Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load restoration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Power Hardware-In-the-Loop Hydropower and Ultracapacitor Hybrid Testbed

Widespread deployment of a proof-of-concept technological solution for power system performance improvement can be accelerated through onsite demonstration and pilot projects. Digital real-time simulation with power hardware-in-the-loop in controlled lab environment is the precursor to de-risk the timely and efficient execution of field demonstration and pilot projects. However, the detailed process of development, characterization, and calibration of such high fidelity simulation testbed needs to be documented in a reproducible and publicly accessible manner to leverage across broader research and development communities. This paper presents such a laboratory testbed to study black start capability of a run-of-river hydro + ultracapacitor hybrid system. Beside the high-fidelity model of the islanded grid with hydropower unit, the testbed includes the energy storage, grid following inverter, and grid emulator hardware. Several aspects such as storage characterization, control and various parameter settings necessary to capture frequency transients during load restoration are described in a comprehensive manner, which led to an effective and timely execution of black start field demonstration with an actual hydropower plant.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Demand Estimation of Net Metered Loads for Microgrid Restoration

Microgrids can experience frequency instability while operating in the islanded mode due to a significant demand generation imbalance. Presence of net metered (NM) loads can further complicate accurate demand forecasting. For these loads only the net demand, difference of load demand and generation, is available. This paper presents the various stages observed during microgrid restoration with high penetration of NM loads. Disaggregation of demand and generation from the net metered time series is shown to be essential for accurate demand forecasting in each of these stages. A disaggregation approach is proposed using correlation in the net metered data. Time series analysis is then used to forecast the demand in each stage of the microgrid restoration process. A case study using demand and generation time series data from residential loads, shows that the proposed approach is significantly more accurate for demand forecasting than using only the net-metered time series.

demand forecasting, Microgrid, power system restor↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model engages a variety of customer types -- prosumers, flexible loads, critical/noncritical customers, and distributed generators -- as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their autonomy and privacy through an iterative approach to determine the optimal market price, while maintaining system-level power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model is developed to engage a variety of customer types - prosumers, flexible loads, critical/noncritical customers, and distributed generators - as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their autonomy and privacy through an iterative approach to determine the optimal market price, while maintaining systemlevel power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning: Preprint

Distributed energy resources (DER) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline MPC controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning

Distributed energy resources (DER) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline MPC controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning

Distributed energy resources (DERs) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Transactive Approach for Service Restoration Utilizing Customer Load Flexibility and Grid-Edge Resources: Preprint

This paper develops a transactive energy system model to restore electricity to customers in an isolated distribution system after an outage. The model engages a variety of customer types -- prosumers, flexible loads, critical/noncritical customers, and distributed generators -- as active participants in the restoration process. Unlike many existing transactive approaches, the proposed model is developed for service restoration and accounts for various customer types and their \textit{autonomy} and \textit{privacy} through an iterative approach to determine the optimal market price, while maintaining system-level power flow and voltage constraints. The advantages of the proposed approach are numerically validated on a modified IEEE 123-bus test system.

distributed energy resources↗

Resilient Distribution System Restoration with Equitable Load Shedding

A methodology is proposed for the improvement of electric distribution system resilience to high-impact, low-probability catastrophic events. An approach for dynamic network reconfiguration and coordination of distributed energy resources is introduced to assist in restoration efforts. The problem is formulated as a mixed-integer linear program that minimizes generation costs, the cost of lost load, and costs associated with equitable load shedding, while respecting operational limits of generation, loads, and the network. Constraints are imposed on binary switching variables to ensure equitable load shedding in emergency situations. Numerical validation of the proposed approach is conducted on an example distribution feeder, and case studies are performed to analyze the impact of various parameters in the optimization problem formulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning for Distribution System Restoration Using Distributed Energy Resources and Tie-Switches

Distributed energy resources (DERs), such as solar PVs and energy storage, can be used to restore distribution system critical loads after the extreme weather events to increase grid resilience. However, coordinating multiple DERs together with tie-switches for multi-step restoration process under renewable uncertainty is challenging. This paper proposes a deep reinforcement learning to control discrete actions of switching on/off tie switches and DERs for critical load restoration. The restoration problem is first cast into the Markov decision process suitable for DRL. Then, the original soft actor critic (SAC) method for continuous actions has been extended to handle discrete and continuous actions. Numerical comparison results with other stochastic optimization-based approaches on the modified IEEE 33-bus system show that the proposed method can achieve fast critical load restoration in the presence of substation power outage while maintaining system voltage limit throughout the restoration process.

active distribution systems↗

An iterative bidirectional gradient boosting approach for CVR baseline estimation

Here this paper presents a novel Iterative Bidirectional Gradient Boosting Model (IBi-GBM) for estimating the baseline of Conservation Voltage Reduction (CVR) programs. In contrast to many existing methods, we treat CVR baseline estimation as a missing data retrieval problem. The approach involves dividing the load and its corresponding temperature profiles into three periods: pre-CVR, CVR, and post-CVR. To restore the missing load profile during the CVR period, the method employs a three-step process. First, a forward-pass GBM is executed using data from the pre-CVR period as inputs. Subsequently, a backward-pass GBM is applied using data from the post-CVR period. The two restored load profiles are reconciled, considering pre-calculated weights derived from forecasting accuracy, and only the leftmost and rightmost points are retained. The newly restored points are then included as inputs for the subsequent iteration. This iterative procedure continues until the original load data in the CVR period is fully restored. We develop IBi-GBM using actual smart meter and Supervisory Control and Data Acquisition (SCADA) data. Our results demonstrate that IBi-GBM exhibits robust performance across various data resolutions and in different seasons and outperforms existing methods by achieving a 1-2% reduction in normalized Root Mean Square Error (nRMSE).

42 ENGINEERING↗

Demonstrating Distribution System Resiliency through Grid-Edge Microgrids, on a Multi-Site Networked Hardware-in-Loop Platform

With the increasing penetration of Distributed Energy Resources (DERs) at the grid-edge, power systems include more energy storage, remote switches, relays, voltage regulators, and other intelligent electronic devices (IED). Effective control of these grid-edge devices by using Advanced Distribution Management Systems (ADMS) can yield substantial improvements to the resiliency and power quality of distribution systems. In this paper, improvements to the resiliency of a distribution system are demonstrated using a multi-site evaluation environment consisting of a real-time Hardware-in-Loop (HIL) setup in which DERs and other IEDs are modeled; and an ADMS which monitors and is able to control the distribution system assets. The HIL model and the ADMS are located 2400 km away, with communication between the sites enabled by a data manager using Distributed Network Protocol 3 (DNP3), demonstrating the system's capabilities even over long distances. After a simulated transmission system failure in the HIL demonstration setup, DERs and other devices are operated to restore critical loads and node voltage profile (to within the 'nominal +/-5%' band) in the distribution system.

ADMS↗

Frequency Restoration of Grid-Forming Inverters in Pulse Load and Plug-in Events

This article presents a restoration technique using grid-forming inverters in an islanded microgrid during pulse load and plug-in events. In a microgrid powered by droop-controlled inverters, frequency is the variable that is accessible to all inverters for adjusting their power contributions. The problem is that the microgrid frequency deviates from its nominal value after a load change. The presented method enables the inverters to restore the frequency to the nominal value and regulate their bus voltage amplitudes. The frequency and voltage restorations are performed without communication while achieving the desired power-sharing between grid-forming inverters. The restoration is activated after detecting any active or reactive power changes. In this article, the dynamic model of an inverter equipped with enabled restoration paths is developed to verify the stability of the inverter controller under various conditions. The frequency and voltage restorations are examined during pulse load and plug-in events. Furthermore, this study is performed using a laboratory-scale islanded microgrid powered by two 208 V, 60 Hz, 5 kVA inverters.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Flexible Operation of Distributed Generation in Distribution Networks With Dynamic Boundaries

Distributed generators performing black start to form isolated microgrids offer a flexible and resilient solution to service restoration in distribution systems. Employing the dynamic microgrid concept, distributed generators can form isolated microgrids by changing their physical boundaries through smart switches and conventional circuit breakers. However, the flexibility of distributed generators has not been thoroughly investigated and utilised in existing works. To address this issue, this letter presents a new model to the reconfiguration formulation in active distribution networks considering different operation modes of distributed generators. Compared with the existing models, this study provides a new formulation supporting different DGs' operation modes and fully making use of their flexibility. Illustrative results on IEEE 34-test systems verify the effectiveness of the proposed model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Postdisaster Routing of Movable Energy Resources for Enhanced Distribution System Resilience: A Deep Reinforcement Learning-Based Approach

The deployment of movable energy resources (MERs) can be an effective strategy to restore critical loads to enhance power system resilience when no other energy sources are available after the occurrence of an extreme event. Since the optimal locations of MERs following an extreme event are dependent on system operating states (e.g., the loads at each node, on/off status of system branches, and so on), existing analytical and population-based approaches must repeat the entire analysis and calculation when the system operating states change. On the contrary, if deep reinforcement learning (DRL)-based algorithms are sufficiently trained with a wide range of scenarios, they can quickly find optimal or near-optimal locations irrespective of changes in system states. A deep Q-learning-based approach is proposed for optimal MER deployment to enhance power system resilience. MERs can be also utilized to complement other types of resources, if available. The proposed approach operates in two stages after the occurrence of extreme events. In the first stage, the distribution network is represented as a graph, and the network is then reconfigured using tie switches by using Kruskal’s spanning forest search algorithm (KSFSA). To maximize critical load recovery, the optimal or near-optimal locations of MERs are chosen in the second stage. Further, case studies on a 33-node distribution system and a modified IEEE 123-node system demonstrate the effectiveness of the proposed approach for postdisaster routing of MERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Load Switching Group based Feeder-level Microgrid Energy Management Algorithm for Service Restoration in Power Distribution System

This paper presents a load switching group based energy management system (LSG-EMS) for operating microgrids on a distribution feeder powered by one or multiple grid-forming distributed energy resources. Loads on a distribution feeder are divided into load switching groups that can be remotely switched on and off. The LSG-EMS algorithm, formulated as a mixed-integer linear programming (MILP) problem, has an objective function of maximizing the served loads while minimizing the total number of switching actions. A new set of topology constraints are developed for allowing multiple microgrids to be formed on the feeder and selecting the optimal supply path. Customer comfort is accounted for by maximizing the supply duration in the customer preferred service period and enforcing a minimum service duration. The proposed method is demonstrated on a modified IEEE 33-bus system using actual customer data. Simulation results show that the LSG-EMS successfully coordinates multiple grid-forming sources by selecting an optimal supply topology that maximizes the supply period of both the critical and noncritical loads while minimizing customer service interruptions in the service restoration process.

Hu, Rongxing↗