Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “natural attenuation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Independent Review of Groundwater Remediation Strategy for Hexavalent Chromium and RDX Groundwater Plumes at Los Alamos National Laboratory (Rev. 1)

Site operations at the Los Alamos National Laboratory (LANL) resulted in the release of oxidized chromium, Cr(VI), into Sandia Canyon from cooling tower effluent from 1956 until 1972. The chromium traveled with the surface water approximately 3 miles downstream before migrating below ground surface. Chromium concentrations exceed 50 μg/L in the upper portion of the aquifer. Another LANL groundwater plume of concern is associated with RDX (Royal Demolition Explosives, 1,3,5-trinitro-1,3,5-triazine). Between 1951 and 1996, RDX was released to the mesa-top facilities' process water outfall, adjacent and underlying soils, and alluvial sediments, along with surface water in Cañon de Valle. Between 2000 and 2010, two remedial actions were deployed, removing much of the near-surface RDX, however, recharge due to precipitation has transported RDX into the perched-intermediate zone and into the regional aquifer. The report documents an independent technical review by scientists from the Department of Energy (DOE) Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) to provide recommendations for potential near term actions to address and optimize remediation for both the Cr(VI) and RDX plumes. The proposed near-term remedial actions include design of pump and treat systems for Cr(VI) and monitoring and study for natural attenuation for RDX. The review assesses existing data, conceptual and numerical modeling, and it recommends a technical integration process to support identifying and implementing strategic, effective and efficient remedies. The DOE Environmental Management Los Alamos Field Office (EM-LA) and their cleanup contractor Newport News Nuclear-BWTX, LLC Los Alamos (N3B) provided the information required for the review. Interviews were also conducted with regulators to obtain the full spectrum of technical, regulatory and scientific perspectives. The independent review team was impressed by the capabilities, experiences, innovativeness, and insightfulness of the technical representatives from both the regulator, the New Mexico Environment Department (NMED) and N3B. Incorporation of vadose zone flow pathways in the conceptual site model (CSM) and configuring the numerical modeling for the site was generally state-of-the-practice (or better). This could be considered state-of-the-art by addressing uncertainties related to spatial extent of hydraulic windows. The reviews from the regulators were thorough and often provided useful concepts for consideration and future/study resolutions. The overarching consensus recommendation of independent review team is that the LANL groundwater plumes should be addressed in context of the emerging "management of complex sites" paradigm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Potassium Permanganate Oxidation on Subsurface Microbial Activity

In situ chemical oxidation has the potential for degrading large quantities of organic contaminants and can be more effective and timely than traditional ex situ treatment methods. However, there is a need to better characterize the potential effects of this treatment on natural processes. This study focuses on potential inhibition to anaerobic dechlorination of trichloroethene (TCE) in soils from a large manufacturing facility as a result of in situ oxidation using potassium permanganate (KMn04)Previous microcosm studies established that natural attenuation occurs on-site and that it is enhanced by the addition of ethanol to the system. A potential remediation scheme for the site involves the use of potassium permanganate to reduce levels of TCE in heavily contaminated areas, then to inject ethanol into the system to "neutralize" excess oxidant and enhance microbial degradation. However, it is currently unknown whether the exposure of indigenous microbial populations to potassium permanganate may adversely affect biological reductive dechlorination by these microorganisms. Consequently, additional microcosm studies were conducted to evaluate this remediation scheme and assess the effect of potassium permanganate addition on biological reductive dechlorination of TCE. Samples of subsurface soil and groundwater were collected from a TCE-impacted area of the site. A portion of the soil was pretreated with nutrients and ethanol to stimulate microbial activity, while the remainder of the soil was left unamended. Soil/groundwater microcosms were prepared in sealed vials using the nutrient-amended and unamended soils, and the effects of potassium permanganate addition were evaluated using two permanganate concentrations (0.8 and 2.4 percent) and two contact times (1 and 3 weeks). TCE was then re-added to each microcosm and TCE and dichloroethene (DCE) concentrations were monitored to determine the degree to which microbial dechlorination occurred following chemical oxidation. Evidence of microbial degradation was generally detected within four weeks after TCE addition. Increases in DCE concentrations were consistent with decreases in TCE. The concentration of TCE in the nutrient-amended samples exposed to 2.4% KMnO4 for one week degraded somewhat more slowly than the samples exposed to the 0.8% KMnO4. The rates of degradation did not correlate with the length of KMn04 exposure for the nutrient-amended microcosms. Microbial degradation of TCE in the unamended microcosms was generally similar to that observed in the nutrient-amended microcosms. One treatment condition (unamended, one week exposure, 2.4% KMnO4) was exposed to elevated levels of ethanol and showed little evidence of degradation. It is suspected that the high levels of ethanol were toxic to the microorganisms. The results of the study indicate that exposure of indigenous soil and groundwater microbial populations to KMnO4 at concentrations of 0.8 to 2.4% do not impair the ability of the microbial populations to dechlorinate TCE. Consequently, the combination of chemical oxidation followed by enhanced biological reductive dechlorination appears to be a viable remedial strategy for highly-impacted subsurface areas of the site.

Rowland, Martin A.↗

Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The next performance monitoring event is scheduled for July 2015.

Converter Compressor Building↗

Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

Source record↗

Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

Operations↗

Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

MLPV↗

Wilson Corners SWMU 001 2015 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2015 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration John F. Kennedy Space Center, Florida. The objectives of the 2015 LTM event were to evaluate the groundwater flow direction and gradient, to monitor the vertical and horizontal extent of the volatile organic compounds (VOCs; including the upgradient and sidegradient extents, which are monitored every five years), and to monitor select locations internal to the dissolved groundwater plume. The 2015 LTM event included several upgradient and sidegradient monitoring wells that are not sampled annually to verify the extent of VOCs in this portion of the site. The December 2015 LTM groundwater sampling event included, depth to groundwater measurements, 40 VOC samples collected using passive diffusion bags, and one VOC sample collected using low-flow techniques. Additionally, monitoring well MW0052DD was overdrilled and abandoned using rotasonic drilling techniques. The following conclusions can be made based on the 2015 LTM results: groundwater flow is generally to the west with northwest and southwest flow components from the water table to approximately 55 feet below land surface (ft BLS); peripheral monitoring wells generally delineate VOCs to groundwater cleanup target levels (GCTLs) except for monitoring wells MW0088, MW0090, MW0095, and NPSHMW0039, which had vinyl chloride (VC) concentrations near the GCTL and MW0062, which had trichloroethene (TCE), cis-1,2-dichloroethenen (cDCE), and VC concentrations above natural attenuation default concentrations (NADCs); VOCs in interior downgradient wells generally fluctuate within historic ranges except for monitoring wells in the north-northwest portion of the site, which have increasing VC concentrations indicating potential plume migration and expansion; Historically, the vertical extents of the VOCs were delineated by monitoring wells screened greater than 60 ft BLS (MW0083 through MW0086, and MW0078). The 2015 LTM results indicate that concentrations of daughter product cDCE is greater than the NADC in MW0078 and that cDCE and VC are greater than NADCs in MW0130. TCE was greater than the GCTL in monitoring well MW130 and not detected above method detection limits (9 micrograms per Liter) in monitoring well MW0078. No GCTL exceedances were identified in monitoring wells MW0083 or MW0086; the dissolved plume footprint appears generally stable, though not fully delineated by monitoring well data in the northeast portion of the site; and 2015 LTM results generally support the existing Conceptual Site Model. Geosyntec recommends modifying the LTM program, collecting a verification sample from monitoring well MW0062, and performing a direct push technology instigation in the northnortheastern portion of the site. A cluster of monitoring wells (MW0132 [2 to 12 ft BLS], MW0133 [15 to 25 ft BLS], and MW0134 [29 to 34 ft BLS]) is proposed to delineate impacts in the northnortheast portion of the site. Geosyntec recommends installation of a vertical extent well in the center of the site (Hot Spot 2 area) post-remediation implementation.

groundwater↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM completed in September 2019 for the Northern Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. The IGWM was implemented for the Northern VOC Area to provide additional data, to be evaluated along with previous long-term monitoring data, to determine future IGWM options and to evaluate the efficacy of monitored natural attenuation (MNA) as a passive remedial measure in comparison to active remedies for the Northern VOC Area. The primary contaminants of concern in the Northern VOC Area are trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), vinyl chloride (VC), and benzene.

groundwater↗

Contractors Road Heavy Equipment Area (SWMU055) Hot Spot 1 Bioremediation Interim Measure Performance Monitoring And Site-Wide Interim Groundwater Monitoring Report

This document presents a summary of activities completed from January through December 2019 at the Contractors Road Heavy Equipment (CRHE) area, located at John F. Kennedy Space Center (KSC), Florida. The activities summarized include: 1) Annual Hot Spot 1 (HS1) eastern bioremediation interim measure (IM) performance monitoring (December 2019); 2) Annual HS1 western bioremediation IM performance monitoring (December 2019); 3) Annual Interim Groundwater Monitoring (IGM) activities (December 2019); 4) Sub-slab soil gas (SSSG) sampling to investigate potential vapor intrusion (VI) (June 2019). Bioremediation IM activities were implemented in two phases at the CRHE. The first event was implemented in November and December 2016 in the eastern portion of HS1. In April and May 2018, bioremediation IM was implemented in the western portion of HS1. The bioremediation IM targeted chlorinated volatile organic compound (CVOC) concentrations greater than 10 times their Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Criteria (NADC). Bioremediation IM activities included the injection of a diluted solution of SRS®-SD (electron donor) and microbial culture (KB-1®) into the subsurface via direct push technology (DPT) injection down to 50 feet below land surface (ft bls).

Andrew Scott Starr↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗

Contractors Road Heavy Equipment Area (SWMU 055) 2021 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from January through December 2021. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with site-wide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; and - Semi-annual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act Corrective Action program. This report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under contract number 80KSC019F0096. The annual groundwater sampling results demonstrated that the footprint where chlorinated volatile organic compounds (VOC) are present above their State of Florida groundwater cleanup target levels (GCTLs) is not expanding overall. One non-chlorinated VOC (1,4-dioxane) is found above its GCTL at isolated points within the chlorinated VOC plume. The DPT groundwater investigation is being used to delineate the horizontal and vertical boundaries where chlorinated VOCs are present at levels above natural attenuation default concentrations. That data supports an evaluation of potential additional remedial actions. The potential for VI into the CRHE Area Office (K6-1996H) is evaluated by collected sub-slab vapor samples from four locations twice a year (once in the wet season and once in the dry season). The results for 2021 were all below the Environmental Protection Agency's vapor intrusion screening levels (VISLs) for both commercial and residential settings. The path forward for the site is to continue annual monitoring for chlorinated VOCs and 1,4-dioxane until additional remedies are implemented or the site is transitioned to long-term monitoring.

Contractors Road Heavy Equipment↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

CDISC Remote Design Method to Simulate Aircraft Interference Effects for the CATNLF Flight Test

The Crossflow Attenuated Natural Laminar Flow (CATNLF) flight test is an experimental evaluation of a laminar flow design approach that will be conducted on a small transonic wing-like model suspended from the Centerline Instrumented Pylon (CLIP) underneath an F-15 vehicle. The upcoming flight test is anticipated to provide experimental data that may be useful for transition prediction code calibrations or laminar flow computational studies. For the computational results to be reliable, relevant aerodynamics must be included in the simulations. It has been shown that the F-15 vehicle produces a notable aerodynamic influence on the CATNLF test article, and that removing the F-15 vehicle from the simulation significantly alters the laminar flow behavior. Because the F-15 vehicle is not a publicly-releasable geometry, if the CATNLF flight test dataset is to be widely used by the community, an alternative method to ensure that the CATNLF test article flight configuration aerodynamics is properly modeled is required. The objective of this research is to use the CDISC aerodynamic design tool to perform a remote design of a surface that would replicate the aerodynamic influence on the CATNLF test article. This new design approach, referred to as the Equivalent Loading via Interference Surface Effects (ELISE), is presented in this paper, including the details on the design setup and results. The ELISE design successfully reproduced the F-15 influence on the CATNLF test article, with predicted transition location within an average of 4% chord of the full flight configuration. An off-design assessment is included for small perturbations in Mach and sideslip angle that suggest the ELISE design can cover a reasonable range of expected flight conditions with the same geometry. This paper is intended to explain the design approach, as well as show results that can be expected when utilizing the ELISE design method.

CDISC↗

Application of the CATNLF Design Method to a Transonic Transport Empennage Using CDISC

A novel Crossflow Attenuated Natural Laminar Flow (CATNLF) design method has been developed to achieve laminar flow on aircraft empennage at transonic flight conditions. This approach has been applied to the design of a nonlifting vertical tail using CDISC, a knowledgebased aerodynamic design tool developed at the NASA Langley Research Center. A horizontal tail was also designed using an enhanced CATNLF design approach for low-lift components. CDISC was coupled with USM3D-ME, a Navier-Stokes computational fluid dynamics solver. Stability and transition software was used to determine the laminar extent on the surfaces. Results indicate laminar flow can be sustained at midcruise conditions to about x/c=0.40 on the vertical tail and as much as x/c=0.65 on the horizontal tail lower surface. Transonic longitudinal off-design analysis indicates minimal change in the laminar extent. However, nonzero sideslip angles at transonic conditions can cause premature transition relative to the midcruise condition.

Brent W. Pomeroy↗

CDISC Remote Design Method to Simulate Aircraft Interference Effects for the CATNLF Flight Test

The Crossflow Attenuated Natural Laminar Flow (CATNLF)flight test is an experimental evaluation of a laminar flow design approach that will be conducted on a small transonic wing-like model suspended from the Centerline Instrumented Pylon (CLIP) underneath an F-15 vehicle. The upcoming flight testis anticipated to provide experimental data that may be useful for transition prediction code calibrations or laminar flow computational studies. For the computational results to be reliable, relevant aerodynamics must be included in the simulations. It has been shown that the F-15 vehicle produces a notable aerodynamic influence on the CATNLF test article, and that removing the F-15 vehicle from the simulation significantly alters the laminar flow behavior. Because the F-15 vehicle is not a publicly-releasable geometry, if the CATNLF flight test dataset is to be widely used by the community, an alternative method to ensure that the CATNLF test article flight configuration aerodynamics is properly modeled is required. The objective of this research is to use the CDISC aerodynamic design tool to perform a remote design of a surface that would replicate the aerodynamic influence on the CATNLF test article. This new design approach, referred to as the Equivalent Loading via Interference Surface Effects (ELISE), is presented in this paper, including the details on the design setup and results. The ELISE design successfully reproduced theF-15 influence on the CATNLF test article, with predicted transition location within an average of 4% chord of the full flight configuration. An off-design assessment is included for small perturbations in Mach and sideslip angle that suggest the ELISE design can cover a reasonable range of expected flight conditions with the same geometry. This paper is intended to explain the design approach, as well as show results that can be expected when utilizing the ELISE design method.

CDISC↗