Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “measurement and verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

International Cooperative for Aerosol Prediction Workshop on Aerosol Forecast Verification

The purpose of this workshop was to reinforce the working partnership between centers who are actively involved in global aerosol forecasting, and to discuss issues related to forecast verification. Participants included representatives from operational centers with global aerosol forecasting requirements, a panel of experts on Numerical Weather Prediction and Air Quality forecast verification, data providers, and several observers from the research community. The presentations centered on a review of current NWP and AQ practices with subsequent discussion focused on the challenges in defining appropriate verification measures for the next generation of aerosol forecast systems.

Benedetti, Angela↗

Land Surface Reflectances from Geostationary Sensors

GEONEX is a processing pipeline that produces a suite of satellite land surface products using data streams from the latest geostationary (GEO) sensors including the GOES016/ABI and the Himawari-8/AHI. The suite, created collaboratively by scientists from NASA and NOAA, includes top-of-atmosphere (TOA) reflectances, land surface reflectances (LSRs), vegetation indices, LAI/fPAR, and other downstream products. As a key component of the GEONEX product processing, we have adapted the Multi-Angle Implementation of Atmospheric Correction (MAIAC) algorithm to produce LSRs from the TOA data. Because the algorithm depends on building "stacks" of images, we first run internal geo-registration checks to ensure geo-spatial accuracy and consistency of the input (L1B) data before transferring them from the geostationary projection into a tile system in geographic grids. Scan-time is inferred from metadata and applied to calculate the sun-sensor angles for each grid cell. The MAIAC algorithm is run to detect clouds/shadows, estimate aerosol optical thickness (AOT), perform atmospheric corrections, and generate LSRs. We have processed 18-months (from 2016/04 onward) of AHI data over East Asia and Oceania at a 10-minute time step and 10-months (from 2018/01 onward) of ABI data over North and South Americas at a 15-minute time step. As a verification measure, we compare the GEONEX (AHI/ABI) surface reflectances with the standard MODIS products (MOD09GA) and the MODIS MAIAC products over pixels that have similar sun-view geometries. The results indicate general linear relationships between GEONEX and corresponding MODIS LSRs. In particular, the RMSEs between GEONEX and MOD09 data are comparable to those between MOD09 and MODIS MAIAC products, suggesting that the uncertainties of GEONEX LSRs fall into an acceptable range. However, direct comparisons of LSRs over pixels with different sun-view angles are not as straightforward and require more modeling efforts to correct the directional effects. Evaluation of such angular influences on the downstream products (e.g., vegetation indices) is also under investigation.

Geostationary satellite; Remote Sensing; Atmospher↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluation of airborne lidar wind measurements

The verification of the Doppler lidar wind measurement is continued. The in situ measurements on a 500 meter tall tower are used to check the lidar determined winds (flight 4), followed by other tests applied to the extensive data sets of flights 19 and 21. After checking for possible software errors in the processing programs, the inconsistency was not solved. The source of the errors appears to be the uncertainty in the calculation of the contribution of the aircraft motion to the lidar measured line of sight speed. Possible techniques for estimating the aircraft motion errors from the aircraft data are investigated.

Carroll, J. J.↗

Verification of Dosimetry Measurements with Timepix Pixel Detectors for Space Applications

The current capabilities of modern pixel-detector technology has provided the possibility to design a new generation of radiation monitors. Timepix detectors are semiconductor pixel detectors based on a hybrid configuration. As such, the read-out chip can be used with different types and thicknesses of sensors. For space radiation dosimetry applications, Timepix devices with 300 and 500 microns thick silicon sensors have been used by a collaboration between NASA and University of Houston to explore their performance. For that purpose, an extensive evaluation of the response of Timepix for such applications has been performed. Timepix-based devices were tested in many different environments both at ground-based accelerator facilities such as HIMAC (Heavy Ion Medical Accelerator in Chiba, Japan), and at NSRL (NASA Space Radiation Laboratory at Brookhaven National Laboratory in Upton, NY), as well as in space on board of the International Space Station (ISS). These tests have included a wide range of the particle types and energies, from protons through iron nuclei. The results have been compared both with other devices and theoretical values. This effort has demonstrated that Timepix-based detectors are exceptionally capable at providing accurate dosimetry measurements in this application as verified by the confirming correspondence with the other accepted techniques.

Kroupa, M.↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Computer simulated building energy consumption for verification of energy conservation measures in network facilities

A computer program called ECPVER (Energy Consumption Program - Verification) was developed to simulate all energy loads for any number of buildings. The program computes simulated daily, monthly, and yearly energy consumption which can be compared with actual meter readings for the same time period. Such comparison can lead to validation of the model under a variety of conditions, which allows it to be used to predict future energy saving due to energy conservation measures. Predicted energy saving can then be compared with actual saving to verify the effectiveness of those energy conservation changes. This verification procedure is planned to be an important advancement in the Deep Space Network Energy Project, which seeks to reduce energy cost and consumption at all DSN Deep Space Stations.

Plankey, B.↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Energy Calculator for Simple Commercial Buildings

According to the EIA, simple commercial buildings account for 97% of total commercial building stock. However, most simple commercial buildings for example small- to mid-sized offices, retail, schools and warehouses do not benefit from the data-driven decision-making capabilities of whole-building energy modeling. The high cost of custom modeling limits the use of energy modeling of simple buildings for new construction or retrofit measures. Lack of tools providing helpful information on interactive savings estimates creates difficulties in meeting aggressive decarbonization and energy efficiency goals for simple building designers and utility program managers. This paper reviews a beta phase Simple Building Calculator with the ability to generate relatively accurate and interactive modeling results based on a limited but robust set of inputs. It can evaluate whole-building or single measure savings in new or existing buildings, compare measure package choices, or provide simplified performance modeling for energy codes and utility incentives. The tool combines physical (annual whole building prototype simulation) and statistical modeling techniques to predict annual energy performance. It supports a variety of building characteristics for envelope, HVAC, and lighting with parameters ranging from vintage to max tech configurations, as well as support for single-zone and simple multi-zone HVAC systems. The Simple Building Calculator was designed to provide immediate feedback for otherwise computationally intensive tasks like measure comparison, development of multiple measure package combinations, or verification that measures meet efficiency targets—all with the goal of providing a tool for quick annual energy simulation of simple commercial buildings.

Hart, Reid↗

Microgravity Acceleration Measurement System (MAMS) Flight Configuration Verification and Status

The Microgravity Acceleration Measurement System (MAMS) is a precision spaceflight instrument designed to measure and characterize the microgravity environment existing in the US Lab Module of the International Space Station. Both vibratory and quasi-steady triaxial acceleration data are acquired and provided to an Ethernet data link. The MAMS Double Mid-Deck Locker (DMDL) EXPRESS Rack payload meets all the ISS IDD and ICD interface requirements as discussed in the paper which also presents flight configuration illustrations. The overall MAMS sensor and data acquisition performance and verification data are presented in addition to a discussion of the Command and Data Handling features implemented via the ISS, downlink and the GRC Telescience Center displays.

Wagar, William↗

Pronghorn Porous Media Model Validation with Pressure Drop Measurements

The verification and validation (V &V) of Pronghorn is imperative to assert its accuracy when predicting the fluid velocity, temperature, and pressure in high temperature gas-cooled reactors. This paper focuses on the validation of the Pronghorn implementation of the incompressible and compressible Navier-Stokes equations using the pressure drop measurements in the engineering-scale pebble bed facility at the Texas A &M university.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pronghorn Porous Media Model Validation with Pressure Drop Measurements

The verification and validation (V&V) of Pronghorn is imperative to assert its accuracy when predicting the fluid velocity, temperature, and pressure in high temperature gas-cooled reactors. Pronghorn is a coarse-mesh, intermediate-fidelity, and multidimensional thermal-hydraulics (TH) code developed by the Idaho National Laboratory (INL). New pebble bed experiments are used to observe the details of the fluid motion and pressure drop in the porous bed under the reactor normal operation. This paper focuses on the validation of the Pronghorn compressible and incompressible Navier-Stokes equations using the pressure drop measurements performed at the engineering-scale pebble bed facility at the Texas A&M university (TAMU). Various pressure drop correlations and porosity functions are implemented in both Pronghorn and STAR-CCM+ to compare the pressure drop due to the combined viscous and inertial resistances in the porous bed. The correlations accounting for the near-wall effect are also utilized to observe if the pressure drop estimates can be improved. Pronghorn porous media models predict the pressure drop well relative to the STAR-CCM+ simulation results and 1D correlations, and both the finite element method (FEM) and finite volume method (FVM) perform accurately. Pronghorn models are also validated with the experimental measurements given the different Reynolds number ranges and specific aspect ratios. The likelihood of the statistical significance between the pressure drop measurements and specific correlations or simulations is low provided that the overlap of their confidence intervals is more than the half of a single arm. Several validation metrics are reasonable in regard to the similar studies from other literature. The precise average pebble bed porosity estimation has much impact on the pressure drop, and the Foumeny and Montillet (dense packing) models carry out the accurate pressure drop prediction by considering the near-wall effect.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Use of the Long Duration Exposure Facility's thermal measurement system for the verification of thermal models

Results are presented of the comparison between the Long Duration Exposure Facility (LDEF) Thermal Measurements Systems (THERM) recorded temperature data and the predicted values as calculated prior to the LDEF deployment. The postflight thermal model was verified and calculated temperature uncertainties were reduced to under + or - 18 F from the preflight uncertainties of + or - 40 F. The THERM consisted of 8 temperature sensors, a shared tape recorder, a standard LDEF flight battery, and an electronics control box. The temperatures were measured at selected locations on the LDEF structure interior during the first 490 days of flight and recorded for postflight analysis. After the recorder was recovered from space, the tape recorder was recovered and the data reduced for comparison to the LDEF predicted temperatures. By comparing the calculated values to the measured data, a verified thermal model that presents the best agreement with the THERM data was obtained. The THERM experiment provided an economical way of performing a postflight verification of the LDEF Thermal Model by recording a limited number of flight temperatures on typical locations of the LDEF structure.

Berrios, William M.↗

Use of the Long Duration Exposure Facility's thermal measurement system for the verification of thermal models

The Long Duration Exposure Facility (LDEF) postflight thermal model predicted temperatures were matched to flight temperature data recorded by the Thermal Measurement System (THERM), LDEF experiment P0003. Flight temperatures, recorded at intervals of approximately 112 minutes for the first 390 days of LDEF's 2105 day mission were compared with predictions using the thermal mathematical model (TMM). This model was unverified prior to flight. The postflight analysis has reduced the thermal model uncertainty at the temperature sensor locations from +/- 40 F to +/- 18 F. The improved temperature predictions will be used by the LDEF's principal investigators to calculate improved flight temperatures experienced by 57 experiments located on 86 trays of the facility.

Berrios, William M.↗

MARS 2020 Backshell Radiative Heating Measurement and Shock Tube Verification

In February 2021, the Perseverance rover was brought to the surface of Mars by the Mars 2020 mission. A feature of the Mars 2020 capsule was instrumentation to measure its entry, descent and landing (EDL) with the so-called Mars EDL Instrumentation 2 (MEDLI2) [1]. The MEDLI2 introduced, among other things, backshell instrumentation, including a broadband radiometer. The radiometer was mounted on the leeside of the vehicle next to thermocouple plugs and a heat flux gauge. The data returned by the leeside MEDLI2 heat flux gauge is largely analogous to that measured by the COMARS gauge flown on the ExoMars Schiaparelli [2] entry in that it is measuring heat flux in an area that is entirely dominated by radiative heating. The COMARS measurement provided excellent validation of backshell radiative heating models for Mars entry, albeit at a limited number of points [3]. The MEDLI2 heat flux gauge measurement effectively confirmed the quality of the prediction, extended over the full trajectory, as will be presented in this paper. The MEDLI2 radiometer,however, was blocked by ablation products and suffered a loss of half of its signal. The second backshell heat flux gauge installed on the windside of the vehicle was also well predicted, although the heating had both radiative and convective contributions. It was desired to reproduce the conditions of the Mars 2020 entry via ground testing in the Electric Arc Shock Tube (EAST) at NASA Ames. Tests to verify stagnation line heating were previously reported in EAST, confirming the presence of shock layer radiation as the major discrepancy in heatshield temperature modelling [4]. Therefore, tests for stagnation line heating were not repeated. Instead, the shock tube informed bias method [5, 6] was used to identify test conditions that may produce similarity to streamlines that pass around the backside of the vehicle and are responsible for the radiation observed at the two heat flux gauge locations. This method was used to identify a range of velocities and densities in the shock tube that are relevant for confirming the radiative environment encountered. This paper reports the results obtained in the 10 cm diameter EAST shock tube, corresponding to later trajectory points at ambient pressures of 1.1-2.0 Torr and velocities from 1.2-3.5 km/s. The test series employed two primary diagnostics: emission spectroscopy and tunable diode laser absorption spectroscopy (TDLAS). The emission spectroscopy performed broadband measurements of the radiative emission of the 4.3 and 2.7 m bands of CO2 at flight similar conditions, obtaining both spectral and spatial data corresponding to the relaxation behind the shock front. The TDLAS measured the absorption of several lines of CO and CO2 and obtains species number densities and temperatures as a function of time behind the shock front. This paper will review highlights of this test series and analyses of the emission and absorption data. While the datasets generally show good agreement with predictions, a few discrepancies and items for additional investigation are identified and will be discussed

Brett A Cruden↗

Observing Global Ocean Circulation From Space: The First Year's Results From the TOPEX/POSEIDON Mission

The joint U.S./France TOPEX/Poseidon satellite was launched on August 10, 1992, and became operational 42 days later. The major goal of the mission is to use a radar altimeter system for making precise measurements of the height of the sea surface for the study of the dynamics of large-scale ocean circulation, which is a key to understanding global climate change. Additionally, the data are used for studying ocean tides and marine geophysics. The radar altimeter also measures wave height and wind speed. The mission is being conducted to optimize the sea surface height measurements for a minimum of three years. The primary objective of the first six months of the mission was to calibrate and validate the mission's measurements. The verification results indicate that all the measurement objectives have been met...

Fu, L. -L.↗

Distributed Capacitive Sensor for Sample Mass Measurement

Previous robotic sample return missions lacked in situ sample verification/ quantity measurement instruments. Therefore, the outcome of the mission remained unclear until spacecraft return. In situ sample verification systems such as this Distributed Capacitive (DisC) sensor would enable an unmanned spacecraft system to re-attempt the sample acquisition procedures until the capture of desired sample quantity is positively confirmed, thereby maximizing the prospect for scientific reward. The DisC device contains a 10-cm-diameter pressure-sensitive elastic membrane placed at the bottom of a sample canister. The membrane deforms under the weight of accumulating planetary sample. The membrane is positioned in close proximity to an opposing rigid substrate with a narrow gap. The deformation of the membrane makes the gap narrower, resulting in increased capacitance between the two parallel plates (elastic membrane and rigid substrate). C-V conversion circuits on a nearby PCB (printed circuit board) provide capacitance readout via LVDS (low-voltage differential signaling) interface. The capacitance method was chosen over other potential approaches such as the piezoelectric method because of its inherent temperature stability advantage. A reference capacitor and temperature sensor are embedded in the system to compensate for temperature effects. The pressure-sensitive membranes are aluminum 6061, stainless steel (SUS) 403, and metal-coated polyimide plates. The thicknesses of these membranes range from 250 to 500 m. The rigid substrate is made with a 1- to 2-mm-thick wafer of one of the following materials depending on the application requirements glass, silicon, polyimide, PCB substrate. The glass substrate is fabricated by a microelectromechanical systems (MEMS) fabrication approach. Several concentric electrode patterns are printed on the substrate. The initial gap between the two plates, 100 m, is defined by a silicon spacer ring that is anodically bonded to the glass substrate. The fabricated proof-of-concept devices have successfully demonstrated tens to hundreds of picofarads of capacitance change when a simulated sample (100 g to 500 g) is placed on the membrane.

Toda, Risaku↗