits of utilizing UESCs to install energy conservation measures at federal sites. The second part introduces the newly launched UESC On-Demand Training Series and other recently published FEMP resources. The modular series of short webinars has been designed to provide in-depth understanding of UESCs and is a great resource for federal agencies and utilities interested in UESC projects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Iodine Removal in the DFLAW Flow-Sheet

In support of the WTP project, off-gas system and regulatory testing has been conducted previously on the DM1200 pilot melter equipped with a prototypical off-gas system installed at The Catholic University of America’s Vitreous State Laboratory (VSL). During the regulatory tests, an AC-S test bed filled with Kombisorb BAT 37 was included in the prototypical off-gas system and evaluated for response to HLW and LAW exhaust streams. Offline testing and small-scale testing of that media were also conducted. Testing demonstrated that a temperature rise occurred in the activated carbon media when water vapor was first introduced to virgin Kombisorb BAT 37, in response to high nitrogen oxide concentrations, and in response to the presence of organic compounds. Conditioning of the test bed by gradually increasing the NOx concentration prior to the introduction of organics was found to be an important operational strategy for preventing larger temperature excursions. However, no mercury was present in the exhaust stream during DM1200 testing and therefore comparable test data for mercury removal efficiency or temperature response of the carbon media in the presence of mercury were not collected in the DM1200 tests. In view of the need for data on mercury removal performance, BNI contracted with Atkins and the VSL to install and operate a suitable test system at VSL to collect the required data. That testing was designed to assess the performance of Kombisorb BAT-37 and the guard bed material, Sofnolime RG, for simulated melter exhaust streams that contain the highest concentrations of mercury, nitrogen oxides, acid gases, and organic compounds expected in WTP LAW melter exhaust. During shakedown testing with the new system, however, it became evident that a number of issues with Sofnolime RG as the guard bed material would render it unsuitable for this application. BNI subsequently determined that the guard bed was redundant for removal of acid gases since they could be adequately removed by the SBS and WESP. However, since the guard bed material was also credited with significant iodine removal , there was a need for a replacement material that would adequately perform that role. BNI identified several candidate media but performance data in gas compositions that are representative of the WTP LAW off-gas were not available. Accordingly, there was a need to test and evaluate the performance of these candidate media prior to performing the originally-planned tests. To that end, small scale tests were conducted to assess the performance of various adsorbents in simulated melter exhaust streams that contain mercury, iodine, nitrogen oxides, acid gases, and acetonitrile, which are expected to be present in WTP LAW melter exhaust.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Micromovements and discomfort associated with flight mission with helmet operation tasks with different levels of cognitive workload

When performing stationary tasks under elevated cognitive workload, individuals must perform continual muscle contractions to maintain stability of the body, resulting in fatigue of the postural muscles. When the muscles perform these contractions in a prolonged manner, the body potentially responds through small changes in body movements—micromovements that may lead to discomfort. The study purpose was to evaluate impact of cognitive load on micromovements. The micromovements were measured during three different cognitive workloads; low, medium, and high. The NASA-TLX score was used to evaluate the perceived mental workload and discomfort was assessed by visual analog scale. In total, 60 subjects (30 males and 30 females) were recruited and performed cognitive tasks that simulated flight operations such as changing the radio frequency based on air traffic control messages, balancing the fuel levels in simulated fuel tanks, and aiming a reticle in a designated moving target using the cyclic control. Cognitive load was defined by the frequency of events. Micromovements were defined by changes in the center of pressure (COP) of the seat pan and COP standard deviation. It was found that the high cognitive workloads had the highest NASA-TLX scores including mental demands, temporal demands, and effort. The neck area had the highest overall levels of discomfort followed by upper back. The highest standard deviation for COP shift and number of micromovements occurred for medium cognitive workloads. In conclusion, while there were some interesting trends, few trends reached a statistical significance due to high variability among subjects for the outcome variables.

60 APPLIED LIFE SCIENCES↗