Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A multi-stage stochastic programming model for adaptive biomass processing operation under uncertainty

Variations of physical and chemical characteristics of biomass reduce equipment utilization and increase operational costs of biomass processing. Biomass processing facilities use sensors to monitor the changes in biomass characteristics. Integrating sensory data into the operational decisions in biomass processing will increase its flexibility to the changing biomass conditions. In this paper, we propose a multi-stage stochastic programming model that minimizes the expected operational costs by identifying the initial inventory level and creating an operational decision policy for equipment speed settings. These policies take the sensory information data and the current biomass inventory level as inputs to dynamically adjust inventory levels and equipment settings according to the changes in the biomass' characteristics. We ensure that a prescribed target reactor utilization is consistently achieved by penalizing the violation of the target reactor feeding rate. A case study is developed using real-world data collected at Idaho National Laboratory's biomass processing facility. We show the value of multi-stage stochastic programming from an extensive computational experiment. Our sensitivity analysis indicates that updating the infeed rate of the system, the processing speed of equipment, and bale sequencing based on the moisture level of biomass improves the processing rate of the reactor and reduces operating costs.

09 BIOMASS FUELS↗

Electricity Pricing aware Deep Reinforcement Learning based Intelligent HVAC Control

Recently, deep reinforcement learning (DRL) based intelligent control of Heating, Ventilation, and Air Conditioning (HVAC) has gained a lot of attention due to DRL's ability to optimally control HVAC for minimizing operational cost while maintaining resident's comfort. The success of such DRL-based techniques largely depends on the articulation of the problem in terms of states, actions, and reward function. Inclusion of the electricity pricing information in the problem formulation can play an important role in saving the cost of HVAC operation. However, less attention has been given in the literature on formulating well-crafted state features based on electricity pricing. In this work, we propose an approach for training the DRL model with a specific focus on feature engineering based on electricity pricing. During training, we generate random but sufficiently realistic electricity price signals so that the pre-trained DRL model is robust and adaptive to the dynamic and variable electricity prices. The validation results are encouraging and show the potential of ≈12%-15% savings in the one day cost of HVAC operation, proving the usefulness of including electricity pricing related features as state features.

Kurte, Kuldeep↗

Robust Scheduling of Networked Microgrids for Economics and Resilience Improvement

The benefits of networked microgrids in terms of economics and resilience are investigated and validated in this work. Considering the stochastic unintentional islanding conditions and conventional forecast errors of both renewable generation and loads, a two-stage adaptive robust optimization is proposed to minimize the total operating cost of networked microgrids in the worst scenario of the modeled uncertainties. By coordinating the dispatch of distributed energy resources (DERs) and responsive demand among networked microgrids, the total operating cost is minimized, which includes the start-up and shut-down cost of distributed generators (DGs), the operation and maintenance (O&M) cost of DGs, the cost of buying/selling power from/to the utility grid, the degradation cost of energy storage systems (ESSs), and the cost associated with load shedding. The proposed optimization is solved with the column and constraint generation (C&CG) algorithm. The results of case studies demonstrate the advantages of networked microgrids over independent microgrids in terms of reducing total operating cost and improving the resilience of power supply.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stochastic scheduling for commercial building cooling systems: considering uncertainty in zone temperature prediction

Here, this paper presents the first attempt to address the uncertainty in zone temperature prediction with stochastic optimization. The uncertain zone temperature is a process uncertainty and has not been considered in the existing stochastic optimization for building control. To fill this gap, we proposed a novel formulation of stochastic optimization to handle process uncertainty in building control. Specifically, we first examined the accuracy of a typical linear model for predicting zone temperature. We then formulated the scheduling of the building cooling system as a stochastic optimization problem over a 24-hour look-ahead period to minimize the electricity cost of the studied building cooling system. After that, we applied the proposed stochastic load scheduling (SLS) to a direct expansion (DX) cooling system that serves a medium office building. Through simulation with a detailed building energy simulation software, EnergyPlus, we evaluated the operational cost and the thermal comfort compared with a deterministic load scheduling. The operation cost of scheduling was found to vary with the level of zone temperature prediction uncertainty. The proposed SLS can mitigate the impacts of uncertain zone temperature predictions on both operational cost and thermal comfort. The evaluation results indicate that the proposed SLS works better when the uncertainty level is more significant.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-burnup boiling water reactor steady-state operating conditions and fuel performance analysis

The primary operational costs for existing nuclear reactors are plant operation costs, maintenance costs, and fuel costs, all of which are influenced by the materials used and the design of the reactor core. Optimizing core design parameters—including burnup limits and enrichment levels—can lengthen cycles, reduce outages, reduce reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. Furthermore, developing higher-fidelity tools to simulate these parameters enables better identification of the available margin, improves overall plant safety, and improves the understanding a given plant’s responses to accident scenarios. Here, in the US, much of the research and development focus has traditionally been on pressurized water reactors (PWRs), but boiling water reactors (BWRs) comprise approximately one-third of the US reactor fleet. Modeling and simulation advances for BWRs and PWRs—particularly those achieved through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program—are crucial to the long-term viability of the light–water reactor industry. A key research area of the high burnup and increased enriched fuel initiative is focused on addressing issues related to postulated loss-of-coolant accident (LOCA) scenarios. NEAMS has dedicated significant effort to enhancing tools to better support BWRs. A current focus is showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity steady-state analysis is a first step toward demonstrating a best-estimate, pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior for a representative BWR. The objective of this effort is to provide a modeling capability that will help elucidate and provide a best-estimate evaluation for cladding rupture susceptibility in BWRs. This modeling capability could then be used to prevent and/or mitigate cladding ruptures in postulated accident scenarios without penalizing operational parameters. Additionally, the results of this work will help identify strategies for finding additional margins or potentially limiting cladding ruptures through core design optimizations to enable more efficient core designs.

Capps, Nathan [Oak Ridge National Laboratory (ORNL↗

Commercial, industrial, and institutional discount rate estimation for efficiency standards analysis: Sector-level data 1998–2021

Underlying each of the Department of Energy’s (DOE’s) federal appliance and equipment energy conservation standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). DOE determines economic justification based on whether the benefits exceed the burdens, considering a variety of factors, including the economic impact of the standard on consumers of the product and the savings in lifetime operating cost compared to any increase in price or maintenance expenses (42 U.S.C. 6295(o)(2)(B)). As part of this determination, DOE conducts a Life-Cycle Cost (LCC) analysis, which models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample in order to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels. Thus, the commercial discount rate value(s) used to calculate the present value of energy cost savings within the LCC model implicitly plays a role in estimating the economic impact of potential standard levels. This report provides an in-depth discussion of the commercial discount rate estimation process. It is an update to previous reports on estimating commercial discount rates from firm-level financial data (Fujita, 2016). Major topics covered in this report include: Discount rate estimation methods and rationale; -Data sources used and data limitations; -Discount rate distributions for use in standards analysis; -Discount rate estimation methods and distributions specific to the small business subgroup analysis. Going forward, this report will be updated as data allow and analyses necessitate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial, industrial, and institutional discount rate estimation for efficiency standards analysis: Sector-level data 1998–2022

Underlying each of the U.S. Department of Energy’s (DOE’s) federal appliance and equipment energy conservation standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). DOE determines economic justification based on whether the benefits exceed the burdens, considering a variety of factors, including the economic impact of the standard on consumers of the product and the savings in lifetime operating cost compared to any increase in price or maintenance expenses (42 U.S.C. 6295(o)(2)(B)). As part of this determination, DOE conducts a life-cycle cost (LCC) analysis, which models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels. Thus, the commercial discount rate value(s) used to calculate the present value of energy cost savings within the LCC model implicitly plays a role in estimating the economic impact of potential standard levels. This report provides an in-depth discussion of the commercial discount rate estimation process. It is an update to previous reports on estimating commercial discount rates from firm-level and sector-level financial data (e.g., Fujita, 2021, 2016). Major topics covered in this report include the following: -Discount rate estimation methods and rationale -Data sources used and data limitations -Discount rate distributions for use in standards analysis -Discount rate estimation methods and distributions specific to the small business subgroup analysis A version of this analysis was most recently released in 2022. Going forward, this report will be updated as data allow and analyses necessitate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial, industrial, and institutional discount rate estimation for efficiency standards analysis: Sector-level data 1998–2023

Underlying each of the U.S. Department of Energy’s (DOE’s) federal appliance and equipment energy conservation standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). DOE determines economic justification based on whether the benefits exceed the burdens, considering a variety of factors, including the economic impact of the standard on consumers of the product and the savings in lifetime operating cost compared to any increase in price or maintenance expenses (42 U.S.C. 6295(o)(2)(B)). As part of this determination, DOE conducts a life-cycle cost (LCC) analysis, which models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels. Thus, the commercial discount rate value(s) used to calculate the present value of energy cost savings within the LCC model implicitly plays a role in estimating the economic impact of potential standard levels. This report provides an in-depth discussion of the commercial discount rate estimation process relying on the Capital Asset Pricing Model (CAPM) to estimate a business’ cost of equity, and by adding a risk adjustment factor to the risk-free rate associated with long-term U.S. Treasury bonds to estimate their cost of debt. It is an update to previous reports on estimating commercial discount rates from firm-level and sector-level financial data (e.g., Fujita, 2021, 2016). Major topics covered in this report include the following: • Discount rate estimation methods and rationale • Data sources used and data limitations • Discount rate distributions for use in standards analysis • Discount rate estimation methods and distributions specific to the small business subgroup analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model Predictive Control for a Grid-interactive Efficient Thermal Storage-integrated Heat Pump System

Building heating and cooling systems can be used to overcome the mismatch between the intermittent supply of renewable power and the fluctuating demand for electricity. A novel underground thermal energy storage integrated with a dual-source heat pump has been proposed to mitigate the mismatch while meeting the thermal demand of buildings efficiently. Conventional thermostat control with heuristic rules cannot provide intelligent decisions to maximize the thermal efficiency and flexibility of the proposed system. Advanced control strategies like model predictive control (MPC) have provided a new paradigm for grid-interactive efficient building operation with the advancement of computation and sensing. This study developed an MPC for the proposed system to provide grid service for Demand Side Management and minimize the operating cost of building owners. A control-oriented dynamic model of the proposed system has been developed. Given an objective function and proper constraints, an optimization problem is formulated to determine the optimal control strategy of the system. Dynamic Programming is adopted to solve the optimization problem. A rule-based control (RBC) is also developed to achieve similar goals. Short-term simulations are conducted to compare the system performance resulting from the two controls. The simulation results indicate that the MPC performs more intelligently than the RBC in charging thermal energy storage and selecting heat pump sources by taking advantage of the predicted cooling demands of the building and the performance of the integrated system. As a result, the MPC could save energy and reduce operating costs compared with the RBC. A case study shows that, for a 3-day operation, the MPC saves 36.9% energy and reduces 38.5% operating cost compared with the RBC.

Shi, Liang↗

Develop an efficient and cost-effective novel anaerobic digestion system producing high purity of methane from diverse waste biomass

This project focuses on developing an advanced, intensified anaerobic digestion system aimed at transforming the treatment and conversion of organic wastes into valuable products, specifically renewable natural gas. The motivation for this research stems from the limitations of conventional anaerobic digestion technologies, which often face challenges such as long retention times, high operational costs, and incomplete organic material degradation. The new technology called Intensified Versatile Anaerobic Digestion (IVAD), is developed to address these challenges by incorporating innovative reactors and processes that enhance the overall efficiency and output of anaerobic digestion. The significance of this project lies in its potential to revolutionize waste management practices and waste biomass utilization. The IVAD system integrates a hyperthermophilic anaerobic acidification reactor, a hydrothermal treatment (HTT) unit, and both thermophilic and mesophilic methanogenic reactors. This combination enables a higher rate of organic breakdown and energy recovery, resulting in faster processing times, reduced reactor sizes, and lower operational costs compared to traditional systems. Key data include an increase in methane productivity to 1.18 m 3 /m 3 /day, a significant improvement compared to the baseline technology’s 0.64 m 3 /m 3 /day. Additionally, the IVAD system achieves a 45% reduction in levelized cost of energy (LCOE), down to $\$$10.04/MMBTU, and an energy return on investment (EROI) of 3.19, representing an 87% increase over baseline levels. Technical and economic analyses highlight that the IVAD system significantly reduces hydraulic retention time (HRT) and solid retention time (SRT). The HRT for the HTT reactor can be reduced from 1 hour to 0.5 hours, while decoupling SRT from HRT in the anaerobic acidification reactor (AAR) allows for further reductions. These design optimizations lead to smaller reactor volumes, cutting down equipment and construction costs. Despite these advancements, energy consumption remains comparable to conventional methods due to a novel heat recovery strategy, enhancing overall process productivity. The system also achieves in-situ CO 2 removal and ammonia stripping features, resulting in biogas with a methane purity level of 75%, and produces high-quality nitrogen fertilizer as an additional by-product. Public benefits of the IVAD system are substantial, contributing to sustainable waste management and renewable energy production. By providing a scalable solution that can be adopted by dairy farms and similar agricultural operations, the IVAD system helps reduce waste, produce renewable natural gas (RNG) suitable for transportation fuel, and generate fertilizer, supporting a circular economy. This project plays a role in achieving broader environmental objectives by mitigating greenhouse gas emissions and promoting energy independence. Additionally, it offers a pathway for farmers to lower operational costs while adopting practices that are both environmentally sustainable and economically advantageous.

03 NATURAL GAS↗

Optimized Renewable Energy Integration for EV High-Power Dynamic Wireless Charging Systems

Dynamic wireless charging for electric vehicles is an emerging technology to reduce on-board battery size and extend driving range. Due to its unique characteristic of vehicle-speed-related pulse-like load profile, the high-power dynamic wireless charging system (DWCS) introduces high stress to the utility grid. In this paper, an optimization model for renewable energy integration in the DWCS is proposed to mitigate the grid impact and minimize the operation costs of the whole system. As the load profile of DWCS is related to the traffic volume and various approaching vehicle speeds, the annual average daily traffic data and a stochastic model are used to develop 24-hour load profile of DWCS. To find a tradeoff between grid impact mitigation and operation costs minimization, relationships among power demand from power grid, photovoltaic (PV) capacity, wind energy (WE) capacity and energy storage (ES) capacity are analyzed, and the optimization objective and constraints are developed. Numerical simulation results demonstrate that energy storage integration can greatly mitigate the grid impact of DWCS, and optimal ratio of PV and WE can significantly reduce the operation cost of DWCS.

Zeng, Rong↗

Operation-adversarial scenario generation

This paper proposes a modified conditional generative adversarial network (cGAN) model to generate net load scenarios for power systems that are statistically credible, conditioned by given labels (e.g., seasons), and, at the same time, “stressful” to the system operations and dispatch decisions. The measure of stress used in this paper is based on the operating cost increases due to net load changes. The proposed operation-adversarial cGAN (OA-cGAN) internalizes a DC optimal power flow model and seeks to maximize the operating cost and achieve a worst-case data generation. The training and testing stages employed in the proposed OA-cGAN use historical day-ahead net load forecast errors and has been implemented for the realistic NYISO 11-zone system. In conclusion, our numerical experiments demonstrate that the generated operation-adversarial forecast errors lead to more cost-effective and reliable dispatch decisions.

42 ENGINEERING↗

Nb3Sn Coating of Twin Axis Cavity for SRF Applications

The twin axis cavity with two identical accelerating beams has been proposed for Energy recovery linac (ERL) applications. Nb3Sn is a superconducting material with a higher critical temperature and a higher critical field as compared to Nb, which promises a lower operating cost due to higher quality factors. Two niobium twin axis cavities fabricated at JLab and were proposed to be coated with Nb3Sn. Due to their more complex geometry, the typical coating process used for basic elliptical cavities needs to be improved to coat these cavities. This devel-opment advances the current coating system at JLab for coating complex cavities. Two twin axis cavities were coated recently for the first time. This contribution dis-cusses initial results from coating of twin axis cavities, RF testing and witness sample analysis with an overview of the current challenges towards high performance Nb3Sn coated twin axis cavities.

Tiskumara, J.↗

High-Burnup BWR LOCA Burst Analysis Framework Development and Demonstration

Nuclear power currently contributes approximately 20% of total electricity generation in the United States and more than 10% globally. Given the increasing reliance on nuclear energy to achieve our nation’s goal of reaching net-zero carbon emissions by 2050, there is significant pressure on the existing nuclear industry to extend plant operational licenses and improve efficiency. This is crucial as the existing nuclear fleet serves as a vital bridge until new light water and advanced reactors can be developed and deployed, bolstering the supply of carbon-free energy to meet domestic demands. Operational costs primarily consist of plant operation and maintenance and fuel costs, influenced by materials and reactor core designs. These factors, coupled with heavily subsidized renewable energy markets, create a challenging economic environment for the existing light water reactor fleet, as well as for new build projects. To address these economic challenges, the nuclear industry has developed a strategic blueprint aimed at enhancing nuclear power’s economic sustainability. Past initiatives, such as efforts to eliminate fuel failures by 2010 and reduce operating costs by 30% before 2020, have laid the groundwork. Optimizing core design parameters, including burnup limits and enrichment levels, can lengthen cycles, reduce outages, reduce batch reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. In the United States, boiling water reactors (BWRs) comprise approximately one-third of the fleet, although much of the research and development focus has traditionally been on pressurized water reactors (PWRs). Advances in modeling and simulation, particularly through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, are crucial to the long-term viability of BWRs, just as they are for PWRs. A key research area of the high burnup/increased enriched fuel initiative is focused on addressing loss-of-coolant-accident (LOCA)-related issues. NEAMS has dedicated significant effort to enhancing tools to better support BWRs, with a current focus on showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity work will demonstrate a best estimate pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior. This modeling capability will help with better understanding and realistic evaluation of fuel fragmentation, relocation, and dispersal (FFRD) phenomena at BWRs, which then could be used to prevent FFRD at BWRs without penalizing operational parameters. In addition, the results of this work will help identify strategies to identify additional margins or to potentially limit cladding rupture through core design optimizations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal electric-distribution-grid planning considering the demand-side flexibility of thermal building systems for a test case in Singapore

The planning of district-scale electric grids, i.e., distribution grids, has traditionally relied on finding the most cost-effective design such that they are able to supply the peak loads in a district. With the advent of electric demand side flexibility (DSF), there is the opportunity to reshape peak loads such that the investment cost of the electric grid decreases in exchange for a minor increase in the operation cost. This paper formulates an optimal planning approach for the electric grid at the district scale, which incorporates the DSF from thermal building systems, e.g., heating ventilation and air-conditioning (HVAC) systems. The problem is formulated as a mixed-integer linear program (MILP) and aims at minimizing the investment cost for the grid along with the operation cost of the flexible loads. This is subjected to the fixed electricity demand and thermal comfort constraints of building occupants. To this end, linear models for the thermal comfort in the buildings and the power flow in electric grid are considered. The approach is tested on a district planning test case based in Singapore, where the results show up to 30.9 % reductions in investment cost and up to 3.7 % reduction in total annualized cost. Urban planning authorities, developers and utility companies can all benefit from the presented approach to make optimized investment decisions. For building operators, the results point to the need of adopting their control systems for DSF.

Troitzsch, Sebastian↗

Improved PV System Control Strategies to Reduce Power Management Costs in Nanogrids

An improved PV system control method is proposed to reduce nanogrid operation costs in this paper. A model including it various components such as photovoltaic (PV) systems, energy storage systems (ESSs), gateways, and household loads is considered with the constraints of the ESS, PV irradiance from real data, and household load. We designed an optimal economic dispatch strategy with an improved PV system control method. Combining the proposed optimal economic dispatch and PV system control strategies, it can improve the control performance for both transient and steady-state responses thereby enabling the maximum power to be extracted from the PV. Consequently, the PV power is maximized, which allows the ESS to use less power and sell the surplus to external power sources, which means the proposed method decreases the nanogrid operation costs. Furthermore, this performance is verified via nanogrid simulations and PV experimental kit.

PV system control↗