Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “magnet test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Current Status of the High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are collaborating to construct a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing superconducting cables in high magnetic fields. This state-of-the-art facility will be situated at Fermilab and will provide capabilities comparable to EDIPO at PSI and FRESCA2 at CERN. The HFVMTF’s background magnetic field, reaching 15 T, will be generated by a magnet supplied by LBNL. The HFVMTF is a collaborative effort supported by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. It will serve as a vital testbed for superconducting HTS cables, subjecting them to high magnetic fields and a wide range of temperatures, benefiting both scientific communities. Additionally, this facility will play a key role in testing high-field superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Pro gram (MDP). These hybrid magnets, utilizing both LTS and HTS superconductors, are significant advancements toward achieving 18+ T dipoles for future hadron-hadron colliders. The presentation outlines the current status of the facility, covering aspects such as construction progress, cryostat designs, top and lambda plates, and systems for powering, quench protection, and monitoring.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Oakridge PPU Magnets: Results and Measurements

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab’s Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ∼3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)↗

Challenges in Continuous In-Field Critical Current Testing of High-Temperature Superconducting Tapes: Thermal and Mechanical Perspectives

High-temperature superconductors (HTS) are essential for ultra-high-field applications requiring exceptional current-carrying capacity under extreme conditions. However, systematic characterization of critical current in long-length conductors remains challenging due to complex thermal, electromag netic, and mechanical interactions during continuous testing. This study reports the development of a continuous in-field magnetization testing system for position-dependent critical current measurement in HTS tapes at 20 K under 7.5 T fields applied normal to the tape plane, enabling identification of performance-limiting regions that could compromise magnet stability. Here, the system addresses two fundamental challenges inherent to cryogenic reel to-reel testing. First, thermal management requires continuous cooling of a moving conductor to 20 K, achieved through liquid nitrogen precooling combined with a 100 W@20 K Gifford McMahon cryocooler. Second, screening currents in high fields generate Lorentz forces that induce twisting, bowing, and potential delamination. To mitigate these risks, we propose mechanical reinforcement and active current density suppression strategies. Numerical simulations using the stream function formulation reveal four primary failure modes: frictional heating at guide interfaces, unstable equilibria causing deformation, transverse current-induced stresses at guide transitions, and unsupported forces in vertical spans. Our mitigation strategies include PTFE coated guides to minimize friction, spring-loaded stabilization mechanisms to maintain tape alignment, controlled pre-heating using the liquid nitrogen thermal jacket to suppress critical current at stress points, and optimized guide positioning to minimize force accumulation. The experimental system is nearing completion, with testing planned to commence within two months. Preliminary validation at 65 K under 0.5 T demonstrates strong correlation between simulation-predicted mechanical instabilities and observed critical current variations during conductor tran sitions through the measurement region. These findings establish a robust foundation for quality assurance protocols essential to next-generation superconducting magnet applications.

Chen, Siwei [Princeton Plasma Physics Laboratory (↗

Multi-GeV FFA beam transport test at CEBAF

Jefferson National Lab plans an upgrade project to reach 22 GeV high polarization electron beam by using Fixed Field Alternating-gradient (FFA) magnets. The utilization of the FFA magnets for 10-22 GeV beam energy range is unexampled, therefore those magnets need an experimental validation before their full installation to form an arc in the Continuous Electron Beam Accelerator Facility (CEBAF). For this reason, JLAB is also considering the design of an FFA magnet test bench, i.e. a half or full FFA cell, that would be deployed in the current CEBAF in order to serve as the highest energy demonstration for the FFA field uniformity, permanent magnet resiliency with the beam as well as enabling beam optics measurements with the 5-11 GeV range highly polarized beams which closely resembles the full energy range of the 22 GeV upgrade. In this report, we present the status of the planned beamline for the FFA beam transport test at CEBAF.

Accelerator Physics↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

Preliminary modeling of triply periodic minimal surface (TPMS) structures using RELAP5-3D

With the United States Department of Energy (DOE)’s goal of quadrupling the nation’s nuclear energy supply by 2050, and with the Advanced Fuels Campaign pushing for new types of advanced reactor fuels and geometries, the need has arisen for new nuclear fuel designs. One such design is to swap out current nuclear fuel geometries in exchange for another type of geometry, called a Triply Periodic Minimal Surface (TPMS). TPMSs are self-supporting, infinitely repeating lattices—attributes that lend themselves well to additive manufacturing. These surfaces also possess enhanced heat transfer properties thanks to their internal area changes and large surface-area-to-volume ratios. Their drawback, however, is an increased pressure drop. Given the small amount of correlations and data (Reynolds numbers in the 2,000–8,000 range), and the minimal amount of experience so far obtained by modeling TPMS structures using 1D systems codes such as the Reactor Excursion and Leak Analysis Program (RELAP5-3D), further research into this topic was needed. Using data from the University of Wisconsin - Madison (UW), curve fits were created for both a Heat Transfer Coefficient (HTC) correlation and a Darcy friction factor empirical coefficient correlation. The curves’ coefficients and multipliers were then output and utilized in RELAP5-3D models of two upcoming experiments—Flow Loop for INFLUX Pressure drop (FLIP) and Microreactor Agile Non-nuclear Experimental Test (MAGNET)—aimed at increasing the available data for Reynolds numbers to the 16,000–36,000 range for TPMS structures. The models were run under the conditions utilized by a Computational Fluid Dynamics (CFD) analysis performed by another group at Idaho National Laboratory. Only CFD pressure drop values were obtained from the FLIP test, and those values showed that the RELAP5-3D models had a lower rate of pressure increase in comparison to the CFD values. In addition, there seemed to be a vertical shift upward in the pressure drop for both models whenever the TPMS porosity decreased, and the RELAP5-3D models showed a higher vertical shift in comparison to the CFD values. The MAGNET results did not correspond to any CFD or experimental results against which they could be compared, so they were instead compared against the proposed CFD input conditions. These values were then compared with each other to make sure the model seemed to be performing as expected, paving the way for future tests that can be run for the purpose of further analyses and comparisons. The pressure drop increased with temperature and mass flow rate independently. The temperature change would decrease with increasing mass flow rate and temperature, which was just as we expected based on the fact that the lower viscosity and decreased density would result in higher friction and churning losses. The last metric that was assessed was the enthalpy flow change, which increased with increasing mass flow rate and decreasing temperature.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

First Field Measurements of the 15 T Nb 3 Sn Dipole Demonstrator MDPCT1

Within the US Magnet Development Program (MDP) a 15 T Nb 3 Sn dipole was developed, to demonstrate a magnet design for a post-LHC pp Collider. Specifically, the magnet design is based on 60 mm aperture 4-layer shell-type coils, graded between the inner and outer layers to maximize the magnet performance. The cable in the two innermost layers has 28 strands 1.0 mm in diameter and the cable in the two outermost layers has 40 strands 0.7 mm in diameter. Both cables use RRP Nb3Sn wires produced by Bruker-OST. Magnet coils are surrounded by vertically-split thick iron laminations, con-nected by aluminum I-clamps, and a thick stainless-steel skin. The magnet was tested at the Vertical Magnet Test Facility (VMTF) at Fermilab. This paper reports the first results of magnetic measure-ments of the 15 T Nb 3 Sn dipole demonstrator including geometrical harmonics, coil magnetization and iron saturation effects. The ex-perimental data are compared with the magnetic calculations.

43 PARTICLE ACCELERATORS↗

A Metallurgical Inspection Method to Assess the Damage in Performance-Limiting Nb 3 Sn Accelerator Magnet Coils

The design and production of Nb 3 Sn-based dipole and quadrupole magnets is critical for the realization of the High-Luminosity Large Hadron Collider (HL-LHC) at the European Organization for Nuclear Research (CERN). Nb 3 Sn superconducting coils are aimed at enhancing the bending and focusing strengths of accelerator magnets for HL-LHC and beyond. Due to the brittle nature of Nb 3 Sn, the coil fabrication steps are very challenging and require very careful QA/QC. Flaws in the Nb 3 Sn filaments may lead to quenches, and eventually, performance limitation below nominal during magnet testing. A novel inspection method, including advanced non-destructive and destructive techniques, was developed to explore the root-causes of quenches occurring in performance-limiting coils. The most relevant results obtained for MQXF coils through this innovative inspection method are presented. This approach allows for precise assessment of the physical events associated to the quenches experienced b y magnet coils, mainly occurring under the form of damaged strands with transversely broken sub-elements. Coil-slice preparation, micro-optical observations of transverse and longitudinal cross-sections, and a deep etching technique of copper will be illustrated in the present work, with a focus on the results achieved for a CERN coil from a non-conforming quadrupole magnet prototype, and two coils fabricated in the US, in the framework of the Accelerator Upgrade Project (AUP) collaboration, from two different non-conforming quadrupole magnets, respectively. The results obtained through the proposed inspection method will be illustrated.

43 PARTICLE ACCELERATORS↗

Internal defect detection and characterization of samarium-cobalt sintered magnets by ultrasonic testing technique

Excessive quantities of samarium-cobalt (Sm-Co) magnet material are being scrapped needlessly due to a lack of understanding of inhomogeneity distribution and unacceptable internal defects. If there is a way to identify, locate, characterize and when needed separate the defective portions of magnet material, utilization can be increased and product quality improved. Further, the magnets’ magnetic and mechanical performance can be improved by reducing the occurrence of internal defects. This paper reports on a cost-effective and efficient nondestructive evaluation method based on an ultrasonic testing (UT) technique applied for detecting and characterizing internal defects in Sm-Co sintered magnets. Applying the UT technique will allow users to comprehensively analyze internal defects, such as inclusions, porosity, microcracks, and other structural irregularities, check for homogeneity and anomalous regions and give the locations of these internal anomalies and defects within the Sm-Co sintered magnets. The UT technique can also be applied to other rare-earth permanent magnets, such as sintered or die-upset neodymium-iron-boron (Nd-Fe-B) magnets. The UT technique can effectively guide quality control and acceptable product selection, in addition to optimizing the magnet alloy design and production processes. Therefore, it can facilitate the improvement of magnet manufacturing efficiency and machinability, reduce scrap, prolong service life, increase the use of what would be post-production waste, and enhance product reuse and recycling at end-of-life disposition.

36 MATERIALS SCIENCE↗

Quench Simulation and Validation for EIC Direct Wind Magnets

The Electron-Ion Collider (EIC), a new facility to be built in the United States at the U.S. Department of Energy’s Brookhaven National Laboratory in collaboration with Thomas Jefferson National Accelerator Facility-will be the only new particle collider in the U.S. for the next 10∼20 years. The EIC project will investigate the origin of mass and building blocks of the Universe. It will accelerate and collide beams of electrons with protons and nuclei. Unlike any collider that has ever existed before, both EIC’s particle beams will be polarized, meaning their spins will be aligned in a controlled way to allow for precision measurements. Different types of new superconducting magnets will be required near the interaction region (IR) of EIC. A 6-around-1 NbTi cable will be used for some of those new superconducting magnets. Given the relatively smaller conductors used for those direct wind magnets, the overall engineering current density will be 2–3 times higher in comparison to traditional collared superconducting magnets in other accelerator magnets. This is technically challenging and potentially represents high risks for quench protection. Here, in this paper we use different tools and methods for quench simulation for several EIC direct wind magnets. We also present results of a sensitivity study, exploring different material properties and Jc curves. This paper also discusses and validates the quench simulation results with measurement results from a small-scale serpentine magnet tested at BNL in October 2024.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Advancing 1D thermo-hydraulic tools for large cryogenic facilities

The Cryogenic Division at Fermilab develops large-scale cryogenic systems for particle accelerators and superconducting magnet test facilities. To support design and diagnostics, a Python-based code was created to calculate pressure drops in components such as valves and pipes. This paper presents recent enhancements to the code, including new heat transfer functions that improve the accuracy of thermal and hydraulic predictions. The first application models pressure and temperature changes in Proton Improvement Plant PIP-II relief pipes, aiding pipe sizing and protecting relief valves. The second example analyses heat load evolution in a pipe carrying sub-atmospheric helium, helping interpret temperature sensor data and understand gas return behavior to cold compressors. These improvements significantly expand the tool's capabilities, offering a practical resource for designing and troubleshooting cryogenic systems under dynamic thermal and flow conditions.

Beckwith, R. [Fermilab]↗

EMP Testing of NAE Magnetic Motor Starters

Sandia National Laboratories (SNL) performed a high-altitude nuclear electromagnetic pulse (HEMP) critical generation station component vulnerability test campaign with a focus on high-frequency, conducted early-time (E1) HEMP for the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER). This report provides vulnerability test results to investigate component response and/or damage thresholds to reasonable HEMP threat levels that will help to inform site vulnerability assessments, mitigation planning, and modeling calibrations. This work details testing of North American Electric (NAE) magnetic motor starters to determine the effects of conducted HEMP environments. Motor starters are the control elements that provide power to motors throughout a generating plant; a starter going offline would cause loss of power to critical pumps and compressors, which could lead to component damage or unplanned plant outages. Additionally, failed starters would be unable to support plant startup. Six industrial motor starters were tested: two 2 horsepower (HP) starters with breaker disconnects and typical protection equipment, two 20 HP starters with breaker disconnects, and two 20 HP starters with fused disconnects. Each starter was placed in a circuit with a generator and inductive motor matching the starter rating. The conducted EMP insult was injected on the power cables passing through the motor starter, with separate tests for the generator and motor sides of the starter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Challenges and Lessons Learned from fabrication, testing and analysis of eight MQXFA Low Beta Quadrupole magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some criteria and were disassembled. Lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this paper, we present a summary of: 1) the fabrication and test data of all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

43 PARTICLE ACCELERATORS↗

Re-assembly and test of COMB dipole magnet with STAR® wires

Fermilab is developing the Conductor on Molded Barrel (COMB) magnet technology that works well with round REBCO conductors. COMB-STAR-1 magnet based on STAR wire by AMPeers was fabricated and tested in liquid nitrogen in 2023. The magnet demonstrated >90 Ic retention in the coils (before/after winding). Even though the magnet was not originally designed for operation at lower than 77 K temperatures, it was decided to test it in liquid helium to: - check the instrumentation and the DAQ system; - check the ability to detect resistive transitions or quenches and to protect the magnet; - gather the information on possible magnet design chances and upgrades of the test facility for future testing of HTS magnets. The magnet was re-assembled with a larger iron yoke and the axial supports and tested in liquid helium in 2024 at Fermilab s Vertical Magnet Test Facility (VMTF). It was the first HTS magnet test at that facility ever.

Kashikhin, Vadim↗

Test Results of the First Pre-Series Quadrupole Magnets for the LHC Hi-Lumi Upgrade

The future high luminosity (Hi-Lumi) upgrade of the Large Hadron Collider (LHC) at CERN will include eight (plus two spares) 10.2 m-long Cryo-assemblies which will be components of the triplets for two LHC insertion regions. Each cold mass in the Cryo-assemblies will consist of two 4.2 m-long Nb 3 Sn high gradient quadrupole magnets, designated MQXFA, with aperture 150 mm and operating gradient 132.2 T/m, for a total of twenty magnets. Before assembling and testing the final cold masses at Fermilab, the component quadrupoles are being tested first at the vertical superconducting magnet test facility of the Superconducting Magnet Division (SMD) at Brookhaven National Laboratory (BNL), in superfluid He at 1.9 K and up to 18.0 kA, in accordance with operational requirements of the LHC. The tests of the first two full-length prototype quadrupole magnets MQXFAP1 and MQXFAP2 at BNL have been reported previously. The first two pre-series magnets, the first two that will be used in the LHC, have also now been tested. This paper reports on the quench test and training results of these two magnets. The test results of these magnets will be important for validating the final MQXFA design for operational magnets.

43 PARTICLE ACCELERATORS↗

Field Measurement Results of the 15 T Nb 3 Sn Dipole Demonstrator MDPCT1b

A 15 T Nb 3 Sn dipole with cos-theta-type coils was developed to demonstrate a possible magnet design for a post-LHC proton-proton Collider. The magnet has 4-layer coils with 60-mm aperture, and has graded current density between the inner and outer layers to maximize performance. The coils are constrained by vertically-split, thick iron laminations, connected by aluminum Iclamps, and a thick stainless-steel skin. The magnet was previously tested at the Vertical Magnet Test Facility (VMTF) at Fermilab with reduced pre-load, and achieved record 14.1 T fields at maximum current. Now the magnet has been reassembled with full pre-load and has been cryogenically retested at VMTF. We report here on the magnetic measurements results of these tests, including field strength, geometrical harmonics, coil magnetization, and iron saturation characteristics of the demonstrator.

43 PARTICLE ACCELERATORS↗