Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Nozzle performance calibration and turbomachinery operational analysis of Turbo-Powered Simulators (TPS) for the NASA-Langley EET propulsion airframe integration investigation

The Boeing flight simulator chamber facility energy efficient transport (EET) propulsion/airframe integration investigation was tested. Two turbopowered simulators (TPS) were calibrated with four different nacelle configurations. Two nacelle configurations were calibrated on each TPS, each calibration simulating the full nozzle pressure ratio range encountered in a one atmosphere total pressure wind tunnel operating over a Mach number range from 0.70 to 0.90 Mach. The results of the calibration test are in the form of velocity and discharge coefficient which is used in determining the simulator thrust while the TPS is operating in the wind tunnel.

Rowe, R. K.↗

Reference Mission Operational Analysis Document (RMOAD) for the Life Sciences Research Facilities

The space station will be constructed during the next decade as an orbiting, low-gravity, permanent facility. The facility will provide a multitude of research opportunities for many different users. The pressurized research laboratory will allow life scientists to study the effects of long-term exposure to microgravity on humans, animals, and plants. The results of these studies will increase our understanding of this foreign environment on basic life processes and ensure the safety of man's long-term presence in space. This document establishes initial operational requirements for the use of the Life Sciences Research Facility (LSRF) during its construction.

Source record↗

Operations Analysis of Space Shuttle System

The space science program at NASA since 1950's has gone through stages of development and implementation in rocketry and scientific advancement. It has become the nation's largest scientific institution of research and innovation for space exploration and military research, and overall a pride of the nation at an exorbitant cost. After placing man on moon, space shuttle program at NASA is an on-going project with a high success rate at an average cost of about $450m per flight. A future endeavor from both government and private sectors needs to be undertaken for commercialization of this expensive mission. In order to attract private enterprises, it needs to boost up its operations with better technology at lower cost to cope with rapid changes in scientific advancement and economic competition. Thus, a second-generation reusable launch vehicle (2GRLV) will play a major role in future operation of NASA centers. Envisioning this potential way of saving the program by reducing the cost, NASA is currently managing an innovative program called the Space Launch Initiative (SLI) to develop key technologies that will support the development of second-generation reusable launch vehicles (RLV) which will be more economical and safer and reliable than the existing space shuttle system. The selection of which technologies to fund for further development is being based on their likelihood to contribute to providing cost reduction or safety improvements. It is envisioned that in the 2006 timeframe, NASA will make a decision as to whether or not to commit to the replacement of the current space shuttle system with a new RLV. The decision to proceed with a new RLV will be partly based on the likelihood that the new system will be better than the existing space shuttle. Government and private entrepreneurs are currently considering four different types of RLV projects: commercial programs, government programs, international concepts, and X Prize competitors. NASA has already commissioned a series of X-programs to study the future RLV program. Today, NASA decision makers need analytical tools to help determine which technologies to fund the development of this technology. In the 2006 timeframe, these same decision makers will need analytical tools to evaluate and compare various RLV architectures, including the existing space shuttle so as to make the best decision for whether or not to proceed with the development of a new RLV, and if so, then which one. A study is conducted here to establish ground level knowledge from the historical data and expertise experiences of the field personnel. Such information is compiled in the form of mission statement, goals, space shuttle operations, payloads and cargo constraints, resource constraints, and bottlenecks to the enhancement vector.

Bhaba R. Sarker↗

Operations analysis (study 2.1): Program manual and users guide for the LOVES computer code

Information is provided necessary to use the LOVES Computer Program in its existing state, or to modify the program to include studies not properly handled by the basic model. The Users Guide defines the basic elements assembled together to form the model for servicing satellites in orbit. As the program is a simulation, the method of attack is to disassemble the problem into a sequence of events, each occurring instantaneously and each creating one or more other events in the future. The main driving force of the simulation is the deterministic launch schedule of satellites and the subsequent failure of the various modules which make up the satellites. The LOVES Computer Program uses a random number generator to simulate the failure of module elements and therefore operates over a long span of time typically 10 to 15 years. The sequence of events is varied by making several runs in succession with different random numbers resulting in a Monte Carlo technique to determine statistical parameters of minimum value, average value, and maximum value.

Wray, S. T., Jr.↗

CAIDA CUI Confirmation for OMRS & LCC SOCRRATES Emulator and iSEE Upgrade, Operations, & Analysis

This internship has focused on providing solutions for the Customer Avionics Interface Development and Analysis (CAIDA) subsystem. The main emulator that has been used during this internship is the Software-Only CEV (Crew Exploration Vehicle) Risk Reduction Analysis and Test Engineering Simulator (SOCRRATES). This emulator uses advanced math and physics methods to simulate specific points in a mission, such as ascent, entry, and orbit. Exploration Ground Systems (EGS) must ensure that all KSC based ground systems can be properly integrated with the flight vehicle software, therefore, the Modeling and Simulation Branch (NE-XM) of the KSC (Kennedy Space Center) Engineering Directorate supports a virtual environment that simulates the interface between ground systems and the flight vehicle. A primary component in assuring that is knowing whether the emulators have incorporated the correct CUIs (Compact Unique Identifiers) into their system, as well as understanding both the static and dynamic responses of the individual CUIs. Also, an effort for verification of Operational Maintenance Requirements Specifications (OMRS) and Launch Commit Criteria (LCC) that are supported by SOCRRATES for the Orion Crew Module were part of the project tasks this semester. This internship also focused on comparing two different simulation Commercial-off-the-shelf (COTS) products and to determine whether or not a COTS package was a viable replacement for the current software that the iSEE (Immersive Simulations and Engineering Environment) lab uses. Upon research and testing, I found that this software was not feasible for the lab. It could not easily load CAD (Computer-Aided Design) or CREO models, give live feedback while the user is in the environment, and was not compatible with a virtual reality headset, all of which are necessary for the lab.

Bundy, Caleb↗

Fucino Earth Station Operation analysis

Telstar I was employed in communication experiments from the pass 1627, January 4th 1963y, when the satellite ceased functioning for communication. During this period 23 experiments were preformed, about half of which were of wideband type.

COMMUNICATIONS SATELLITE↗

Operations analysis, study 2.6. Volume 2: Analysis results

Results are presented of the assessment of the space transportation system as it applies to future space program planning. Comparisons are given between space servicing and ground refurbishment of payloads. Mission characterization, logistic vehicle options, and payload design options are also discussed.

Wolfe, R. R.↗

Radio astronomy Explorer-B postlaunch attitude operations analysis

The attitude support activities of the Radio Astronomy Explorer-B are reported. The performance of the spacecraft hardware and software are discussed along with details of the mission events, from launch through main boom deployment. Reproductions of displays are presented which were used during support activities. The interactive graphics proved the support function by providing the quality control necessary to ensure mission success in an environment where flight simulated ground testing of spacecraft hardware cannot be performed.

Werking, R. D.↗

Operations analysis (study 2.1). Program SEPSIM (solar electric propulsion stage simulation)

Program SEPSIM is a FORTRAN program which performs deployment, servicing, and retrieval missions to synchronous equatorial orbit using a space tug with a continuous low thrust upper stage known as a solar electric propulsion stage (SEPS). The SEPS ferries payloads back and forth between an intermediate orbit and synchronous orbit, and performs the necessary servicing maneuvers in synchronous orbit. The tug carries payloads between the orbiter and the intermediate orbit, deploys fully fueled SEPS vehicles, and retrieves exhausted SEPS vehicles when, and if, required. The program is presently contained in subroutine form in the Logistical On-orbit VEhicle Servicing (LOVES) Program, but can also be run independently with the addition of a simple driver program.

Lang, T. J.↗

Operations analysis (study 2.1). Payload designs for space servicing, addendum

Space replaceable units and payload configurations are revised to reflect increased levels of redundancy to be more consistent with current design practices. A reassessment of expendable payload design reliabilities was performed to provide a common basis for comparison with space serviceable configurations.

Wolfe, R. R.↗

Operations analysis (study 2.1). Program listing for the LOVES computer code

A listing of the LOVES computer program is presented. The program is coded partially in SIMSCRIPT and FORTRAN. This version of LOVES is compatible with both the CDC 7600 and the UNIVAC 1108 computers. The code has been compiled, loaded, and executed successfully on the EXEC 8 system for the UNIVAC 1108.

Wray, S. T., Jr.↗

On orthogonal expansions of the space of vector functions which are square-summable over a given domain and the vector analysis operators

The Hilbert space L2(omega) of vector functions is studied. A breakdown of L2(omega) into orthogonal subspaces is discussed and the properties of the operators for projection onto these subspaces are investigated from the standpoint of preserving the differential properties of the vectors being projected. Finally, the properties of the operators are examined.

Bykhovskiy, E. B.↗

Turnaround operations analysis for OTV. Volume 1: Executive summary

Anaylses performed for ground processing, both expendable and reusable ground-based Orbital Transfer Vehicles (OTVs) launched on the Space Transportation System (STS), a reusable space-based OTV (SBOTV) launched on the STS, and a reusable ground-based OTV (GBOTV) launched on an unmanned cargo vehicle and recovered by the Orbiter are summarized. Also summarized are the analyses performed for space processing the reusable SBOTV at the Space Station in low Earth orbit (LEO) as well as the maintenance and servicing of the SBOTV accommodations at the Space Station. In addition, the candidate OTV concepts, design and interface requirements, and the Space Station design, support, and interface requirements are summarized. A development schedule and associated costs for the required SBOTV accommodations at the Space Station are presented. Finallly, the technology development plan to develop the capability to process both GBOTVs and SBOTVs are summarized.

Source record↗

Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

Source record↗