Engineering PapersSearch

SEARCH · Engineering Papers

Results for “mission variations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

514 records · Page 3

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

mission design

Electric Propulsion for Manned Missions

Electric propulsion is of interest for manned interplanetary missions, primarily because it offers the potential of delivering and returning relatively large payload fractions from the planets. This can be achieved because of the high specific impulse obtainable when the propellant is accelerated by electrical means rather than thermally, as in chemical and nuclear rockets.

Robert J Denington

An Initial Study of Using the 34-M Antenna for Lunar Mission Support

As a part of the long-range planning of future Mars and lunar missions, a feasibility study was made of a 34-m antenna system with differentially pointed multiple beams. The performance loss mechanisms of the differentially pointed multiple-beam systems were identified and quantified. Techniques that can significantly improve the multiple-beam system performance are identified. The goal is to determine the feasibility of using the 34-m antenna to support widely separated elements associated with lunar missions.

A Cha

Battery Definition for the Mars Environmental Survey Mission (MESUR) Pathfinder

Silver-zinc (Ag-Zn) battery technology has been baselined as the energy storage system for the MESUR mission. The mission profile will require the operation of this battery in a manner not usually seen for this technology. In particular, the combination of storage time followed by multiple cycles as a function of fluctuating temperatures and charge/discharge rates, and limited available time for charging has not been previously demonstrated.

Ag-Zn

Spacecraft Disposal Rosetta Stone: Parametric Tool for Orbital Lifetime, Disposal, and Cost Assessment

This Technical Memorandum documents a simplified, parametric method for evaluating spacecraft orbital lifetime, disposal compliance, and disposal-related cost impacts during early mission formulation and preliminary design. The method captures the dominant drivers of orbital decay—effective ballistic coefficient, operating altitude, and solar-cycle variability—using conservative bounding assumptions. Solar maximum conditions are used to bound achievable mission lifetime, while solar minimum conditions are used to bound disposal timelines and compliance with orbital debris requirements. A single tabulated dataset provides orbital lifetime under both solar-cycle extremes together with representative disposal ΔV required to ensure compliant disposal, enabling rapid assessment of disposal feasibility, cost sensitivity, and system-level impacts prior to committing to higher-fidelity analyses.

Orbital debris mitigation

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

JPL Experience with the Mars Pathfinder, Mission Simulation Battery

A summary of the Mars Pathfinder Battery is given. The battery survived 47 days at 25 deg. C; it survived a 7 month stand at 10 to -5 deg. C; it met and exceeded 40 ampere-hour capacity for EDL; it met the 30 cycle minimum for Mars surface operation; and the project power profile for MArs surface operation does not yield energy balance.

Perrone, Dave

Transient Studies of G-Induced Capillary Dryout and Rewet

A transient, one-dimensional numerical code is developed to model the liquid motion in an axial groove with square cross section. Axial variation in liquid level, shear stress and heat transfer between the groove wall and the liquid, evaporation and transient body forces are accounted for in the model. Dryout and rewet of the groove are allowed; the front location is determined numerically using conservation of mass and linear extrapolation. Several numerical test results are presented and discussed.

M K Reagan

Science questions for the Magellan continuing mission

Magellan has completed two mapping cycles around the planet Venus, returning high resolution synthetic aperture images and altimetry data of over 95 percent of the planet's surface. Venus is dominated by low lying volcanic plains with an impact crater population indicating an average surface age of about 500 million years. Highland regions either tend to be characterized by volcanic shield complexes and rifting or by complex ridged terrain. Successful as the primary mission of Magellan has been, significant scientific questions remain to be addressed with imaging and gravity data that will be collected over the next several years.

Saunders, R. S.

Preliminary Study of a Nuclear Rocket System for Manned Planetary Missions

The primary purpose of the NERVA nuclear rocket currently under development Once developed, is to demonstrate the feasibility of nuclear rocket propulsion. Once developed, it may have application in missions such as a manned lunar landing or space station supply. Unfortunately, it is too small for manned interplanetary missions. This being the case, it was decided to examine a second-generation nuclear rocket suitable for manned interplanetary flight in order to get an idea of component characteristics and problem areas. This examination is, in general, based on current technology and includes the graphite reactor concept, a nozzle fabricated from Inconel X tubing, and conventional turbopump blading and bearings. Some of the preliminary results of this examination are reported herein.

John H Povolny

Artemis II Mission Performance of the Orion Active Thermal Control System

The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Ellie Thurston

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. Programmatic lessons learned associated with risk management, contract oversight, and requirement definition during the fabrication and assembly are discussed. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Electric Propulsion

Standards Roadmapping for Mission Assurance in Commercial Spaceflight

This paper explores the application of established roadmapping approaches in standards planning and roadmap development to support mission assurance objectives. Mission assurance requires proactive planning across multiple domains including technical, schedule, cost, organizational, and policy. The intersection of these domains happens at the enterprise level, and enterprise systems engineering processes can systematically guide mission assurance activities, including development of standards roadmaps. Standards planning and development is a critical contributor to an effective mission assurance strategy, although standards are often developed and adopted reactively. Technology and standards planning is a key Enterprise Process Management activity, as identified by the Systems Engineering Body of Knowledge, and technology and standards roadmaps are strategic tools used to enable that process. Technology roadmapping has proven effective in guiding enterprise architecture and concept design, and standards planning supports enterprise requirements definition and management. However, there are limited methodologies to guide such standards planning activities. The application of technology roadmapping principles to standards planning formalizes the process and establishes a repeatable framework for standards development and integration. The framework development described in this paper fills a methodological gap by adapting proven roadmapping techniques to standards planning. Through a comparison of roadmapping methodologies and a case study analysis, this approach outlines a systematic process for anticipating and planning standards needs. In the case of developing a standards integration roadmap for NASA’s Office of Safety and Mission Assurance (OSMA), technology roadmapping principles were adapted to develop a roadmap framework to allow NASA and OSMA to define an agency-wide standards integration plan for commercial and industry safety and mission assurance standards. The outcome highlights key adaptations required for roadmapping in a standards context and describes the process steps to formalize a standards planning activity. The roadmapping framework adapted for standards development and integration enables more strategic, forward-looking standards planning and allows for better alignment between evolving capabilities and mission assurance requirements. Beyond its application to mission assurance, this methodology can be transferred to other domains requiring standards development, providing a systematic approach that integrates systems engineering principles into policy strategy and decision-making processes.

Enterprise Systems Engineering

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. A brief overview of three of SEP’s programmatic lessons learned are discussed: risk management, contract oversight, and requirement definition. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Mars Exploration

The Effects of Lunar Dust on EVA Systems During the Apollo Missions

Mission documents from the six Apollo missions that landed on the lunar surface have been studied in order to catalog the effects of lunar dust on Extra-Vehicular Activity (EVA) systems, primarily the Apollo surface space suit. It was found that the effects could be sorted into nine categories: vision obscuration, false instrument readings, dust coating and contamination, loss of traction, clogging of mechanisms, abrasion, thermal control problems, seal failures, and inhalation and irritation. Although simple dust mitigation measures were sufficient to mitigate some of the problems (i.e., loss of traction) it was found that these measures were ineffective to mitigate many of the more serious problems (i.e., clogging, abrasion, diminished heat rejection). The severity of the dust problems were consistently underestimated by ground tests, indicating a need to develop better simulation facilities and procedures.

James R Gaier

The Effects of Lunar Dust on EVA Systems During the Apollo Missions

Mission documents from the six Apollo missions that landed on the lunar surface have been studied in order to catalog the effects of lunar dust on Extra-Vehicular Activity (EVA) systems, primarily the Apollo surface space suit. It was found that the effects could be sorted into nine categories: vision obscuration, false instrument readings, dust coating and contamination, loss of traction, clogging of mechanisms, abrasion, thermal control problems, seal failures, and inhalation and irritation. Although simple dust mitigation measures were sufficient to mitigate some of the problems (i.e., loss of traction) it was found that these measures were ineffective to mitigate many of the more serious problems (i.e., clogging, abrasion, diminished heat rejection). The severity of the dust problems were consistently underestimated by ground tests, indicating a need to develop better simulation facilities and procedures.

James R Gaier