Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

CyTRICS Impact-Based Prioritization Process

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS prioritization process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS prioritization process was premised largely upon the impact which could result to an energy sector industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. CyTRICS has termed this process the “CyTRICS Impact-based Prioritization Process.” This paper describes the factors identified for use in the Impact-based Prioritization process and identifies the rationale for inclusion. During development, three National Laboratories piloted this prioritization process and generated prioritization scores for seven systems. Following the piloting of the process, laboratory subject matter experts (SME) validated that the numerical scores generated by the prioritization process were consistent with their knowledge of the impact that may occur should any of these systems be disrupted. The following document explains how to perform the prioritization process to generate prioritization scores for energy sector systems. After outlining assumptions required to conduct the process, it describes how to identify and elicit data which can be leveraged to evaluate a system and assign numerical values for each factor. The prioritization process uses different weights on different factors; rationale for each weight is included within the paper. Additionally, the paper includes some recommendations for future enhancements to prioritization, including lessons learned from developing and piloting the process. Finally, a comprehensive appendix includes example documents to be leveraged by those looking to execute the prioritization process.

99 GENERAL AND MISCELLANEOUS↗

Using Machine Learning to Predict Future Temperature Outputs in Geothermal Systems

Optimizing the power output, and economic value, of geothermal power plants over decades of operation is a major challenge in renewable energy. Optimizing the output requires the ability to predict the mass flow rates and the output temperatures of production wells based on the inputs of injection wells, as well as the time history of the system. Machine Learning (ML) that incorporates the known physics of geothermal systems is one possible solution to this challenge. In this work, we explore the ability of ML algorithms to predict future temperature outputs based on historical data. Considering the challenges with obtaining an empirical dataset from field data that is large enough to enable reliable ML, we propose an alternate approach: developing a high-fidelity reservoir model and using computational resources to build a dataset that enables ML. As a first step towards achieving this goal, we present preliminary results from applying ML to predict the temperature timeseries of simple modeled geothermal systems. We describe the application of relevant state-of-the-art ML approaches, such as the Long Short-Term Memory (LSTM) networks and Convolutional Neural Networks (CNN), to extract temporal structures in the model data. We assess the accuracy of the forecasts we obtain, compare the selected approaches, and share the lessons learned that would inform the process of training and utilizing ML algorithms for larger and more complex geothermal systems.

GEOTHERMAL ENERGY↗

Successful International Validation Test Shipment of the PIP-II HB650 Cryomodule Transportation System

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program has been executed to mitigate this risk. The centerpiece of this effort was the successful shipment, from FNAL to STFC-UKRI and back, of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Building on an escalating test transport program, the prototype cryomodule was shipped to the UK and back using realistic logistics, handling, instrumentation, and planning. The process of executing this shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

What We Learned From Analyzing 18 Million Rows of Commercial Buildings’ HVAC Fault Data

To achieve ambitious decarbonization goals it is critical that buildings operate to their full potential. Commercial HVAC systems, however, experience a wide range of operational faults, adversely affecting energy consumption, occupant comfort, and maintenance costs. Analytical tools such as fault detection & diagnostics (FDD) software identify and help diagnose these types of sensing, mechanical, or control-related faults. While significant energy savings has been documented for FDD, along with limited-scale studies on technical capabilities, there is a lack of empirical data on faults being reported by FDD tools. With FDD deployment accelerating significantly over the past decade there is an opportunity to gather and analyze data on commercial HVAC operational problems at an unprecedented scale. Such data could address many questions such as: [a] What faults are most commonly reported?; and [b] How does fault reporting vary by time of year and other possible drivers? A recent study into FDD fault reporting amassed the largest U.S. dataset of commercial HVAC air-side fault records, drawn from multi-year monitoring across over 60,000 pieces of HVAC equipment. The results of this study provide granular data on fault reporting for over 90 unique fault types. In this paper we provide an overview of the research process and highlight key findings and lessons learned. This study presents an extraordinary level of detail on FDD fault reporting characteristics across many climate zones and building types. Armed with these new insights, commercial building industry stakeholders can make better informed decisions when designing, configuring, and operating commercial HVAC systems.

Crowe, Eliot↗

Quantum biology revisited

Photosynthesis is a highly optimized process from which valuable lessons can be learned about the operating principles in nature. Its primary steps involve energy transport operating near theoretical quantum limits in efficiency. Recently, extensive research was motivated by the hypothesis that nature used quantum coherences to direct energy transfer. This body of work, a cornerstone for the field of quantum biology, rests on the interpretation of small-amplitude oscillations in two-dimensional electronic spectra of photosynthetic complexes. This Review discusses recent work reexamining these claims and demonstrates that interexciton coherences are too short lived to have any functional significance in photosynthetic energy transfer. Instead, the observed long-lived coherences originate from impulsively excited vibrations, generally observed in femtosecond spectroscopy. These efforts, collectively, lead to a more detailed understanding of the quantum aspects of dissipation. Nature, rather than trying to avoid dissipation, exploits it via engineering of exciton-bath interaction to create efficient energy flow.

59 BASIC BIOLOGICAL SCIENCES↗

Test Shipment of the PIP-II 650 MHz Transport Frame Between FNAL to STFC-UKRI

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program is in process to mitigate this risk. The centerpiece of this effort is the eventual shipment from FNAL to STFC-UKRI and back of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Most recently, a test shipment to the UK and back using a cryomodule analog was completed using realistic logistics, handling, instrumentation, and planning. The process of executing this test shipment, lessons learned, and plan moving forward will be presented here.

43 PARTICLE ACCELERATORS↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

This case study report focuses on the rebuild of a 469 kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix, in the U.S. Virgin Islands. The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. The St. Croix site provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers.

14 SOLAR ENERGY↗

Development of a half-meter scale Traveling-Wave (TW) SRF cavity

Traveling-wave technology can push the accelerator field gradient of niobium SRF cavity to 70MV/m or higher beyond the fundamental limit of 50~60MV/m in Standing-Wave regime. The 1st demonstration of TW resonance excitation in a proof-of-principle 3-cell SRF cavity in 2K liquid helium was successfully carried out at Fermilab in collaboration with Euclid Techlabs. In parallel with that, the RF design process of 0.5~1 meter scale TW cavity was begun at Fermilab for advancing TW technologies necessary more for future accelerator-scale one. Considering the physical dimensions of existing SRF facilities (for fabrication, processing, and cryogenic testing) and the lessons learned from the 3-cell, Fermilab has proposed a preliminary RF design of a half-meter scale TW SRF cavity. It consists of a 7-cell structure and a power feedback waveguide (WG) loop with new RF configurations to control TW resonance. Here we report a preliminary RF design, development plans, and activities.

43 PARTICLE ACCELERATORS↗

Sierra Center of Excellence: Lessons Learned

The introduction of heterogeneous computing via GPUs from the Sierra architecture represented a significant shift in direction for computational science at Lawrence Livermore National Laboratory (LLNL), and therefore required significant preparation. Over the last five years, the Sierra Center of Excellence (CoE) has brought employees with specific expertise from IBM and NVIDIA together with LLNL in a concentrated effort to prepare applications, system software, and tools for the Sierra supercomputer. This article shares the process we applied for the CoE and documents lessons learned during the collaboration, with the hope that others will be able to learn from both our success and intermediate setbacks. We describe what we have found to work for the management of such a collaboration and best practices for algorithms and source code, system configuration and software stack, tools, and application performance.

97 MATHEMATICS AND COMPUTING↗

Human-Centered and Explainable Artificial Intelligence in Nuclear Operations

Nuclear power plants in the United States are critical to the nation’s energy security, accounting for 20% of all electricity produced for the power grid. As energy needs grow, 100 gigawatts of additional nuclear power will be necessary by 2050, more than double the current capacity. Realizing this target requires cutting-edge technology like artificial intelligence (AI) and machine learning (ML) that can bring about significant increases in the level of automation. Human-centered AI (HCAI) is a combination of human-centered design (human factors, human-in-the-loop, etc.) with AI/ML to help produce an efficient and reliable system with full consideration for human engagement. This paper provides a comprehensive and novel discussion of HCAI considerations in nuclear power, introducing unique applications for the existing fleet as well as new advanced reactor designs. We include real-life use cases of AI applications to work management processes at nuclear power sites and highlight lessons learned for HCAI.

Hall, Anna↗

Ongoing Cooperative Engagement Facilitates Agile Pandemic and Outbreak Response: Lessons Learned Through Cooperative Engagement Between Uganda and the United States

Pathogens threaten human lives and disrupt economies around the world. This has been clearly illustrated by the current COVID-19 pandemic and outbreaks in livestock and food crops. Here, to manage pathogen emergence and spread, cooperative engagement programs develop and strengthen biosafety, biosecurity, and biosurveillance capabilities among local researchers to detect pathogens. In this case study, we describe the efforts of a collaboration between the Los Alamos National Laboratory and the Uganda Virus Research Institute, the primary viral diagnostic laboratory in Uganda, to implement and ensure the sustainability of sequencing for biosurveillance. We describe the process of establishing this capability along with the lessons learned from both sides of the partnership to inform future cooperative engagement efforts in low- and middle-income countries. We found that by strengthening sequencing capabilities at the Uganda Virus Research Institute before the COVID-19 pandemic, the institute was able to successfully sequence SARS-CoV-2 samples and provide data to the scientific community. We highlight the need to strengthen and sustain capabilities through in-country training, collaborative research projects, and trust.

59 BASIC BIOLOGICAL SCIENCES↗

Approach to Quality Assurance for Complex Environmental Modeling - 20407

A strong Quality Assurance (QA) program for complex environmental modeling is essential for regulatory and public acceptance and trust, but it does not have to be onerous. Neptune and Company, Inc. (Neptune) has developed a strong QA program that improves transparency, traceability, reproducibility, and therefore, defensibility and trust. Neptune's QA program has evolved over the past 27 years, transitioning from an ad hoc QA program, to a program that is currently Nuclear Quality Assurance-1 (NQA-1) compliant, and will soon be NQA-1/DOE approved for DOE EM modeling work. In addition, Neptune is a qualified laboratory assessor and qualified auditor for reference materials, a proficiency testing provider, and fully complies with the Environmental Protection Agency (EPA) QA program. Neptune's President and CEO, Kelly Black, was recently named the Chairperson of the International Organization for Standardization (ISO) Technical Committee 69, Application of Statistical Methods. A strong QA program has been developed for Neptune's radiological performance assessment (PA) program. Although pieces of their QA program are currently in development, their current program includes document control using Subversion, issue tracking and work flow tracking using JIRA, and transparency and traceability via a system of 'calc sheets' for documentation of all data analysis and modeling combined with 'check print' documentation of QA checking, and rigorous model testing and configuration control. All work is reviewed by an independent subject matter expert who is not associated with the collection and assembly of information, for an internal peer review. The program is enforced with a handful of Standard Operation Procedures (SOPs), Work Instructions, QA Project Plans (QAPPs), and Quality Management Plans (QMPs) that are updated frequently, with required annual training and acknowledgment. In addition, effective communication of modeling approaches and results to clients and stakeholders are integral to their QA program. Many of their models are built using the GoldSim modeling platform, for which their models are well-known for their level of transparency, documentation, and QA traceability. This level of QA is also applied to their process-level models. Neptune has taken some lessons learned from the extremely rigorous QA program required for the Yucca Mountain Project (YMP), and imposed the YMP requirements of complete traceability, transparency, and reproducibility, but avoided the inflexibility of a QA program that likely contributed to the suspect e-mails in 2005 that resulted in loss of trust in the YMP, and in nuclear waste disposal (and nuclear power) in general. There are far too many examples of loss of public trust due to poor QA that could have been easily avoided with a simple and straight-forward QA program combined with stakeholder engagement. The purpose of this paper is to share features of Neptune's Radiological Performance Assessment program QA program, and some of their QA related lessons learned over the past 27 years of QA for complex environmental modeling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: LMP Lessons Learned, Best Practices, and Frequently Asked Questions

This report captures lessons learned, best practices, and frequently asked questions with responses gleaned from the experiences of early adopters of the LMP RIPB process. Interviews were conducted in late 2019 with five non-LWR design organizations to gather their feedback on the application of the LMP RIPB process under real production conditions. The overall feedback from the reactor developers is that the LMP RIPB process can be successfully implemented with material benefits to the designer. As with any new processes, numerous challenges and questions were relayed by the designers. These challenges have been translated into lessons learned and best practices. Those two sections address both technical and organizational aspects of implementing the LMP RIPB process. Questions that were asked by multiple designers were turned into “frequently asked questions” and responses were provided by the LMP team.

42 ENGINEERING↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Subgrantee Administrative Training for the Weatherization Assistance Program

During Fiscal Years (FY) 2019 and 2020, the National Renewable Energy Laboratory (NREL) developed a series of online trainings for the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) to support Subgrantee administrative professionals. NREL and its subcontractor developed a series of online administrative trainings for WAP Subgrantees. In total, 29 administrative training courses were developed for WAP Subgrantees, focused on the following job roles: Weatherization Director, Fiscal Manage, Quality Assurance Manager. As of September 8, 2020, 2,840 users in nearly all WAP Grantee jurisdictions had registered with the learning management system and completed over 23,000 courses. This report provides a summary of the development process, rollout, and outreach to the WAP network, user response, and lessons learned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data Acquisition and Control for Marine Energy Devices: Cost Considerations

This document discusses the process involved with developing a data acquisition system specifically in the context of applications for Marine Renewable Energy (MRE) technologies however, much of what is presented is applicable to applications requiring data acquisition in general. The detail on the process is provided to highlight the critical steps and needs for a successful measurement campaign and to understand what can impact the overall outcome, cost, and schedule. The process presented is an amalgamation of best practices, lessons learned, recommendations, and prudent technical project planning and management. Data acquisition systems may be tightly integrated with or into the device under measurement and it often has its own dependencies that must be met. Therefore, early consideration and planning for the data acquisition system are stressed throughout this document.

13 HYDRO ENERGY↗