Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

STS-60 Space Shuttle mission report

The STS-60 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixtieth flight of the Space Shuttle Program and eighteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Orbiter, the flight vehicle consisted of an ET designated at ET-61 (Block 10); three SSME's which were designated as serial numbers 2012, 2034, and 2032 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-062. The RSRM's that were installed in each SRB were designated as 360L035A (lightweight) for the left SRB, and 360Q035B (quarterweight) for the right SRB. This STS-60 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume VIII, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objectives of the STS-60 mission were to deploy and retrieve the Wake Shield Facility-1 (WSF-1), and to activate the Spacehab-2 payload and perform on-orbit experiments. Secondary objectives of this flight were to activate and command the Capillary Pumped Loop/Orbital Debris Radar Calibration Spheres/Breman Satellite Experiment/Getaway Special (GAS) Bridge Assembly (CAPL/ODERACS/BREMSAT/GBA) payload, the Auroral Photography Experiment-B (APE-B), and the Shuttle Amateur Radio Experiment-II (SAREX-II).

Fricke, Robert W., Jr.↗

Starfire 1 Consort III Launch

The Consort 3 is a commercial suborbital rocket that carried 12 microgravity experiments. It was launched on a Starfire rocket on May 16, 1990, from the Naval Ordnance Missile Test Station facilities at the U.S. Army's White Sands Missile Range (WSMR), NM. The videotape opens with approximately 2 minutes of a man speaking into a microphone but there is no sound. This is followed by a brief summary of the payload, and the expected trajectory, a view of the launch vehicle, the countdown and the launch. The videotape then shows a film clip from the University of Alabama, with Dr. Francis Wessling, project manager for the Consort 3 project, speaking about the mission goals in the materials sciences experimentation. The video shows footage of the payload being assembled. The next section is a discussion by Dr. Roy Hammustedt, of Pennsylvania State University, who reviews the Penn State Bio Module,and the goal of learning about the effects of gravity on physiology. This is followed by George Maybee, from McDonald Douglas, who spoke about the payload integration process while the video shows some of the construction. The last section of the videotape shows a press conference at the launch site. Ana Villamil answers questions from the press about the flight.

Source record↗

Attitude sensor package

This paper describes the design, construction, testing, and successful flight of the Attitude Sensor Package. The payload was assembled on a standard HITCHHIKER experiment mounting plate, and made extensive use of the carrier's power and data handling capabilities. The side mounted HITCHHIKER version was chosen, since this configuration provided the best viewing conditions for the instruments. The combustion was successfully flown on board Space Shuttle Columbia (STS-52), in October 1992. The payload was one of the 14 experiments of the In-Orbit Technology Demonstration Program (Phase 1) of the European Space Agency.

Aceti, R.↗

Shuttle payload processing at KSC

Two basic systems of Shuttle payload and checkout are discussed. The first system is called 'off-line' checkout and checks out payloads or payload segments after they are brought to the launch complex laboratories, as individual units and transfer them to an integration facility where they are assembled into a total Shuttle payload. In this scheme all payload assembly and checkout is performed away from the Orbiter. Any problems concerning the payloads will allow rescheduling another payload for flight and therefore not subjecting the Orbiter to delays in its recycling flow. The second payload processing scheme is the 'on-line' checkout which employs a 'factory to pad' concept. Payloads are delivered directly to the pad, placed in the Payload Changeout Room where they are checked out and integrated and, after completion of servicing, are installed vertically into the Orbiter. A combination of off-line and on-line processing will be used to meet all flight requirements.

Phillips, J. D.↗

Genesis Solar Wind Sample Curation Documentation

Introduction: A scientist with experience as a sample science analyst, provider of flight hardware for multiple missions, and senior engineer in an ISO 2000-rated manufacturing plant has described the timeline of key participants in any PI-led sample return mission, the breadth of the organizations involved [1,2], and, of interest to this meeting, choosing the types of data to preserve and issues of future data accessibility. This work broadens that perspective by giving similar lessons from Genesis sample curation point-of-view. Curation participation regarding data gathering was part of the mission review process from the beginning. Genesis’ story illustrates outcome of several choices about types of data to record and preserve. Precision analysis of solar wind atoms captured in pure, ultraclean substrates is the driving science goal; therefore, detailed documentation was captured from all mission and curation phases and from investigator laboratories because these processes affect the final analytical results [3]. Pre-flight: Design and fabrication of the spacecraft. Like many modern small sample return missions, Genesis was a tightly managed team integrated across science, engineering and curation. Communication across the team was excellent, and, for the most part, the hands-on engineering technicians understood the impacts of “small choices” they routinely make, and the eyes-on oversight of manufacturing processes by scientists was mindful of details. The payload was designed by the Jet Propulsion Laboratory and the spacecraft by Lockheed Martin. Solar wind collectors and instruments were fabricated by multiple vendors and laboratories. The main portion of the payload was assembled at JSC. Fabrication procedures and contamination-control data (with witness coupons) were stored primarily at JSC. The original composition, dimensions and configuration of components, results of thermal testing, etc. are still needed for interpretation of analytical data. At times, these must be estimated from secondary information acquired pre-flight. Moreover, some files (e.g., original 3-D models and early Powerpoint) cannot be opened using software. Archived curation data includes 2-D drawings, material usage lists, QA documentation and analyses of consumables used during fabrication. Important chemical information still resides in archived hardware, paints and lubricants, material coupons, cleaning coupons, environmental witness plates and reference materials from manufacturing facilities. Purity and cleanliness of collector substrates. Semi-conductor vendors provided surface cleanliness data and some purity data. Purity for specific elements of interest was verified by science team members in their laboratories [4]. Curation archived procurement and shipping records, analysis reports, and non-proprietary fabrication data. A physical archive of flight collector reference materials is maintained for future use so additional data can be collected as analytical techniques improve. These are of increased value due to the hard landing upon re-entry. Cleaning and cleanliness assessments of flight hardware. Cleaning of the science canister payload was performed at JSC in a dedicated ISO 4 cleanroom using ultrapure water (UPW). The cleanliness of this UPW was monitored throughout processing. The archive for the clean lab also includes airborne particle counts, airborne molecular and inorganic contamination measurements as well as cleanroom construction material coupons and witness coupons. Hardware cleanliness was assessed by particle counts in rinse water batches. This information is recorded in batch cleaning forms and logbooks, and are, perhaps, of decreased value due to the hard landing. Post-flight: Curation-generated data. The curation handling history of each Genesis sample is documented in a typical astromaterials sample database which captures sample location, physical description and characterization data. Samples have a “shelf life”. Crucial to the preservation of samples is ongoing documentation of the sample environment, initially under curatorial control but is now a separate facility function with requires coordination. PI-generated data. Data on sample characterization and cleaning techniques continues to be generated by sample users [5]. These are often captured in LPSC abstracts, but these “engineering” results often are not publishable as stand-alone papers. We are actively looking for ways to make this information more accessible to users. Ion implants into samples have aided science return and can be shared among investigators. These (and similar) materials should be added to the curatorial collection with appropriate process and characterization data generated externally. Summary: Complete data archives for returned astromaterial samples must be broad in types and formats, and inclusive of environmental monitoring.

Genesis↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Traffic model for commercial payloads in the Materials Experiment Assembly (MEA)

One hundred individuals representing universities, technical institutes, government agencies, and industrial facilities were surveyed to determine potential commercial use of a self-contained, automated assembly for the space processing of materials during frequent shuttle flights for the 1981 to 1987 period. The approach used and the results of the study are summarized. A time time-phased projection (traffic model) of commercial usage of the materials experiment assembly is provided.

Tietzel, F. A.↗

Development of deployable structures for large space platform systems. Volume 1: Executive summary

Candidate deployable linear platform system concepts suitable for development to technology readiness by 1986 are reviewed. The systems concepts were based on trades of alternate deployable/retractable structure concepts, integration of utilities, and interface approaches for docking and assembly of payloads and subsystems. The deployable volume studies involved generation of concepts for deployable volumes which could be used as unpressurized or pressurized hangars, habitats and interconnecting tunnels. Concept generation emphasized using flexible materials and deployable truss structure technology.

Cox, R. L.↗

The design, fabrication and delivery of a spacelab neutral buoyancy Instrument Pointing System (IPS) mockup

Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.

Vanvalkenburgh, C. N.↗

Explorer Platform on-orbit servicing operations

Explorer Platform development and capabilities are outlined. The Explorer Platform extends the user provisions of the Multimission Modular Spacecraft to include power generation and distribution and on-orbit exchange of payload modules. The platform can be integrated with its payload and launched on an expendable launch vehicle or it can be carried separately from its payload on the Space Shuttle and assembled with its payload on-orbit. Later Shuttle flights can revisit the Platform to perform servicing or payload exchange. This capability to support several payloads in succession allows costs to be shared by several users over the 10 yr life of the platform.

Moe, Rud V.↗

Telepresence and Space Station Freedom workstation operations

The Space Station Freedom workstation system is a distributed network of computer based workstations that provides the man-machine interfaces for controlling space station systems. This includes control of external manipulator, robotic and free flyer devices by crewmembers in the space station's pressurized shirt-sleeve environment. These remotely controlled devices help minimize the requirement for costly crew extravehicular activity (EVA) time for such tasks as station assembly and payload support. Direct window views may be used for controlling some of the systems, but many activities will be remote or require levels of detail not possible by direct observation. Since controlling remote devices becomes more difficult when direct views are inadequate or unavailable, many performance enhancing techniques have been considered for representing information about remote activities to the operator. Described here are the telepresence techniques under consideration to support operations and training. This includes video enhancements (e.g., graphic and text overlays and stereo viewing), machine vision systems, remote activity animation, and force reflection representation.

Jensen, Dean G.↗

Split spline screw

A split spline screw type payload fastener assembly, including three identical male and female type split spline sections, is discussed. The male spline sections are formed on the head of a male type spline driver. Each of the split male type spline sections has an outwardly projecting load baring segment including a convex upper surface which is adapted to engage a complementary concave surface of a female spline receptor in the form of a hollow bolt head. Additionally, the male spline section also includes a horizontal spline releasing segment and a spline tightening segment below each load bearing segment. The spline tightening segment consists of a vertical web of constant thickness. The web has at least one flat vertical wall surface which is designed to contact a generally flat vertically extending wall surface tab of the bolt head. Mutual interlocking and unlocking of the male and female splines results upon clockwise and counter clockwise turning of the driver element.

John M Vranish↗

MSFC MXER Tether Study

This viewgraph presentation provides an overview of the proposed Momentum-eXchange/Electrodynamic Reboost (MXER) space hardware system. The tether system would be position cart-wheeling cables above the Earth and then, rotating like a giant sling, would capture spacecraft or payloads from space shuttles in low Earth orbits and launch them into higher orbits. This study focuses on system validation and structural design issues for MXER. Topics examined include: tether facility design, ED tether system, payload capture/catch mechanism, payload accomodations assembly (PAA), PAA rendezvous capability, and PAA capability to correct tether misthrows.

Polsgrove, Tara↗

Update on the Wide-field Infrared Survey Explorer (WISE)

The Wide-field Infrared Survey Explorer (WISE), a NASA MIDEX mission, will survey the entire sky in four bands from 3.3 to 23 microns with a sensitivity 1000 times greater than the IRAS survey. The WISE survey will extend the Two Micron All Sky Survey into the thermal infrared and will provide an important catalog for the James Webb Space Telescope. Using 1024(sup 2) HgCdTe and Si:As arrays at 3.3, 4.7, 12 and 23 microns, WISE will find the most luminous galaxies in the universe, the closest stars to the Sun, and it will detect most of the main belt asteroids larger than 3 km. The single WISE instrument consists of a 40 cm diamond-turned aluminum afocal telescope, a two-stage solid hydrogen cryostat, a scan mirror mechanism, and reimaging optics giving 5 resolution (full-width-half-maximum). The use of dichroics and beamsplitters allows four color images of a 47' x47' field of view to be taken every 8.8 seconds, synchronized with the orbital motion to provide total sky coverage with overlap between revolutions. WISE will be placed into a Sun-synchronous polar orbit on a Delta 7320-10 launch vehicle. The WISE survey approach is simple and efficient. The three-axis-stabilized spacecraft rotates at a constant rate while the scan mirror freezes the telescope line of sight during each exposure. WISE has completed its mission Preliminary Design Review and its NASA Confirmation Review, and the project is awaiting confirmation from NASA to proceed to the Critical Design phase. Much of the payload hardware is now complete, and assembly of the payload will occur over the next year. WISE is scheduled to launch in late 2009; the project web site can be found at www.wise.ssl.berkeley.edu.

aster↗

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

Robotic-Movement Payload Lifter and Manipulator

A payload lifter/manipulator module includes a rotatable joint supporting spreader arms angularly spaced with respect to one another. A rigid arm is fixedly coupled to the joint and extends out therefrom to a tip. A tension arm has a first end and a second end with the first end being fixedly coupled to the tip of the rigid arm. The tension arm incorporates pivots along the length thereof. Each pivot can be engaged by or disengaged from the outboard end of a spreader arm based on a position of the spreader arm. A hoist, positioned remotely with respect to the module and coupled to the second end of the tension arm, controls the position of the spreader arms to thereby control the position of the rigid arm's tip. Payload lifter/manipulator assemblies can be constructed with one or more of the modules.

Doggett, William R.↗

Space Station and Shuttle Payloads: Rack Insertion Device Pneumatic Assembly Setup and Test

As part of my KSC summer internship, I was given the very cool task of writing a test preparation sheet (TPS). A TPS is a set of instructions for certain procedures or tasks, and serves as the documentation for the tasks. TPSs guide task leaders and technicians throughout the work procedures, safely, informing them of what steps will be hazardous, what precautions must be taken, and what to do in the case of an accident or emergency. I was placed in Boeing's Resupply & Return Division (R&R). R&R is responsible for sending up food and supplies to the International Space Station (ISS) with the use of three Italian Multi Purpose Logistics Modules - Leonardo, Donatello, and Raffaello. The supplies are loaded into Resupply Stowage Racks (RSRs) or Resupply Stowage Platforms (RSPs) (though, both are usually referred to as racks), depending on their size and shape. These racks are loaded into the modules with the help of a specialized crane known as the Rack Insertion Device (RID). The RID rests on four pneumatic air jacks, these allow for an operator to raise or lower the RID. The pneumatic air system supplies the air jacks with the necessary air pressure required to lift the RID.

Conde, Nathan↗

GSFC Risk Assessment Process for Inherited Items

The NASA Goddard Space Flight Center Safety and Mission Assurance Directorate is implementing an alternate process for approval of Spacecraft Inherited Items in accordance with Goddard Procedural Requirements 8730.5. A Commodity Risk Assessment Engineer is performing an Inherited Item Risk Assessment (I2RA) for the use of Spacecraft Standard Components (items generally necessary to control the spacecraft, e.g. reaction wheel assemblies) and payload flight spares or Built-to-Print items. The I2RA may take into account prior space flight performance, criticality of the component, qualification records, quality and reliability records, storage conditions, manufacturer assessments, and mission specific parameters like mission environment and duration. The I2RA provides a means to accept for the entire item materials, parts or workmanship non-conformances, that do not significantly increase risk.

Risk Assessment↗