50 records · Page 3

Optimal Demand Response Incorporating Distribution LMP with PV Generation Uncertainty

The utilization of aggregated demand-side flexibility via demand response (DR) has become a promising pathway for the integration of renewable energy resources in power systems. Nowadays, there are several management strategies for DR such as the price-based transactive control strategies. However, many of such existing price-based control strategies neglect the physics and operational constraints of the underlying distribution networks when computing the price, raising concerns regarding their theoretical and practical values. This paper studies this issue and investigates optimal DR (ODR) by incorporating the distribution locational marginal price (DLMP). In particular, we discuss DR in connection with DLMPs and propose a multiperiod bilevel optimization problem to find the ODR strategy. Here, the objective is to minimize the peak load, load fluctuation, and payments of load aggregators. In addition, a robust bilevel ODR model is formulated to provide a robust ODR strategy while minimizing operating costs under the worst-case realization of uncertainties; this mitigates the impact of forecasting errors on renewable energy resources. Then, we propose an efficient solution approach by employing the Karush-Kuhn-Tucker conditions and strong duality. Simulation results are presented to illustrate the mutual impacts of the interaction between DR and DLMP and the benefits of the robust ODR strategy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk

The interaction between power systems and wildfires can be dangerous and costly. Distribution grids can be liable for the outbreak of wildfires during extreme weather. In wildfire-prone areas, investment planning should consider the impact of operational actions on wildfire-related uncertainties affecting line failure likelihood. Here, in this case, endogenous-based uncertainty modeling should comprise the backbone of the investment planning model viz-a-viz the inability of standard exogenous-based uncertainty modeling. Therefore, we propose a decision-dependent uncertainty (DDU) aware methodology to optimize investment portfolios for distribution systems, considering that high power-flow levels in high-threat areas can ignite wildfires and increase line failure probability. The methodology identifies the best combination of upgrades (new lines, hardening existing lines, and placing switching devices). Methodologically, we propose a two-stage distributionally robust planning optimization problem with DDU that considers the distribution system's multiperiod operation. The first stage determines optimal switching actions and line investments, and the second stage evaluates the worst-case expected operational cost under a DDU framework designed to account for the endogenous impact of power-flow levels and hardening investment decisions in the line failure probabilities. An iterative method is tailored to handle the problem and numerical experiments demonstrate a more prepared grid to deal with wildfire risk.

Power systems investment planning↗

Infrared spectroscopy of lattice vibrations in ZnTe/CdTe superlattices with quantum dots on the GaAs substrate with the ZnTe buffer layer

The results of the analysis of the infrared lattice reflectance spectra of multiperiod ZnTe/CdTe superlattices with CdTe quantum dots are reported. The samples are grown by molecular beam epitaxy on the GaAs substrate with the ZnTe buffer layer. Due to the large number of periods of the superlattices, it is possible to observe CdTe-like vibration modes in the quantum dots, i.e., the dislocation-free stressed islands formed during the growth due to relaxation of elastic stresses between the ZnTe and CdTe layers are markedly different in their lattice parameters. From the frequency shifts of the CdTe- and ZnTe-like vibration modes with respect to the corresponding modes in the unstressed materials, it is possible to estimate the level of elastic stresses.

36 MATERIALS SCIENCE↗

IR spectroscopy of lattice vibrations and comparative analysis of the ZnTe/CdTe quantum-dot superlattices on the GaAs substrate and with the ZnTe and CdTe buffer layers

A comparative analysis of multiperiod ZnTe/CdTe superlattices with the CdTe quantum dots grown by molecular beam epitaxy on the GaAs substrate with the ZnTe and CdTe buffer layers is carried out. The elastic-stress-induced shifts of eigenfrequencies of the modes of the CdTe- and ZnTe-like vibrations of materials forming similar superlattices but grown on different buffer ZnTe and CdTe layers are compared. The conditions of formation of quantum dots in the ZnTe/CdTe superlattices on the ZnTe and CdTe buffer layers differ radically.

36 MATERIALS SCIENCE↗

Room-temperature operation of quantum cascade lasers at a wavelength of 5.8 μm

The room-temperature generation of multiperiod quantum-cascade lasers (QCL) at a wavelength of 5.8 μm in the pulsed mode is demonstrated. The heterostructure of a quantum-cascade laser based on a heterojunction of InGaAs/InAlAs alloys is grown by molecular-beam epitaxy and incorporates 60 identical cascades. The threshold current density of the stripe laser 1.4 mm long and 22 μm wide is ~4.8 kA/cm{sup 2} at a temperature of 303 K. The maximum power of the optical-radiation output from one QCL face, recorded by a detector, is 88 mW. The actual optical-power output from one QCL face is no less than 150 mW. The results obtained and possible ways of optimizing the structure of the developed quantum-cascade lasers are discussed.

36 MATERIALS SCIENCE↗

ExaGO v2

ExaGO is a high-performance computing power systems modeling suite providing models for different power flow analyses. It supports forward AC power flow, multiperiod AC and DC optimal power flow analyses, contingency analysis, as well as stochastic optimal power flow analysis. ExaGO can use HiOp and Ipopt optimization engines. It supports Matpower and PSS/E input file formats. ExaGO v2 includes code from ExaGO 1.6.0.

Peles, Slaven [Oak Ridge National Laboratory (ORNL↗

Surface plasmon polariton pulse shaping via two-dimensional Bragg grating pairs

Abstract We demonstrate control over the spatial and temporal properties of surface plasmon polaritons (SPPs) launched from nanohole arrays in silver. The arrays provide wave vector matching to allow the conversion of free-space photons into counter-propagating SPPs. SPPs launched from multiple arrays interfere at well-defined spatial positions, and the interference fringes form an all-SPP periodic nano-optical grating which evolves in space and time as the SPPs propagate. The spatio-temporal characteristics of the optical grating can be tuned through various nanohole array parameters such as tilt angle, separation, and array width. In addition, we examine multiperiodic arrays (MPAs) consisting of arrays with different pitches placed adjacent to one another. This platform allows the temporal interference of SPPs with different central wavelengths to be tailored through the MPA geometric and structural parameters. The temporal interference serves as an encoded signal, whereby the frequency components can be controlled by the array properties.

79 ASTRONOMY AND ASTROPHYSICS↗

Time Dilated Bundt Cake Analysis of PV Output [Poster]

We present a novel method for modeling time-dependent statistics in the power signal generated by a photovoltaic (PV) system. Our white-box machine learning method is interpretable and auditable, based on principles of multiperiodic basis functions and convex optimization. Our proposed method of time dilating the daily signal to remove night time values results in a novel representation of PV power signals, evocative of a ‘Bundt cake’. The proposed model describes the marginal distribution of power output as a function of date and time. The resulting probabilistic model of a PV system can be used to perform a variety of tasks, and here, we demonstrate the application of clear sky detection.

14 SOLAR ENERGY↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Variable Stars Observed in the Galactic Disk by AST3-1 from Dome A, Antarctica

AST3-1 is the second-generation wide-field optical photometric telescope dedicated to time-domain astronomy at Dome A, Antarctica. Here, we present the results of an i -band images survey from AST3-1 toward one Galactic disk field. Based on time-series photometry of 92,583 stars, 560 variable stars were detected with i magnitude ≤16.5 mag during eight days of observations; 339 of these are previously unknown variables. We tentatively classify the 560 variables as 285 eclipsing binaries (EW, EB, and EA), 27 pulsating variable stars ( δ Scuti, γ Doradus, δ Cephei variable, and RR Lyrae stars), and 248 other types of variables (unclassified periodic, multiperiodic, and aperiodic variable stars). Of the eclipsing binaries, 34 show O’Connell effects. One of the aperiodic variables shows a plateau light curve and another variable shows a secondary maximum after peak brightness. We also detected a complex binary system with an RS CVn-like light-curve morphology; this object is being followed-up spectroscopically using the Gemini South telescope.

79 ASTRONOMY AND ASTROPHYSICS↗

γ DORADUS PULSATIONS IN THE ECLIPSING BINARY STAR KIC 6048106

We present the Kepler photometry of KIC 6048106, which is exhibiting the O’Connell effect and multiperiodic pulsations. Including a starspot on either of the components, light-curve synthesis indicates that this system is a semi-detached Algol with a mass ratio of 0.211, an orbital inclination of 73.°9, and a large temperature difference of 2534 K. To examine in detail both the spot variations and pulsations, we separately analyzed the Kepler time-series data at the interval of an orbital period in an iterative way. The results reveal that the variable asymmetries of the light maxima can be interpreted as the changes with time of a magnetic cool spot on the secondary component. Multiple frequency analyses were performed in the outside-eclipse light residuals after removal of the binarity effects from the observed Kepler data. We detected 30 frequencies with signal to noise amplitude ratios larger than 4.0, of which six ( f {sub 2}– f {sub 6} and f {sub 10}) can be identified as high-order (17 ≤ n ≤ 25) low-degree ( ℓ = 2) gravity-mode pulsations that were stable during the observing run of 200 days. In contrast, the other frequencies may be harmonic and combination terms. For the six frequencies, the pulsation periods and pulsation constants are in the ranges of 0.352–0.506 days and 0.232–0.333 days, respectively. These values and the position on the Hertzsprung–Russell diagram demonstrate that the primary star is a γ Dor variable. The evolutionary status and the pulsation nature of KIC 6048106 are discussed.

79 ASTRONOMY AND ASTROPHYSICS↗

Solving the Grid Optimization Competition Challenge 3 Problem

The Grid Optimization Competition Challenge 3 Problem posed a multiperiod security-constrained unit commitment problem with base-case AC power flow. The problem formulation includes binary unit commitment decisions, nonlinear AC power flow and balance, dispatchable loads, and linearized contingency real power flow, among other features. This talk will present a modified consensus ADMM algorithm, which splits the problem into mixed-integer linear and nonlinear components, as a heuristic solution method for this large-scale mixed integer nonlinear program. We will present some computational results from the competition for our implementation and reflect on the challenges of participating the grid optimization competition.

AC power flow↗

Beyond Price Taker: Optimizing Integrated Energy Systems Considering Market/Grid Interactions

Integrated Energy Systems (IES) combine two or more processes to increase the efficiency, flexibility of operation, and the overall reliability. However, analyzing IESs in volatile electricity markets is challenging, since the volatility in electricity prices makes the conventional levelized cost-type analysis less realistic. This work presents two approaches to address the challenge: price-taker and a surrogates-based approach for incorporating market interactions. The price-taker approach formulates a multiperiod optimization problem that takes the time-varying electricity prices into account, and solves the optimization problem to determine the optimal operational schedule that maximizes the chosen economic metric. This approach is successfully applied to investigate the performance of flexible power and hydrogen co-production systems. The market surrogates approach trains a machine learning model to predict the market behavior as a function of the characteristics of the IES. The trained surrogate model is used to optimize the design and operation of the given IES in an electricity market. This approach is demonstrated on a case study involving a nuclear power plant retrofitted with a low-temperature electrolysis unit to co-produce power and hydrogen.

beyond price taker↗

ARPA-E Grid Optimization (GO) Competition Challenge 2

The ARPA-E Grid Optimization (GO) Competition Challenge 2, from 2020 to 2021, expanded upon the problem posed in Challenge 1 by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment. Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. Specifically, the economic surplus, defined as the benefit of serving load minus the cost of generation, is being maximized. It was expected that the objective value of a given solution should be positive, representing economic gain, but negative objectives from poor solutions were possible. The two code submission feature of Challenge 1 was maintained. Additionally, Divisions 3 and 4 within the competition permitted on/off switching of transmission lines (Divisions 1 and 2 did not). After the initial release of the Problem Formulation on 7/20/2020, ARPA-E Director Lane Genatowski announced Challenge 2 on 9/12/2020. The final May 31, 2021, version of the Problem Formulation was 97 pages long with 299 equations. The Challenge proceeded with 2 non-prize Events and 2 prize Events. Teams receiving Challenge 1 FOA awards and prize money were required to use the prize money to fund their Challenge 2 efforts (Georgia Institute of Technology, Global Optimal Technology, Inc., Lawrence Livermore National Laboratory, Lehigh University, Northwestern University, Artelys, Columbia, Pearl Street Technologies, Pennsylvania State University, and University of Colorado Boulder). For more information on the competition and challenge 2 see the "GO Competition Challenge 2 Information" resource below. Challenge 1 and Challenge 3 information can be found in the resources linked below.

ACOPF↗