Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Deploying E3’s RESERVE Tool to Enable Advanced Operation of Clean Grids

Energy and Environmental Economics, Inc. (E3) developed an open-source machine learning model, RESERVE, for deriving ancillary services timeseries in deeply decarbonized electricity grids. E3 used a bespoke PLEXOS production simulation model of the California Independent System Operator’s (CAISO) balancing area to validate RESERVE’s ability to enable production cost, greenhouse gas emissions (GHG), and renewable energy curtailment savings. These savings were modeled by comparing PLEXOS cases with RESERVE’s outputs to PLEXOS cases with CAISO’s incumbent reserve product in the Western Energy Imbalance Market (EIM)’s 15-minute market. E3 also tested cases with solar operating flexibly to provide reserves. E3 found that, in a 2030 modeling year, using RESERVE and flexible solar enabled significant production cost, GHG and curtailment savings versus the incumbent CAISO method in cases with low penetrations of lithium-ion batteries. However, with the full 14 gigawatts (about 30% of peak CAISO demand) of 4-hour lithium-ion batteries that are expected to be installed by 2030, these savings approach zero due to batteries saturating ancillary services markets. E3 also found significant savings under a 2019 benchmarking year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning and Operations in Electricity Markets Under System Tansformation: Key Findings

This report summarizes a set of key findings that have been developed through a set of interconnected research activities performed by five institutions between January 2020 and December 2023. The project team, comprising Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University, collective engaged with the North American Independent System Operators and Regional Transmission Operators (ISO/RTOs) to identify the key challenges they are facing and opportunities for the project team to provide technical assistance in several prioritized challenge areas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supporting Resource Adequacy via the ReEDS-India Model [Slides]

ReEDS-India is an open-access tool for mid- and long-term capacity expansion modeling that finds the mix of generation, transmission, and storage technologies that meet the anticipated requirements of the electric sector at least cost.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mini-STEP: A Minimal Satellite Test of the Equivalence Principle Experiment

The Mini-STEP concept was conceived from a desire by NASA to reduce the cost of the Satellite Test of the Equivalence Principle (STEP) experiment below that of the already downsized Quick STEP concept. The goal was for the total cost, including payload, spacecraft, launch vehicle, reserves and operations to be in the $50 million range.

STEP mini-step quick-step equivalence principle↗

LCROSS Lunar Impactor - Lessons Learned from a Small Satellite Mission

The Lunar CRater Observation and Sensing Satellite (LCROSS) launched with the Lunar Reconnaissance Orbiter (LRO) on June 18, 2009. While the science function of the LCROSS mission was to determine the presence of water-ice in a permanently-shadowed crater on the moon, the operational purpose was to be a pioneer for future low-cost, risk-tolerant small satellite NASA missions. Recent strategic changes at the Agency level have only furthered the importance of small satellite missions. NASA Ames Research Center and its industry partner, Northrop-Grumman, initiated this spacecraft project two-years after its co-manifest mission had started, with less than one-fifth the budget. With a $79M total cost cap (including operations and reserves) and 31-months until launch, LCROSS needed a game-changing approach to be successful. At the LCROSS Confirmation Review, the ESMD Associate Administrator asked the Project team to keep a close record of lessons learned through the course of the mission and share their findings with the Agency at the end of the mission. This paper summarizes the Project, the mission, its risk position, and some of the more notable lessons learned.

Andrews, Daniel R.↗

Lcross Lunar Impactor - Lessons Learned from a Small Satellite Mission

The Lunar CRater Observation and Sensing Satellite (LCROSS) launched with the Lunar Reconnaissance Orbiter (LRO) on June 18, 2009. While the science purpose of the LCROSS mission was to determine the presence of water-ice in a permanently-shadowed crater on the moon, the functional purpose was to be a pioneer for future low-cost, risk-tolerant small satellite NASA missions. Recent strategic changes at the Agency level have only furthered the importance of small satellite missions. NASA Ames Research Center and its industry partner, Northrop-Grumman, initiated this spacecraft project two-years after its co-manifest mission had started, with less than one-fifth the budget. With a $79M total cost cap (including operations and reserves) and 31-months until launch, LCROSS needed a game-changing approach to be successful. At the LCROSS Confirmation Review, the ESMD Associate Administrator asked the Project team to keep a close record of lessons learned through the course of the mission and share their findings with the Agency at the end of the mission. This paper summarizes the Project, the mission, its risk position, and some of the more notable lessons learned.

Andrews, Daniel↗

Storage Futures Study: Four Phases Framework and Modeling

This webinar, presented by Paul Denholm and Will Frazier, incorporates material from two publications of the NREL Storage Futures Study: "The Four Phases of Storage Deployment: A Framework for the Expanding Role of Storage in the U.S. Power System" (https://www.nrel.gov/docs/fy21osti/77480.pdf) and "Storage Futures Study: Economic Potential of Diurnal Storage in the U.S. Power Sector" (https://www.nrel.gov/docs/fy21osti/77449.pdf).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Geothermal Reserve Pits: Considerations for Installation on BLM-Administered Lands

Reserve pits, also known as sumps, are a common aspect of geothermal drilling operations. This paper describes the Bureau of Land Management's regulatory authorities and key environmental considerations associated with geothermal reserve pits. Reserve pit design, the need for environmental compliance measures, and reclamation approaches will vary depending on site-specific conditions. Groundwater and wildlife impacts are the most common environmental considerations related to reserve pits. In some cases, regulations or groundwater or soil conditions necessitate the use of a synthetic liner. However, the chemical composition of most geothermal drilling fluids and muds, completion fluids, and produced fluids that are discharged to reserve pits does not warrant pit liners. The potential for hazardous fluids, high water temperatures, and entrapment are concerns for wildlife. Common wildlife impact avoidance and mitigation measures include fencing, netting, and escape ramps. The need for these measures depends on localized site and environmental conditions. There are requirements to reclaim reserve pits following geothermal drilling operations. Reserve pits often remain in place to accommodate multiple phases of drilling and well testing. They are eventually backfilled and decommissioned.

BLM↗

Multi-timescale operations of nuclear-renewable hybrid energy systems for reserve and thermal product provision

In this paper, an optimal operation strategy of a nuclear-renewable hybrid energy system (N-R HES), in conjunction with a district heating network, is developed within a comprehensive multi-timescale electricity market framework. The grid-connected N-R HES is simulated to explore the capabilities and benefits of N-R HES of providing energy products, different reserve products, and thermal products. An N-R HES optimization and control strategy is formulated to exploit the benefits from the hybrid energy system in terms of both energy and ancillary services. A case study is performed on the customized NREL-118 bus test system with high renewable penetrations, based on a multi-timescale (i.e., three-cycle) production cost model. Both day-ahead and real-time market clearing prices are determined from the market model simulation. In conclusion, the results show that the N-R HES can contribute to the reserve requirements and also meet the thermal load, thereby increasing the economic efficiency of N-R HES (with increased revenue ranging from 1.55% to 35.25% at certain cases) compared to the baseline case where reserve and thermal power exports are not optimized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Team X Report #1401: Exoplanet Coronagraph STDT Study 2013-06

This document is intended to stimulate discussion of the topic described. All technical and cost analyses are preliminary. This document is not a commitment to work, but is a precursor to a formal proposal if it generates sufficient mutual interest. The data contained in this document may not be modified in any way. Cost estimates described or summarized in this document were generated as part of a preliminary, first-order cost class identification as part of an early trade space study, are based on JPL-internal parametric cost modeling, assume a JPL in-house build, and do not constitute a commitment on the part of JPL or Caltech. JPL and Team X add cost reserves for development and operations. Unadjusted estimate totals and cost reserve allocations would be revised as needed in future more-detailed studies as appropriate for the specific cost-risks for a given mission concept.

cost estimating↗

Scheduler Modeling of IBR Plants for Providing Ancillary Services [SWR-25-16]

Inverter-based resources (IBRs) have been integral components of modern power systems and their capability in providing grid services have been widely studied. To promote the deployment of IBR grid services in real utility operation, this software proposes a scheduler model for IBRs. The energy and reserve are co-optimized in day-ahead, various ancillary services, including operating reserve provision, peak load reduction, voltage regulation and power factor control are integrated in the model.

Wang, Xiaofei [National Renewable Energy Laborator↗

A Deep Reinforcement Learning-based Reserve Optimization in Active Distribution Systems for Tertiary Frequency Regulation

Federal Energy Regulatory Commission (FERC)Orders 841 and 2222 have recommended that distributed energy resources (DERs) should participate in energy and reserve markets; therefore, a mechanism needs to be developed to facilitate DERs’ participation at the distribution level. Although the available reserve from a single distribution system may not be sufficient for tertiary frequency regulation, stacked and coordinated contributions from several distribution systems can enable them participate in tertiary frequency regulation at scale. This paper proposes a deep reinforcement learning (DRL)-based approach for optimization of requested aggregated reserves by system operators among the clusters of DERs. The co-optimization of cost of reserve, distribution network loss, and voltage regulation of the feeders are considered while optimizing the reserves among participating DERs. The proposed framework adopts deep deterministic policy gradient (DDPG), which is an algorithm based on an actor-critic method. The effectiveness of the proposed method for allocating reserves among DERs is demonstrated through case studies on a modified IEEE 34-node distribution system.

deep reinforcement learning, distributed energy re↗

Igor

SAND2023-05551O Igor, an open-source software, manages large clusters of users in a high-performance computing community. The systems allows users to choose an operating system and reserve and request hosts. The administrative side sets up and executes requests from users while simultaneously giving them tools to manage and enforce reservation policies and user access to the hosts. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Bagwell, Allen↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Providing Ancillary Services with Photovoltaic Generation in Multi- Timescale Grid Operation

With penetration levels of photovoltaic (PV) generation substantially increasing, electric power systems need more flexible resources that can provide ancillary services to mitigate the variability and uncertainty of the PV. On one hand, the increase in PV generation necessitates more flexible resources; on the other hand, because of its low operation cost, PV generation has been replacing conventional generation, which is currently the main flexible resource. Consequently, there is a trend to require renewable generation, including PV, to provide flexible ancillary services. This paper proposes a multi-timescale grid operation model considering the various control strategies of PV providing different ancillary services. Numerical case studies demonstrate that with PV providing both regulation reserve and primary frequency reserve, the system operating costs and PV curtailment will be reduced significantly. Results show that not only the system reliability can be improved but also PV profitability with PV providing more ancillary services.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Providing Ancillary Services with Photovoltaic Generation in Multi-Timescale Grid Operation: Preprint

With photovoltaic (PV) generation substantially increases, electric power systems need more flexible resources that can provide ancillary services to mitigate the variability and uncertainty of the PV generation. On the one hand, the increase of PV generation necessitates the needs of more flexible resources. On the other hand, PV generation, because of its low operation cost, has been replacing the conventional generation in the system which is the main flexible resources in the current system. Consequently, there is a trend to require the renewable generation including PV to provide flexible ancillary services to further accommodate more PV integration. This paper proposes a multi-timescale grid operation model considering the various control strategies of PV providing different ancillary services. Numerical case studies demonstrate that with PV providing both regulation reserve and primary frequency reserve, the system operating costs and PV curtailment will be reduced significantly. It shows that not only the system reliability but also PV's profitability can be improved with PV providing more ancillary services.

41 EE - Solar Energy Technologies Office (EE-4S)↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗