Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nonconformance report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

44 records · Page 3

Design of Unstructured Adaptive (UA) NAS Parallel Benchmark Featuring Irregular, Dynamic Memory Accesses

We describe the design of a new method for the measurement of the performance of modern computer systems when solving scientific problems featuring irregular, dynamic memory accesses. The method involves the solution of a stylized heat transfer problem on an unstructured, adaptive grid. A Spectral Element Method (SEM) with an adaptive, nonconforming mesh is selected to discretize the transport equation. The relatively high order of the SEM lowers the fraction of wall clock time spent on inter-processor communication, which eases the load balancing task and allows us to concentrate on the memory accesses. The benchmark is designed to be three-dimensional. Parallelization and load balance issues of a reference implementation will be described in detail in future reports.

Feng, Hui-Yu↗

Hubble Space Telescope: SRM/QA observations and lessons learned

The Hubble Space Telescope (HST) Optical Systems Board of Investigation was established on July 2, 1990 to review, analyze, and evaluate the facts and circumstances regarding the manufacture, development, and testing of the HST Optical Telescope Assembly (OTA). Specifically, the board was tasked to ascertain what caused the spherical aberration and how it escaped notice until on-orbit operation. The error that caused the on-orbit spherical aberration in the primary mirror was traced to the assembly process of the Reflective Null Corrector, one of the three Null Correctors developed as special test equipment (STE) to measure and test the primary mirror. Therefore, the safety, reliability, maintainability, and quality assurance (SRM&QA) investigation covers the events and the overall product assurance environment during the manufacturing phase of the primary mirror and Null Correctors (from 1978 through 1981). The SRM&QA issues that were identified during the HST investigation are summarized. The crucial product assurance requirements (including nonconformance processing) for the HST are examined. The history of Quality Assurance (QA) practices at Perkin-Elmer (P-E) for the period under investigation are reviewed. The importance of the information management function is discussed relative to data retention/control issues. Metrology and other critical technical issues also are discussed. The SRM&QA lessons learned from the investigation are presented along with specific recommendations. Appendix A provides the MSFC SRM&QA report. Appendix B provides supplemental reference materials. Appendix C presents the findings of the independent optical consultants, Optical Research Associates (ORA). Appendix D provides further details of the fault-tree analysis portion of the investigation process.

Rodney, George A.↗

Defense Waste Processing Facility Canister Closure Weld Current Validation Testing

Two closure welds on filled Defense Waste Processing Facility (DWPF) canisters failed to be within the acceptance criteria in the DWPF operating procedure SW4-15.80-2.3 (1). In one case, the weld heat setting was inadvertently provided to the canister at the value used for test welds (i.e., 72%) and this oversight produced a weld at a current of nominally 210 kA compared to the operating procedure range (i.e., 82%) of 240 kA to 263 kA. The second weld appeared to experience an instrumentation and data acquisition upset. The current for this weld was reported as 191 kA. Review of the data from the Data Acquisition System (DAS) indicated that three of the four current legs were reading the expected values, approximately 62 kA each, and the fourth leg read zero current. Since there is no feasible way by further examination of the process data to ascertain if this weld was actually welded at either the target current or the lower current, a test plan was executed to provide assurance that these Nonconforming Welds (NCWs) meet the requirements for strength and leak tightness. Acceptance of the welds is based on evaluation of Test Nozzle Welds (TNW) made specifically for comparison. The TNW were nondestructively and destructively evaluated for plug height, heat tint, ultrasonic testing (UT) for bond length and ultrasonic volumetric examination for weld defects, burst pressure, fractography, and metallography. The testing was conducted in agreement with a Task Technical and Quality Assurance Plan (TTQAP) (2) and applicable procedures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Self-consistent analysis for the η c → γ γ process

The next-to-next-to-leading-order (NNLO) perturbative QCD (pQCD) predictions for both the decay width and the transition form factor in the η c → γ γ process, based on nonrelativistic QCD (NRQCD), deviate from precise experimental measurements. These significant discrepancies have cast doubt on the applicability of NRQCD to charmonium processes. In this paper, we analyze the η c → γ γ process by applying the principle of maximum conformality (PMC), a systematic method for eliminating renormalization scheme-and-scale ambiguities. The PMC renormalization scales are determined by absorbing the nonconformal β -terms that govern the behavior of the QCD running coupling via the renormalization group equation. We obtain the PMC scale Q ⋆ = 4.49 m c for the η c → γ γ decay width. Even after using the PMC method, the convergence of the pQCD series is still poor, which indicates the importance of uncalculated next-to-next-to-next-to-leading-order and higher-order terms. The resulting value for Γ η c → γ γ is in agreement with the Particle Data Group’s reported value of Γ η c → γ γ = 5.1 ± 0.4 keV within the bounds of uncertainties. Moreover, the transition form factor obtained using the PMC is also in good agreement with precise experimental measurements. The application of the PMC suggests a potential resolution to η c → γ γ puzzle and supports the applicability of NRQCD to charmonium processes. Published by the American Physical Society 2025

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ECAR-3873 Acceptance of Nonconforming Fuel for the AGR-5/6/7 Irradiation Experiments

Low-enriched fuel compacts fabricated for the AGR-5/6/7 irradiation experiments did not conform to all fuel specifications. Reasons why the fuel is acceptable for use in the AGR-5/6/7 irradiation are discussed. Revision 1 alters the characterization data for the dispersed uranium and exposed kernel defect fractions. Additional characterization data was obtained for fuel compacts analyzed by Oak Ridge National Laboratory. This enabled statistical outliers to be rejected and to confirm that results obtained from BWX Technologies Nuclear Operations Group were statistically independent of the Oak Ridge results and should be excluded from the analyses. Revision 2 alters the characterization data for the TRISO lot, J52R-16-98005, used in the fabrication of the AGR-5/6/7 fuel. Data from the BWXT J52R-16-98005 Certification package is used to calculate the reported values.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nonconforming Mesh Refinement for High-Order Finite Elements

In this study, we propose a general algorithm for nonconforming adaptive mesh refinement (AMR) of unstructured meshes in high-order finite element codes. Our focus is on $h$-refinement with a fixed polynomial order. The algorithm handles triangular, quadrilateral, hexahedral, and prismatic meshes of arbitrarily high-order curvature, for any order finite element space in the de Rham sequence. We present a flexible data structure for meshes with hanging nodes and a general procedure to construct the conforming interpolation operator, both in serial and in parallel. The algorithm and data structure allow anisotropic refinement of tensor product elements in two and three dimensions and support unlimited refinement ratios of adjacent elements. We report numerical experiments verifying the correctness of the algorithms and perform a parallel scaling study to show that we can adapt meshes containing billions of elements and run efficiently on 393,000 parallel tasks. Finally, we illustrate the integration of dynamic AMR into a high-order Lagrangian hydrodynamics solver.

97 MATHEMATICS AND COMPUTING↗

Safety Assessment of Conformance Monitoring for Situational Awareness in UTM Operations

This report presents a systematic approach to evaluating the safety benefit of utilizing strategic deconfliction and Conformance Monitoring for Situational Awareness to manage the traffic that is comprised of both conforming aircraft and contingent aircraft. First, we developed a Monte-Carlo-based simulation platform that generates a range of nominal flight paths, a set of flight paths associated with contingent aircraft, encounters between conforming and contingent aircraft, and simulates aircraft's reported positions within conformance bounds. Next, we derived the mathematical equations for quantifying the level of safety, represented by the probability of mid-air collision per flight hour, using the flight data from the simulation platform. Finally, we compared the safety benefit of CMSA services in scenarios generated at different traffic densities and rates of contingent aircraft. This study suggests that strategic deconfliction and CMSA services can collaboratively handle traffic mixed with conforming and contingent aircraft more safely than strategic deconfliction alone.

CMSA↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗