Communication of industry knowledge, best practices, and lessons learned in the space of cellulosic biofuels plant design, project development and execution and operations. Task 1 report

ExxonMobil Research and Engineering Company, via a technical services agreement, engages Idaho National Laboratory (INL) to provide general industry knowledge, best practices, and lessons learned in cellulosic ethanol plant design, project execution, and operations. INL will also assess publicly proposed cellulosic plant designs. The scope of work will be accomplished in three tasks: Task 1, Communicate industry knowledge; Task 2, Present high-level lessons learned; Task 3, Provide an engineering assessment of publicly proposed ethanol plant designs. This Task 1 report provides a high-level summary of general industry knowledge, best practice, and lessons learned in biomass feedstock logistics and integration with bioconversion processes.

09 BIOMASS FUELS↗

LED Lighting: Applying Lessons Learned from the CFL Experience

Light emitting diode (LED) technology has emerged as an exciting new lighting alternative with the potential for significant energy savings. There is concern, however, that white light LEDs for general illumination could take a long, bumpy course similar to another energy-efficient lighting technology – compact fluorescent lights (CFLs). Recognizing the significant potential energy-efficient lighting has to reduce U.S. energy consumption, Congress mandated in the Energy Policy Act of 2005 that the U.S. Department of Energy (DOE) develop Solid State Lighting (SSL) through a Next Generation Lighting Initiative. DOE’s first step was to analyze the market introduction of compact fluorescent lighting to determine what lessons could be learned to smooth the introduction of SSL in the United States (Sandahl et al. 2006). This paper summarizes applicable lessons learned from the market introduction of CFLs and describe how DOE and others are applying those lessons to speed the development and market introduction of energy-efficient LED lighting for general illumination applications. A description of the current state of LED technology and compares LEDs to incandescent, fluorescent, and halogen lights is also provided.

CFLs↗

Worldwide Overview of Lessons Learned from Decommissioning Projects

With an increasing number of radioactive facilities and reactors now reaching the end of their useful life and being taken out of service, there is a growing emphasis worldwide on the safe and efficient decommissioning of such plants. There is a wealth of experience already gained in decommissioning projects for all kinds of nuclear facilities. It is now possible to compare and discuss progress and accomplishments worldwide. In particular, rather than on the factual descriptions of projects, technologies and case histories, it is important to focus on lessons learned: in this way, the return of experience is felt to effectively contribute to progress. Key issues - inevitably based on a subjective ranking - are presented in this paper. Through the exchange of lessons learned, it is possible to achieve full awareness of the need for resources for and constraints of safe and cost-effective decommissioning. What remains now is the identification of specific, remaining issues that may hinder or delay the smooth progress of decommissioning. To this end, lessons learned provide the necessary background information; this paper tries to make extensive use of practical experience gained by the international community.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned from Radioactive Waste Storage and Disposal Facilities

The safety of radioactive waste disposal facilities and the decommissioning of complex sites may be predicated on the performance of engineered and natural barriers. For assessing the safety of a waste disposal facility or a decommissioned site, a performance assessment or similar analysis is often completed. The analysis is typically based on a site conceptual model that is developed from site characterization information, observations, and, in many cases, expert judgment. Because waste disposal facilities are sited, constructed, monitored, and maintained, a fair amount of data has been generated at a variety of sites in a variety of natural systems. This paper provides select examples of lessons learned from the observations developed from the monitoring of various radioactive waste facilities (storage and disposal), and discusses the implications for modeling of future waste disposal facilities that are yet to be constructed or for the development of dose assessments for the release of decommissioning sites. Monitoring has been and continues to be performed at a variety of different facilities for the disposal of radioactive waste. These include facilities for the disposal of commercial low-level waste (LLW), reprocessing wastes, and uranium mill tailings. Many of the lessons learned and problems encountered provide a unique opportunity to improve future designs of waste disposal facilities, to improve dose modeling for decommissioning sites, and to be proactive in identifying future problems. Typically, an initial conceptual model was developed and the siting and design of the disposal facility was based on the conceptual model. After facility construction and operation, monitoring data was collected and evaluated. In many cases the monitoring data did not comport with the original site conceptual model, leading to additional investigation and changes to the site conceptual model and modifications to the design of the facility. The following cases are discussed: commercial LLW disposal facilities; uranium mill tailings disposal facilities; and reprocessing waste storage and disposal facilities. The observations developed from the monitoring and maintenance of waste disposal and storage facilities provide valuable lessons learned for the design and modeling of future waste disposal facilities and the decommissioning of complex sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Identification, Dissemination and Implementation of Deactivation and Decommissioning Lessons Learned and Best Practices

Approximately $150 billion of work currently remains in the United States Department of Energy's (DoE's) Office of Environmental Management (EM) life cycle budget for U.S. projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and to develop a knowledge-management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. This paper discusses DoE's rationale for using lessons learned and best practices to improve safety and performance while reducing life cycle costs for Deactivation and Decommissioning (D and D) projects. It also provides an update on the Energy Facility Contractors Group's (EFCOG's) progress in supporting DoE's efforts. At this juncture the best practice efforts described are in developmental stages; however, the commitment to and the concrete nature of the work thus far is noteworthy in regard to improving the way D and D lessons learned and best practices are identified, disseminated and implemented across the DOE Complex.

99 GENERAL AND MISCELLANEOUS↗

Lessons Learned from the Decommissioning of Nuclear Facilities and the Safe Termination of Nuclear Activities. Outcomes of the International Conference, 11-15 December 2006, Athens, Greece

Full text of publication follows: decommissioning activities are increasing worldwide covering wide range of facilities - from nuclear power plant, through fuel cycle facilities to small laboratories. The importance of these activities is growing with the recognition of the need for ensuring safe termination of practices and reuse of sites for various purposes, including the development of new nuclear facilities. Decommissioning has been undertaken for more than forty years and significant knowledge has been accumulated and lessons have been learned. However the number of countries encountering decommissioning for the first time is increasing with the end of the lifetime of the facilities around the world, in particular in countries with small nuclear programmes (e.g. one research reactor) and limited human and financial resources. In order to facilitate the exchange of lessons learned and good practices between all Member States and to facilitate and improve safety of the planned, ongoing and future decommissioning projects, the IAEA in cooperation with the Nuclear Energy Agency to OECD, European Commission and World Nuclear Association organised the international conference on Lessons Learned from the Decommissioning of Nuclear Facilities and the Safe Termination of Nuclear Activities, held in Athens, Greece. The conference also highlighted areas where future cooperation at national and international level is required in order to improve decommissioning planning and safety during decommissioning and to facilitate decommissioning by selecting appropriate strategies and technologies for decontamination, dismantling and management of waste. These and other aspects discussed at the conference are presented in this paper, together with the planned IAEA measures for amendment and implementation of the International Action Plan on Decommissioning of Nuclear Facilities and its future programme on decommissioning.

99 GENERAL AND MISCELLANEOUS↗

Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned From a Decade of Design, Construction, and Operations of the Environmental Management Waste Management Facility in Oak Ridge, Tennessee - 12062

The Environmental Management Waste Management Facility (EMWMF) is the Department of Energy's on-site disposal facility for radioactive and hazardous waste generated by the CERCLA cleanup of the Oak Ridge Reservation (ORR). EMWMF recently completed building out to its maximum site capacity and is approaching a decade of operating experience. In meeting the challenges of design, construction, and operation of a mixed waste and low-level radioactive waste disposal facility within the framework of CERCLA, the Bechtel Jacobs Company LLC (BJC) project team learned valuable lessons that may be beneficial to other disposal facilities. Since project inception in 1998, the scope of the effort includes five regulator-approved designs, four phases of construction, and utilization of half of EMWMF's 1.63 M m{sup 3} of airspace during disposal of waste streams from across the ORR. Funding came from the broadest possible range of sources - privatization, American Recovery and Reinvestment Act, and two funding appropriation accounts. In the process of becoming the cost effective disposal outlet for the majority of the ORR cleanup waste, EMWMF overcame numerous challenges. Lessons learned were a key factor in achieving that success. Many of EMWMF's challenges are common to other disposal facilities. Sharing the successes and lessons learned will help other facilities optimize design, construction, and operations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peer Review Lessons Learned - DOE and Regulator Perspectives - 17140

The DOE NNSA Nevada Field Office (NFO) Underground Test Area (UGTA) Activity requires an external peer review to complete an extensive stage of site characterization and groundwater flow and contaminant transport model(s) development. The external peer review evaluates whether assumptions, methods, and conclusions derived from model(s) outputs are based on sound scientific principles and examines the scientific appropriateness of the model(s) outputs for informing the regulatory decision. The regulatory decision which is made by the Nevada Division of Environmental Protection (NDEP) is whether the model is acceptable to advance to the next UGTA strategy stage. Depending on the specific corrective action unit, the next stage is a Corrective Action Decision Document/Corrective Action Plan or Closure Stage. Three external peer reviews have taken place to date for the UGTA Activity. The first one resulted in a second phase of characterization and model development. The second external peer review resulted in advancement to the next UGTA strategy stage. While advancement to the next strategy stage was recommended by the third external peer review, a series of supplemental data collection and analyses and model simulation activities to address external peer review comments, including drilling three new wells and sampling multiple wells, occurred before moving into the next UGTA strategy stage. Twelve participants representing different aspects of the peer reviews (NDEP, NNSA/NFO, science advisors, presenters, and external peer reviewers) were interviewed to generate a combined lessons learned. Questions were asked regarding their experience with the process including panel selection, focused questions, presentations, interactions between UGTA Activity participants and reviewers, and results. The interview results were combined with the outcome of a published lessons learned report developed following the first external peer review. In general, those interviewed believed that all three external peer reviews were satisfactory and met the goals of the FFACO process. The following seven lessons learned were identified: (1) Ensure the panel is not biased and has a balance of technical and regulatory background; (2) Clearly state the review objective(s) at the start of the review; (3) Ask focused questions that support the peer review objective(s) but that do not ask the specific regulatory question; (4) Establish a peer review panel earlier in the strategy process; (5) Establish one point of contact for the entire review and conduct periodic meetings with the peer review panel to ensure focus remains on the review objective(s) and to ensure that pertinent information is provided; (6) Ensure that presentations are well coordinated, anomalous data or analysis results are addressed, and are focused on supporting the peer review objective(s); and (7) Carefully consider the panel's recommendations prior to embarking on a particular path forward. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned Concerning the Onsite Disposal Facility at the Fernald Preserve, Harrison, Ohio - 16176

An onsite disposal facility (OSDF) was constructed at the Fernald Preserve, Ohio, for the disposal of contaminated soil and debris generated during a Comprehensive Environmental Response, Compensation, and Liability Act site cleanup. Completed in October of 2006, the 30 ha facility contains 2.26 million m{sup 3} of waste materials, has a maximum height of approximately 19.8 m, and consists of eight individual cells. The dimensions of cells 1-7 are approximately 213 m x 122 m each, or 26,000 m{sup 2} (2.60 ha). The dimensions of cell 8 (the last cell constructed) are larger than those of the other cells (approximately 3.8 ha). Each cell was constructed with a leachate collection system (LCS) that collected rainwater and storm-water runoff during waste placement and prevented it from entering the underlying environment. Other engineered features include a multilayer composite liner system, a leak detection system (LDS) positioned beneath the primary liner, and a multilayer composite cover that was placed over each cell following the completion of waste-placement activities. The LCS and LDS layers are designed to convey (by gravity) any leachate/fluid that enters the system through pipes to the west side of the facility and into tanks located in valve houses. From there, leachate can be sampled and conveyed to treatment. Groundwater is monitored beneath each cell via monitoring wells. In November 2006, the US DOE Office of Legacy Management (LM) assumed responsibility for the long-term care and maintenance of the OSDF. LM has nine years of monitoring and maintenance experience with the Fernald OSDF. Monitoring data is reported each year in the Fernald Annual Site Environmental Report. The data collected and inspections conducted indicate that the facility is operating as designed. The past nine years has provided LM with the opportunity to evaluate how well many of the design and as-built features of the facility have functioned over time as they pertain to environmental monitoring, valve-house operation and maintenance, and leachate transmission. Lessons learned concerning the long-term care and maintenance of the OSDF at the Fernald Preserve are presented. The main lessons learned include the following: How bivariate plots can be used to address environmental monitoring challenges created by installing an engineered disposal facility in a location where contamination is above the background level but below cleanup standards. How valve-house design decisions can help to alleviate long-term monitoring challenges. How scale buildup can lead to leachate transmission issues. Some additional minor lessons learned are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication Lessons Learned of Transportation Packaging from the Perspective of a Design Authority - 20322

This paper presents lessons learned regarding fabricating packaging systems from the perspective of a design authority (DA). Capturing and implementing lessons learned is critical for an organization to reduce systematic project risk and thereby promote the likelihood of project success. This paper defines the design authority as the organization responsible for technical design, resolving technical design issues, quality assurance program, and maintenance of the packaging system license. A package system is defined as the packaging, its contents, and auxiliary equipment. Packages are certified by the NRC under 10 CFR 71[1] for transportation by ground. The following lessons learned subjects are presented in the paper: quality assurance, interpretation of drawing dimensional requirements, execution of manufacturing processes, hardware dimensional inspection, and leakage rate testing. All discrepancies presented in this paper have been resolved as described in the appropriate final data package. All described package systems are in compliance with their Safety Analysis Report (SAR) and certificate of conformance requirements. The intent of this paper is to identify opportunities for improving the outcome of future projects and to mitigate fabrication challenges proactively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned for the MICE Coupling Solenoid from the MICE Spectrometer Solenoids

Tests of the spectrometer solenoids have taught us some important lessons. The spectrometer magnet lessons learned fall into two broad categories that involve the two stages of the coolers that are used to cool the magnets. On the first spectrometer magnet, the problems were centered on the connection of the cooler 2nd-stage to the magnet cold mass. On the first test of the second spectrometer magnet, the problems were centered on the cooler 1st-stage temperature and its effect on the operation of the HTS leads. The second time the second spectrometer magnet was tested; the cooling to the cold mass was still not adequate. The cryogenic designs of the MICE and MuCOOL coupling magnets are quite different, but the lessons learned from the tests of the spectrometer magnets have affected the design of the coupling magnets.

42 ENGINEERING↗

Lessons Learned—Fluoride Exposure and Response

Laboratory research can expose workers to a wide variety of chemical hazards. Researchers must not only take personal responsibility for their safety but also inevitably rely on coworkers to also work safely. The foundations for protocols, requirements, and behaviors come from our history and lessons learned from others. For that reason, here, a recent incident is examined in which a researcher suffered hydrofluoric acid (HF) burns while working with an inorganic digestion mixture of aqueous HF (8%) and nitric acid (HNO 3 , 58%). HF education is critical for workers because delays in treatment, improper treatment, and delay of symptoms are all factors in unfavorable outcomes in case reports. Furthermore, while the potential severity of the incident was elevated due to bypassed engineered controls and lack of proper personal protective equipment, only minor injuries were sustained. We discuss the results of a causal analysis of the incident that revealed areas of improvement in protocols, personal protective equipment, and emergency response that could help prevent similar accidents from occurring. We also present simple improvements that anyone can implement to reduce the potential consequences of an accident, based upon our lessons learned.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

618-10 Burial Ground Trench Remediation and 618-10 and 618-11 Burial Ground Nonintrusive Characterization of Vertical Pipe Units Lessons Learned

A “lessons learned” is a noteworthy practice or innovative approach that is captured and shared to promote repeat application, or an adverse work practice/experience that is captured and shared to avoid reoccurrence. This document provides the lessons learned identified by the 618-10 Burial Ground trench remediation and the 618-10 and 618-11 Burial Ground nonintrusive characterization of the vertical pipe units (VPUs).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solid-State Lighting: Early Lessons Learned on the Way to Market

Analysis of issues and lessons learned during the early stages of solid-state lighting market introduction in the U.S., which also summarizes early actions taken to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned from MARVEL Initial Fabrication and Testing

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be amongst the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy, the reactor is intended to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is intent on publicly documenting key lessons learned along the way toward demonstration. Building on a 2024 report that focused on lessons learned from the design and project management phase, this 2025 edition focuses on findings from the MARVEL guard vessel fabrication and primary coolant apparatus test (PCAT) testing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MARVEL Lessons Learned – 2026 Edition Fabrication, Fuel Procurement, Quality Assurance, and Safety Basis

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗