Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload handling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A computer graphics pilot project - Spacecraft mission support with an interactive graphics workstation

The NASA Computer Graphics Pilot Project was undertaken to enhance the quality control, productivity and efficiency of mission support operations at the Goddard Operations Support Computing Facility. The Project evolved into a set of demonstration programs for graphics intensive simulated control room operations, particularly in connection with the complex space missions that began in the 1980s. Complex mission mean more data. Graphic displays are a means to reduce the probabilities of operator errors. Workstations were selected with 1024 x 768 pixel color displays controlled by a custom VLSI chip coupled to an MC68010 chip running UNIX within a shell that permits operations through the medium of mouse-accessed pulldown window menus. The distributed workstations run off a host NAS 8040 computer. Applications of the system for tracking spacecraft orbits and monitoring Shuttle payload handling illustrate the system capabilities, noting the built-in capabilities of shifting the point of view and rotating and zooming in on three-dimensional views of spacecraft.

Hagedorn, John↗

Active vibration damping of the Space Shuttle Remote Manipulator System

The feasibility of providing active damping augmentation of the Space Shuttle Remote Manipulator System (RMS) following normal payload-handling operations is investigated. The approach used in the analysis is described and the results from both linear and nonlinear performance analyses of candidate laws are presented, demonstrating that significant improvement in the RMS dynamic response can be achieved through active control using measured RMS tip acceleration data for feedback.

Scott, Michael A.↗

Active vibration damping of the Space Shuttle remote manipulator system

The feasibility of providing active damping augmentation of the Space Shuttle Remote Manipulator System (RMS) following normal payload handling operations is investigated. The approach used in the analysis is described, and the results for both linear and nonlinear performance analysis of candidate laws are presented, demonstrating that significant improvement in the RMS dynamic response can be achieved through active control using measured RMS tip acceleration data for feedback.

Scott, Michael A.↗

Operations and Range Technology Development

The Operations and Range Technology Project is responsible for the development of key technologies as part of the KSC Spaceport Technology Center Initiative to substantially reduce vehicle launch and processing operations costs and improve the systems safety and reliability. The topics include: 1) Spaceport Technology Areas; 2) Umbilical Systems Development; 3) Automated Payload Handling Systems; 4) Command, Control and Monitor Systems; 5) Intelligent Synthesis Environment; 6) Low TRL Development; 7) Second Generation Project Organization; and 8) ASTP (3rd Generation) Project Organization. This paper is presented in viewgraph form.

Taylor, Dave↗

Orbiter Processing Overview

Footage of orbiter processing is shown. The Space Shuttle Discovery Landing Operations, Rollback to Orbiter Processing Facility After Landing, Orbiter Processing Facility, Vehicle Assembly Building (VAB), Orbiter Rollover from the Orbiter Processing Facility to the VAB, Atlantis Orbiter Lift and Mate, Atlantis Rollout to Launch Pad 39, Payload Canister Door Opened and Payload Move into Payload Ground Handling Mechanism, Payload into Orbiter, Orbiter Payload Bay Door Closure, Launch Pad Processing at Launch Complex 39, Rotating Service Structure Rollback at Launch Pad, Discovery Lift-off and SRB separation is presented.

Source record↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

ISS Science Payload Command & Data Handling

For decades, the International Space Station (ISS) has provided a distinctive platform in low Earth orbit for experimental research. In support of this platform is a family of avionics systems that enables reliable data distribution of the many science payloads installed, and future internal and external payloads. This poster provides an update to the ISS avionics hardware system architecture, including design change successes, test bed architecture, and performance upgrades in the operation of all ISS avionics. We conclude with an outlook on future avionics system enhancements required to support additional modules and payload expansions taking place on the ISS, and how these avionics systems translate to a lunar gateway.

1553↗

Space Shuttle payloads and data handling accommodations

The Space Transportation System, which includes the Space Shuttle, will reduce the costs of earth orbital operations while improving operational capabilities and flexibility. The Shuttle can deliver payloads up to 65,000 pounds to a 150-nmi circular orbit at a substantially lower operational cost per flight than the Titan III-C system, which has a payload delivery capability of only 30,000 pounds. In addition, the Space Shuttle can return to earth with up to 32,000 pounds of payload, a capability not provided by expendable launch vehicles. Typical payload missions are considered along with aspects of satellite placement and recovery, typical free-flying payloads, attached scientific payloads, and the typical nature of payload data.

Teasdale, W. E.↗

Acceleration environment of payloads while being handled by the Shuttle Remote Manipulator System

Described in this paper is the method used in the Draper Remote Manipulator System (RMS) Simulation to compute linear accelerations at the point on the SPAS01 payload where its accelerometers are mounted. Simulated accelerometer output for representative on-orbit activities is presented. The objectives of post-flight analysis of SPAS01 data are discussed. Finally, the point is made that designers of acceleration-dependent payloads may have an interest in the capability of simulating the acceleration environment of payloads while under the control of the overall Payload Deployment and retrieval System (PDRS) that includes the Orbiter and its attitude control system as well as the Remote Manipulator Arm.

Turnbull, J. F.↗

Mechanical features of the shuttle rotating service structure

With the development of the space shuttle launching facilities, it became mandatory to develop a shuttle rotating service structure to provide for the insertion and/or removal of payloads at the launch pads. The rotating service structure is a welded tubular steel space frame 189 feet high, 65 feet wide, and weighing 2100 tons. At the pivot column the structure is supported on a 30 inch diameter hemispherical bearing. At the opposite terminus the structure is supported on two truck assemblies each having eight 36 inch diameter double flanged wheels. The following features of the rotating service structure are discussed: (1) thermal expansion and contraction; (2) hurricane tie downs; (3) payload changeout room; (4) payload ground handling mechanism; (5) payload and orbiter access platforms; and (6) orbiter cargo bay access.

Crump, J. M.↗

Systems definition summary. Earth Observatory Satellite system definition study (EOS)

A standard spacecraft bus for performing a variety of earth orbit missions in the late 1970's and 1980's is defined. Emphasis is placed on a low-cost, multimission capability, benefitting from the space shuttle system. The subjects considered are as follows: (1) performance requirements, (2) internal interfaces, (3) redundancy and reliability, (4) communications and data handling module design, (5) payload data handling, (6) application of the modular design to various missions, and (7) the verification concept.

Source record↗

A Protoflight Lightweight Surface Manipulation System to Enable High-Load, Long-Reach Lunar Surface Operations

There is a current critical need under the Artemis program for a versatile, high-load, long reach manipulation system that can provide payload offloading and handling for lunar landers. The Lightweight Surface Manipulation System (LSMS) is a highly structurally efficient, long-reach robotic arm that can be sized for a wide range of missions and payload ranges. The LSMS has more than a decade of heritage and testing at NASA Langley Research Center (LaRC), including laboratory and field testing of multiple end-effector tools and operational scenarios. With the need for rapid development of a flight-proven offloading capability and the desire to have that device be reusable for future missions and services, a 4-year program was initiated this year under NASA’s Space Technology Mission Directorate, to develop and build a protoflight unit of the LSMS, capable of lifting 1,000 kg on the Moon at an 8-meter reach. The target mission is to fly on a large cargo lander as a technology demonstrator to validate self-leveling, deployment, and payload handling operations, with future flights adding additional tools and capabilities. This paper provides a summary of the prior decade of work on the LSMS, the current mission drivers and goals, and details the first year of development of the LSMS toward a protoflight unit.

LSMS↗

A Protoflight Lightweight Surface Manipulation System to Enable High-Load, Long-Reach Lunar Surface Operations

There is a current critical need under the Artemis program for a versatile, high-load, long reach manipulation system that can provide payload offloading and handling for lunar landers. The Lightweight Surface Manipulation System (LSMS) is a highly structurally efficient, long-reach robotic arm that can be sized for a wide range of missions and payload ranges. The LSMS has more than a decade of heritage and testing at NASA Langley Research Center (LaRC), including laboratory and field testing of multiple end-effector tools and operational scenarios. With the need for rapid development of a flight-proven offloading capability and the desire to have that device be reusable for future missions and services, a 4-year program was initiated this year under NASA’s Space Technology Mission Directorate, to develop and build a protoflight unit of the LSMS, capable of lifting 1,000 kg on the Moon at an 8-meter reach. The target mission is to fly on a large cargo lander as a technology demonstrator to validate self-leveling, deployment, and payload handling operations, with future flights adding additional tools and capabilities. This paper provides a summary of the prior decade of work on the LSMS, the current mission drivers and goals, and details the first year of development of the LSMS toward a protoflight unit.

lunar surface↗

STS-96: SPACEHAB Double MOD into PGHM at Launch Complex 39B

This NASA Kennedy Space Center (KSC) video release presents the SPACEHAB double module moving into the Payload Ground Handling Mechanism (PGHM) which is located in the Payload Change-out Room of Launch Complex 39B at the Kennedy Space Center. PGHM is used to remove or insert the shuttle payload from the Orbiter.

Source record↗

LSMS–L35, Miniature Crane for Payload Offloading and Manipulation: Development, and Application

The Lightweight Surface Manipulation System (LSMS) is a robotic agent for autonomous surface construction activities on planetary surfaces, that was designed at NASA Langley Research Center and has over a decade of research and development. The LSMS is a key component to achieving many goals of the NASA Artemis program. The LSMS is lightweight, structurally efficient system that can be easily packaged for launch and deployment on-surface, capable of a suite of surface activities enabled by modular end-effectors at the wrist. The focus of recent development work has been on using the LSMS for payload offloading and handling from lunar landers. Discussed in the paper is the development of the LSMS-L35 hardware (35 kg wrist lifting capacity on the lunar surface), designed to integrate with a Commercial Lunar Payload Services (CLPS) lander to offload payloads to the surface. The LSMS-L35 hardware development is part of a larger effort to enable autonomous payload handling and manipulation.

Iok M. Wong↗

Nonlinear robust controller design for multi-robot systems with unknown payloads

This work is concerned with the control problem of a multi-robot system handling a payload with unknown mass properties. Force constraints at the grasp points are considered. Robust control schemes are proposed that cope with the model uncertainty and achieve asymptotic path tracking. To deal with the force constraints, a strategy for optimally sharing the task is suggested. This strategy basically consists of two steps. The first detects the robots that need help and the second arranges that help. It is shown that the overall system is not only robust to uncertain payload parameters, but also satisfies the force constraints.

Song, Y. D.↗