Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “network equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Safety Evaluation of Nitric Acid Reactions with Non-Polysaccharide Organic Materials

The hazards of non-polysaccharide materials in a transuranic (TRU) waste drum exposed to nitric acid (HNO 3 ) and metal nitrate salts have been evaluated, focusing on sorbents and on resins used in ion-exchange chromatography. The range of sorbent materials can be grouped into two general categories: 1) a variety of polyacrylate and polyacrylamide compounds that incorporate polar carbonyl functional groups designed to sorb protic (i.e., acidic) substrates and solutions; 2) hydrocarbon based polymers that include polystyrene, polybutadiene, and polyethylene derivatives, which are designed to sorb non-polar organic substrates and solutions. The ion-exchange resins are constructed of hydrocarbon based polymeric networks equipped with pendant ionizable functional groups designed to reversibly sorb/desorb ionic species that are targeted for separation from a mobile phase.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Connected Lighting Systems Efficiency Study: PoE Cable Energy Losses, Part 2

Power over Ethernet (PoE) technology offers the ability to provide both low-voltage direct current (DC) power and communication over a standard Ethernet cable—also referred to as a local area network (LAN) cable or Category cable. Light-emitting diode (LED) technology has reduced the power required for lighting applications, while advances in PoE standards and technology have yielded substantial increases in the amount of power that can be delivered to a networked device over a single cable. As a result, PoE technology is emerging in lighting and many other applications beyond its historical foothold in telephony and networking equipment. Several major LED luminaire manufacturers have introduced PoE connected lighting systems in recent years, making this a potentially disruptive technology. PoE lighting systems can offer improved efficiency relative to traditional line voltage alternating current (AC) systems, because AC-DC power conversion losses can be reduced if this work is consolidated among one or more PoE switches, rather than being distributed among a greater number of smaller LED drivers. However, this effect can be offset to some extent by increased losses associated with an increased voltage drop in the low-voltage Ethernet cabling. In fact, these losses could exceed 15% in poorly designed systems. Aspects of cable design that can affect cable energy performance include American Wire Gauge (AWG), Category (e.g., 5e), shielding, and fire rating (e.g., CMP). Installation practices (e.g., bending, bundling, conduit) can also affect cable performance. Although cable energy losses can be predicted with knowledge of conductor DC resistance (DCR), and DCR can be estimated based on rated AWG, most product datasheets state maximum DCR - or reference standards that specify DCR limits - in lieu of nominal DCR.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prototyping DAQ network functions on FABRIC

This poster relates to a project that is investigating the use of the FABRIC federated testbed to scale-up research infrastructure to develop network functions that use smart (programmable) network equipment to support High Energy Physics (HEP) research. The poster describes preliminary work that involves non trivial packet parsing related to Fermilab DAQ workloads that is implemented on real hardware, and a correctness and performance evaluation.

Sagstad, Bjoern [IIT, Chicago]↗

Back-Up/ Peak Shaving Fuel Cell System

This Final Report covers the work executed by Plug Power from 8/11/03 – 10/31/07 statement of work for Topic 2: advancing the state of the art of fuel cell technology with the development of a new generation of commercially viable, stationary, Back-up/Peak-Shaving fuel cell systems, the GenCore II. The Program cost was $7.2 M with the Department of Energy share being $3.6M and Plug Power’s share being $3.6 M. The Program started in August of 2003 and was scheduled to end in January of 2006. The actual program end date was October of 2007. A no cost extension was grated. The Department of Energy barriers addressed as part of this program are: Technical Barriers for Distributed Generation Systems: o Durability o Power Electronics o Start up time Technical Barriers for Fuel Cell Components: o Stack Material and Manufacturing Cost o Durability o Thermal and water management Background The next generation GenCore backup fuel cell system to be designed, developed and tested by Plug Power under the program is the first, mass-manufacturable design implementation of Plug Power’s GenCore architected platform targeted for battery and small generator replacement applications in the telecommunications, broadband and UPS markets. The next generation GenCore will be a standalone, H2 in-DC-out system. In designing the next generation GenCore specifically for the telecommunications market, Plug Power is teaming with BellSouth Telecommunications, Inc., a leading industry end user. The final next generation GenCore system is expected to represent a market-entry, mass-manufacturable and economically viable design. The technology will incorporate: • A cost-reduced, polymer electrolyte membrane (PEM) fuel cell stack tailored to hydrogen fuel use • An advanced electrical energy storage system • A modular, scalable power conditioning system tailored to market requirements • A scaled-down, cost-reduced balance of plant (BOP) • Network Equipment Building Standards (NEBS), UL and CE certifications.

08 HYDROGEN↗

Network systems

Network equipment installation at remote sites for Apollo program

SPACECRAFT COMMUNICATIONS SYSTEM↗

Proceedings of the Second International Mobile Satellite Conference (IMSC 1990)

Presented here are the proceedings of the Second International Mobile Satellite Conference (IMSC), held June 17-20, 1990 in Ottawa, Canada. Topics covered include future mobile satellite communications concepts, aeronautical applications, modulation and coding, propagation and experimental systems, mobile terminal equipment, network architecture and control, regulatory and policy considerations, vehicle antennas, and speech compression.

Huck, R. W.↗

Space Station thermal control system evolution

The thermal control system (TCS) for the space station assembly complete configuration includes a two-phase central thermal bus with a supplemental body mounted radiator system. Evolution of the space station from a heat rejection capacity of 75 kW to 300 kW will require scars to expand the thermal fluid distribution network, equipment replacement to enable greater thermal transport capacity, and enlargement of the heat rejection subsystem for increased heat rejection. The TCS requirements for assembly completion and growth are presented along with a review of the basic structure of the active and passive thermal control systems which include provisions for growth.

Bullock, Richard L.↗

STS-96 Mission Highlights

In this first part of a three-part video mission-highlights set, the flight of the STS-96 Space Shuttle Orbiter Discovery is reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station (ISS). This is the first flight to dock to the International Space Station. The primary payloads are the Russian cargo crane, known as STRELA, which the astronauts mount to the exterior of the Russian station segment, the SPACEHAB Oceaneering Space System Box (SHOSS), and a U.S. built crane called the ORU Transfer Device (OTD). Other payloads include the Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment (STARSHINE), the Shuttle Vibration Forces Experiment (SVF), and the Orbiter Integrated Vehicle Health Monitoring - HEDS Technology Demonstration (IVHM HTD). The traditional pre-launch breakfast, being suited up, entry into the Shuttle, and views of the liftoff from several different vantage points are shown. In-flight footage includes views from the robot arm conducting a television survey of Discovery's payload bay and the flawless docking of the Unity module with the International Space Station. During the docking, camera views from both the ISS and Discovery are presented. These activities make up the first three Flight Days of STS-96.

Source record↗

STS-96 Mission Highlights

In this third part of a three-part video mission-highlights set, spacecrew operations between the STS-96 Space Shuttle Orbiter Discovery and the International Space Station, as well as STS reentry and landing is reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This third part of the three part series includes footage from Flight Days 8-11 (FD 8-11) of the mission. FD 8 includes the crew members moving the last items from Discovery into the International Space Station (ISS), closing the final hatch on the orbiting outpost and commanding a series of 17 pulses of Discovery's reaction control system jets to boost the station's orbit. Discovery undocks from the station, performs a 2 1/2 lap flyaround of the station, before Husband fires Discovery's jets in a final burst to move Discovery away from the station, concluding six days of docked operations. After the flyaround, Husband fires Discovery's jets to depart the station's vicinity. Beginning FD 9, as Discovery departs from the station, Mission Specialists Tammy Jernigan and Dan Barry pack away the space suit gear they used during their spacewalk early in the mission, while Commander Kent Rominger and Pilot Rick Husband practice landings on a laptop computer program. Mission Specialists Julie Payette and Valery Tokarev help to stow gear and repressurize the shuttle's cabin to its standard 14.7 pounds per square inch. The crew also readies to deploy a small, student-built payload called STARSHINE (Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment). In and around landing preparations and the STARSHINE deploy, the crew stowe all equipment used throughout the mission. The STARSHINE satellite ejects from a canister in Discovery's payload bay on FD 10. FD 11 is completed as Discovery swoops out of the darkness as Commander Kent Rominger sets the shuttle and his crewmates down on Runway 15 at the Shuttle Landing Facility in Florida to successfully complete the first shuttle mission of the year. Several different views of the landing are highlighted in the video.

Source record↗

NASA-OAI HPCCP K-12 Program

The NASA-OAI High Performance Communication and Computing K- 12 School Partnership program has been completed. Cleveland School of the Arts, Empire Computech Center, Grafton Local Schools and the Bug O Nay Ge Shig School have all received network equipment and connections. Each school is working toward integrating computer and communications technology into their classroom curriculum. Cleveland School of the Arts students are creating computer software. Empire Computech Center is a magnet school for technology education at the elementary school level. Grafton Local schools is located in a rural community and is using communications technology to bring to their students some of the same benefits students from suburban and urban areas receive. The Bug O Nay Ge Shig School is located on an Indian Reservation in Cass Lake, MN. The students at this school are using the computer to help them with geological studies. A grant has been issued to the friends of the Nashville Library. Nashville is a small township in Holmes County, Ohio. A community organization has been formed to turn their library into a state of the art Media Center. Their goal is to have a place where rural students can learn about different career options and how to go about pursuing those careers. Taylor High School in Cincinnati, Ohio was added to the schools involved in the Wind Tunnel Project. A mini grant has been awarded to Taylor High School for computer equipment. The computer equipment is utilized in the school's geometry class to computationally design objects which will be tested for their aerodynamic properties in the Barberton Wind Tunnel. The students who create the models can view the test in the wind tunnel via desk top conferencing. Two teachers received stipends for helping with the Regional Summer Computer Workshop. Both teachers were brought in to teach a session within the workshop. They were selected to teach the session based on their expertise in particular software applications.

Source record↗

Near Earth Network (NEN) Users’ Guide

The purpose of this document is to describe the technical capabilities of the ground stations that comprise the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN). This document provides sufficient information to enable project engineers and support personnel to begin interfacing with the NEN. It is not intended to be a technical description of network equipment; rather, it defines NEN capabilities and identifies those parameters of particular interest to the user. For more detailed information, see the documents cited in Section 1.3. NEN capabilities evolve based on user requirements and budget limitations. New projects can be assured of NEN capabilities agreed to in their Radio Frequency Interface Control Document (RFICD).

Telemetry↗

Assembling Appliances Standards from a Basket of Functions

Rapid innovation in product design challenges the current methodology for setting standards and labels, especially for electronics, software and networking. Major problems include defining the product, measuring its energy consumption, and choosing the appropriate metric and level for the standard. Most governments have tried to solve these problems by defining ever more specific product subcategories, along with their corresponding test methods and metrics. An alternative approach would treat each energy-using product as something that delivers a basket of functions. Then separate standards would be constructed for the individual functions that can be defined, tested, and evaluated. Case studies of thermostats, displays and network equipment are presented to illustrate the problems with the classical approach for setting standards and indicate the merits and drawbacks of the alternative. The functional approach appears best suited to products whose primary purpose is processing information and that have multiple functions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NREL + Verizon Wireless

Verizon Wireless and the National Renewable Energy Laboratory (NREL) are working to develop and validate a new design solution for telecommunications facilities. Network equipment is all DC, so rather than relying on conventional AC power, the design will employ photovoltaics (PV) and batteries, and it will require new DC cooling systems. The new design will ease utility interconnection by connecting PV to the DC bus and batteries, increase resiliency by allowing PV to contribute - and cooling to continue - in a power outage, lower costs with day-to-day utility cost savings, and increase efficiency through reduced part count and fewer power conversions from DC to AC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

INL Wireless Test Bed Range Manual

The Wireless Test Bed (WTB) is a customer-focused test and evaluation program that is part of the National and Homeland Security Directorate. This manual describes the WTB’s program, facilities, networks, equipment, and the services available to customers.

99 GENERAL AND MISCELLANEOUS↗

DCIS integration tests for Lungmen nuclear power plant - 370

The factory acceptance tests (FAT) for distributed control and information systems (DCIS) of Lungmen nuclear power plant (LMNPP) Units 1 and 2 were separately performed by individual suppliers for their supplied scopes. The FAT also included overlap interface tests between the separately supplied scopes, but did not include an overall integration test. There were concerned by the regulator and the public over the lack of an integration test, which was believed to be indispensable to verify the correctness and completeness of a digital system of such large scale ever applied by Taiwan Power Company (Taipower). To address these concerns and enhance confidence in the DCIS, the DCIS integration tests, including reactor water level integration test, reactor pressure integration test, integration test for turbine generator and reactor protection system, integration test for proper plant response to safety and non-safety network equipment failures, and DCIS dynamic integration test, were performed at site during Unit 1| site tests. It is to be noted that these tests were beyond the post construction tests, the pre-operational tests, and the start-up tests, which are the normal industry practice and formally required by the regulator. A common goal for these integration tests is to verify the capability of the DCIS to transmit signal/data properly across various suppliers' equipment to actuate the final equipment. The methods and principle, the test purpose/test items/acceptance criteria and the test results for these tests are described. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overvoltage protection network

Electrical equipment to be protected from overvoltage is connected with a possible source of overvoltage via an input conductor. A fuse is connected in series with the input conductor. A spark gap is connected between the input conductor and ground for conducting the overvoltage current to ground and for blowing the fuse to open the circuit to the electrical equipment. A pulse attenuator network is provided between the spark gap and the electrical equipment to be protected for attenuating the pulse of energy passing through the fuse and spark gap prior to blowing of the fuse. The pulse attenuator network includes additional shunt spark gaps, series inductance, and a series connection of a twisted shielded pair of conductors having low-voltage insulation.

Cambra, J. M.↗

A Review of Technologies that can Provide a 'Root of Trust' for Operational Technologies

The supply chain attack pathway is being increasingly used by adversaries to bypass security controls and gain unauthorized access to sensitive networks and equipment (e.g., Critical Digital Assets). Cyber-attacks targeting supply chain generally aim to compromise the environments, products, or services of vendors and suppliers to inject, add, or substitute authentic software and hardware with malicious elements. These malicious elements are deemed to be authentic as they arise from the vendor or supplier (i.e., the supply chain). This research aims at providing a survey of technologies that have the potential to reduce exposure of sensitive networks and equipment to these attacks, thereby improving tamper resistance. The recent advances in the performance and capabilities of these technologies in recent years has increased their potential applications to reduce or mitigate exposure of the supply chain attack pathway. The focus being on providing an analysis of the benefits and disadvantages of smart cards, secure tokens, and elements to provide root of trust. This analysis provides evidence that these roots of trust can increase the technical capability of equipment and networks to authenticate changes to software and configuration thereby increasing resilience to some supply chain attacks, such as those related to logistics and ICT channels, but not development environment attacks.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Orbiter CIU/IUS communications hardware evaluation

Inertial Upper Stage (IUS) and DoD Communication Interface Unit (CIU) communication system design, hardware specifications, and interfaces were evaluated to determine their compatibility with the Orbiter payload communication and data handling equipment and the Orbiter network communication equipment.

Huth, G. K.↗