Engineering PapersSearch

SEARCH · Engineering Papers

Results for “launch availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

An out-of-core thermionic-converter system for nuclear space power.

Reexamination of designs of nuclear thermionic space power systems with the converter outside the reactor in the perspective of recent advances in heat-transfer methods, materials, converter performance, and radiation design. The 40- to 70-kW(e) power range is treated. The configuration is found to meet the constraints of readily available launch vehicles. It allows for off-design operation including startup, shutdown, and possible emergency conditions; provides tolerance of failure by extensive use of modular, redundant elements; incorporates and uses heat pipes in a fashion that reduces the need for extensive in-pile testing of system components; and uses thermionic converters, nuclear fuel elements, and heat-transfer devices in a geometrical form adapted from existing incore thermionic system designs.

Breitwieser, R.

Communication system for the Viking mission to Mars

The Viking communications system discussed comprises a UHF relay link and an S-band communication link. The design of both links was guided by the design of the mission itself and its constraints. The most important of these are: the available launch opportunities; the effect of interplanetary distances on the power and bandwidth of the S-band link; weight; reliability and survival in the Martian environment; the up-link command philosophy; the landing problem; and the requirements for planetary quarantine and cleanliness. The Viking mission, with its orbits and trajectories, launch and landing sequences is described and illustrated.

Brown, I.

Rocketsonde repeatability of temperature and wind measurements as obtained from rocketsonde network systems

Variability of temperature and wind data obtained close in time is of particular concern since questions exist on whether this variability is due to natural atmospheric variability or arises from instrumental causes. Previously conducted repeatability tests of the U.S. Loki Datasonde instrument indicated rms differences of 1C in temperature and 3 mps in wind. The newer Super Loki Datasonde instrument reaches apogee 20 km higher (about 82 km) than the older system and attains a higher initial fall velocity, thus the heat exchange effects on the measuring components are different. Data were obtained from routine rocketsonde launchings, available in pairs, with time differences of 12 to 120 minutes. Mean values calculated over the altitude range of 30 to 70 km indicate than an rms difference of 1-2 C in temperature and of 3-4 mps in the zonal and meridional components exist. Additional computations in 5-km altitude layers suggest that rms differences do not exceed 3 C and 7 mps at the highest altitudes.

Schmidlin, F. J.

Space transportation - Options and opportunities

The development space transportation options to earth orbit and beyond are summarized. The performance of available launch systems is reviewed, including the Scout, Delta, Long March 3, Atlas Centaur, Ariane 3, Titan 34D, Proton, the Japanese M-3S-II, N-1, and H-1, and the Space Shuttle. Launch vehicle which are planned or are under development are examined, including the Conestoga, Industrial Launch Vehicle, Titan II, Delta II, H-II, Ariane 5, Titan IV, and the NASA/DOD Heavy Lift Launch Vehicle. Also, issues pertinent to the development of space transportation vehicles are considered, such as reliability, reduced unit cost, reduced lead time, and improved payload accommodations.

Loftus, J. P., Jr.

Lunar transit telescope lander design

The Program Development group at NASA's Marshall Space Flight Center has been involved in studying the feasibility of placing a 16 meter telescope on the lunar surface to scan the skies using visible/ Ultraviolet/ Infrared light frequencies. The precursor telescope is now called the TRANSIT LUNAR TELESCOPE (LTT). The Program Development Group at Marshall Space Flight Center has been given the task of developing the basic concepts and providing a feasibility study on building such a telescope. The telescope should be simple with minimum weight and volume to fit into one of the available launch vehicles. The preliminary launch date is set for 2005. A study was done to determine the launch vehicle to be used to deliver the telescope to the lunar surface. The TITAN IV/Centaur system was chosen. The engineering challenge was to design the largest possible telescope to fit into the TITAN IV/Centaur launch system. The telescope will be comprised of the primary, secondary and tertiary mirrors and their supporting system in addition to the lander that will land the telescope on the lunar surface and will also serve as the telescope's base. The lunar lander should be designed integrally with the telescope in order to minimize its weight, thus allowing more weight for the telescope and its support components. The objective of this study were to design a lander that meets all the constraints of the launching system. The basic constraints of the TITAN IV/Centaur system are given.

Omar, Husam A.

Lunar transit telescope lander design

The Program Development group at NASA's Marshall Space Flight Center has been involved in studying the feasibility of placing a 16 meter telescope on the lunar surface to scan the skies using visible/ Ultraviolet/ Infrared light frequencies. The precursor telescope is now called the TRANSIT LUNAR TELESCOPE (LTT). The Program Development Group at Marshall Space Flight Center has been given the task of developing the basic concepts and providing a feasibility study on building such a telescope. The telescope should be simple with minimum weight and volume to fit into one of the available launch vehicles. The preliminary launch date is set for 2005. A study was done to determine the launch vehicle to be used to deliver the telescope to the lunar surface. The TITAN IV/Centaur system was chosen. The engineering challenge was to design the largest possible telescope to fit into the TITAN IV/Centaur launch system. The telescope will be comprised of the primary, secondary and tertiary mirrors and their supporting system in addition to the lander that will land the telescope on the lunar surface and will also serve as the telescope's base. The lunar lander should be designed integrally with the telescope in order to minimize its weight, thus allowing more weight for the telescope and its support components. The objective of this study were to design a lander that meets all the constraints of the launching system. The basic constraints of the TITAN IV/Centaur system are given.

Omar, Husam A.

Human Factors Vehicle Displacement Analysis: Engineering In Motion

While positioned on the launch pad at the Kennedy Space Center, tall stacked launch vehicles are exposed to the natural environment. Varying directional winds and vortex shedding causes the vehicle to sway in an oscillating motion. The Human Factors team recognizes that vehicle sway may hinder ground crew operation, impact the ground system designs, and ultimately affect launch availability . The objective of this study is to physically simulate predicted oscillation envelopes identified by analysis. and conduct a Human Factors Analysis to assess the ability to carry out essential Upper Stage (US) ground operator tasks based on predicted vehicle motion.

Atencio, Laura Ashley

Use of Smoothed Measured Winds to Predict and Assess Launch Environments

This paper describes an approach which was used to predict Ares I-X launch vehicle structural airloads and controllability prior to launch. This prediction along with the proper application of protection for variations in key environment and trajectory parameters was used to predict the potential for the launch trajectory to stay within the integrated vehicle certification envelopes. This data was applied by the launch team as a key element of the launch day go/no-go recommendation. NASA s Space Shuttle and the heavy lift versions of the Evolved Expendable Launch Vehicles assessments require the use of a high fidelity wind measurement which limits the number of wind measurement sources which can be used for a pre-launch go/no-go assessment. The approach described in this paper has the potential to allow the pre-launch assessment team to use wind measurements from a number of additional sources which will enhance launch availability and also has the potential to improve mission assurance and enhance safety

Cordova, Henry S.

The Effect of Predicted Vehicle Displacement on Ground Crew Task Performance and Hardware Design

NASA continues to explore new launch vehicle concepts that will carry astronauts to low- Earth orbit to replace the soon-to-be retired Space Transportation System (STS) shuttle. A tall vertically stacked launch vehicle (> or =300 ft) is exposed to the natural environment while positioned on the launch pad. Varying directional winds and vortex shedding cause the vehicle to sway in an oscillating motion. Ground crews working high on the tower and inside the vehicle during launch preparations will be subjected to this motion while conducting critical closeout tasks such as mating fluid and electrical connectors and carrying heavy objects. NASA has not experienced performing these tasks in such environments since the Saturn V, which was serviced from a movable (but rigid) service structure; commercial launchers are likewise attended by a service structure that moves away from the vehicle for launch. There is concern that vehicle displacement may hinder ground crew operations, impact the ground system designs, and ultimately affect launch availability. The vehicle sway assessment objective is to replicate predicted frequencies and displacements of these tall vehicles, examine typical ground crew tasks, and provide insight into potential vehicle design considerations and ground crew performance guidelines. This paper outlines the methodology, configurations, and motion testing performed while conducting the vehicle displacement assessment that will be used as a Technical Memorandum for future vertically stacked vehicle designs.

Atencio, Laura Ashley

A Small Fission Power System for NASA Planetary Science Missions

In March 2010, the Decadal Survey Giant Planets Panel (GPP) requested a short-turnaround study to evaluate the feasibility of a small Fission Power System (FPS) for future unspecified National Aeronautics and Space Administration (NASA) science missions. FPS technology was considered a potential option for power levels that might not be achievable with radioisotope power systems. A study plan was generated and a joint NASA and Department of Energy (DOE) study team was formed. The team developed a set of notional requirements that included 1-kW electrical output, 15-year design life, and 2020 launch availability. After completing a short round of concept screening studies, the team selected a single concept for concentrated study and analysis. The selected concept is a solid block uranium-molybdenum reactor core with heat pipe cooling and distributed thermoelectric power converters directly coupled to aluminum radiator fins. This paper presents the preliminary configuration, mass summary, and proposed development program.

Mason, Lee

SLS Trade Study 0058: Day of Launch (DOL) Wind Biasing

SLS heritage hardware and legacy designs have shown load exceedances at several locations during Design Analysis Cycles (DAC): MPCV Z bending moments; ICPS Electro-Mechanical Actuator (EMA) loads; Core Stage loads just downstream of Booster forward interface. SLS Buffet Loads Mitigation Task Team (BLMTT) tasked to study issue. Identified low frequency buffet load responses are a function of the vehicle's total angle of attack (AlphaTotal). SLS DOL Wind Biasing Trade team to analyze DOL wind biasing methods to limit maximum AlphaTotal in the M0.8 - 2.0 altitude region for EM-1 and EM-2 missions through investigating: Trajectory design process; Wind wavelength filtering options; Launch availability; DOL process to achieve shorter processing/uplink timeline. Trade Team consisted of personnel supporting SLS, MPCV, GSDO programs.

Decker, Ryan K.

Three Dimensional Lightning Launch Commit Criteria Visualization Tool

Lightning occurrence too close to a NASA LSP or future SLS program launch vehicle in flight would have disastrous results. The sensitive electronics on the vehicle could be damaged to the point of causing an anomalous flight path and ultimate destruction of the vehicle and payload.According to 45th Weather Squadron (45 WS) Lightning Launch Commit Criteria (LLCC), a vehicle cannot launch if lightning is within 10 NM of its pre-determined flight path. The 45 WS Launch Weather Officers (LWOs) evaluate this LLCC for their launch customers to ensure the safety of the vehicle in flight. Currently, the LWOs conduct a subjective analysis of the distance between lightning and the flight path using data from different display systems. A 3-D display in which the lightning data and flight path are together would greatly reduce the ambiguity in evaluating this LLCC. It would give the LWOs and launch directors more confidence in whether a GO or NO GO for launch should be issued. When lightning appears close to the path, the LWOs likely err on the side of conservatism and deem the lightning to be within 10 NM. This would cause a costly delay or scrub. If the LWOs can determine with a strong level of certainty that the lightning is beyond 10 NM, launch availability would increase without compromising safety of the vehicle, payload or, in the future, astronauts.The AMU was tasked to conduct a market research of commercial, government, and open source software that might be able to ingest and display the 3-D lightning data from the KSC Lightning Mapping Array (LMA), the 45th Space Wing Weather Surveillance Radar (WSR), the National Weather Service in Melbourne Weather Surveillance Radar 1988 Doppler (WSR-88D), and the vehicle flight path data so that all can be visualized together. To accomplish this, the AMU conducted Internet searches for potential software candidates and interviewed software developers.None of the available off-the-shelf software had a 3-D capability that could display all of the data in a single visualization. The AMU determined there are two viable software packages that could satisfy the 45 WS requirement with further development and recommends the KSC Weather Office follow-up with both organizations to request development costs.

weather

ADDJUST-A View of the First 25 Years

Various technologies and innovative launch operations were developed during the 50 years of the Centaur upper stage—the first launch vehicle to use high performing liquid hydrogen fuel. One innovation was “ADDJUST”, which enabled the successful negotiation of upper level winds measured only hours before launch. Initial causes for its creation, development, and operation during countdown are detailed. Problem definition, wind measuring/monitoring process, pitch and yaw steering coefficient generation, loads analysis, angle of attack, major risks/concerns, and anecdotal recollections are provided. Launch availability improved from as low as 55 to 95 percent due to ADDJUST, which is still in use.

Upper level winds

Evolving Design Criteria for Very Large Aperture Space-Based Telescopes and Their Influence on the Need for Integrated Tools in the Optimization Process

NASA's Advanced Mirror Technology Development (AMTD) program has been developing the means to design and build the future generations of space based telescopes. With the nearing completion of the James Webb Space Telescope (JWST), the astrophysics community is already starting to define the requirements for follow on observatories. The restrictions of available launch vehicles and the possibilities of planned future vehicles have fueled the competition between monolithic primaries (with better optical quality) and segmented primaries (with larger apertures, but with diffraction, costs and figure control issues). Regardless of the current shroud sizes and lift capacities, these competing architectures share the need for rapid design tools. As part of the AMTD program a number of tools have been developed and tested to speed up the design process. Starting with the Arnold Mirror Modeler (which creates Finite Element Models (FEM) for structural analysis) and now also feeds these models into thermal stability analyses. They share common file formats and interchangeable results. During the development of the program, numerous trade studies were created for 4 meter and 8 meter monolithic primaries, complete with support systems. Evaluation of these results has led to a better understanding of how the specification drives the results. This paper will show some of the early trade studies for typical specification requirements such as lowest mirror bending frequency and suspension system lowest frequency. The results use representative allowable stress values for each mirror substrate material and construction method and generic material properties. These studies lead to some interesting relationships between feasible designs and the realities of actually trying to build these mirrors. Much of the traditional specifications were developed for much smaller systems, where the mass and volume of the primary where a small portion of the overall satellite. JWST shows us that as the aperture grows, the primary takes up the majority of the mass and volume and the established rules need to be adjusted. For example, a small change in lowest frequency requirement can change the cost by millions of dollars.

Space-based telescopes

Evolving Design Criteria for Very Large Aperture Space Based Telescopes and Their Influence on the Need for Integrated Tools in the Optimization Process

NASA's Advanced Mirror Technology Development (AMTD) program has been developing the means to design and build the future generations of space based telescopes. With the nearing completion of the James Webb Space Telescope (JWST), the astrophysics community is already starting to define the requirements for follow-on observatories. The restrictions of available launch vehicles and the possibilities of planned future vehicles have fueled the competition between monolithic primaries (with better optical quality) and segmented primaries (with larger apertures, but with diffraction, costs and figure control issues). Regardless of the current shroud sizes and lift capacities, these competing architectures share the need for rapid design tools. As part of the AMTD program a number of tools have been developed and tested to speed up the design process. Starting with the Arnold Mirror Modeler (which creates Finite Element Models (FEM) for structural analysis) and now also feeds these models into thermal stability analyses. They share common file formats and interchangeable results. During the development of the program, numerous trade studies were created for 4-meter and 8-meter monolithic primaries, complete with support systems. Evaluation of these results has led to a better understanding of how the specification drives the results. This paper will show some of the early trade studies for typical specification requirements such as lowest mirror bending frequency and suspension system lowest frequency. The results use representative allowable stress values for each mirror substrate material and construction method and generic material properties. These studies lead to some interesting relationships between feasible designs and the realities of actually trying to build these mirrors. Much of the traditional specifications were developed for much smaller systems, where the mass and volume of the primary where a small portion of the overall satellite. JWST shows us that as the aperture grows, the primary takes up the majority of the mass and volume and the established rules need to be adjusted. For example, a small change in lowest frequency requirement can change the cost by millions of dollars. The paper uses numerous trade studies created during the software development phase of the Arnold Mirror Modeler to illustrate the influences of system specifications on the design space. The future telescopes will require better performance, stability and documented feasibility to meet the hurdles of today's budget and schedules realities. AMTD is developing the tools, but the basic system planning mentality also has to adopt to the requirements of these very large and complex physical structures.

Arnold, William R., Sr.

NASA Exploration Mission 2 Mission Design

Exploration Mission 2 (EM-2) will be NASA’s first manned flight on the Space Launch System (SLS) and Orion Spacecraft. The mission has been changed from an SLS Block 1B configuration to Block 1. This change has necessitated a reexamination of the flight profile to determine what changes must be made in order to accommodate the reduced launch vehicle performance on the Block 1. Launch availability and orbital debris risk will be traded to find the best flight profile for both SLS and Orion.

Craig, A. S.

NASA Exploration Mission 2 Mission Design

Exploration Mission 2 (EM-2) will be NASA’s first manned flight on the Space Launch System (SLS) and Orion Spacecraft. The mission has been changed from an SLS Block 1B configuration to Block 1. This change has necessitated a reexamination of the flight profile to determine what changes must be made in order to accommodate the reduced launch vehicle performance on the Block 1. Launch availability and orbital debris risk will be traded to find the best flight profile for both SLS and Orion.

Craig, Scott

Navigating the Deployment and Downlink Tradespace for Earth Imaging Constellations

Distributed Spacecraft Missions (DSMs) are gaining momentum in their application to Earth Observation (EO) missions owing to their unique ability to increase observation sampling in spatial, spectral, angular and temporal dimensions simultaneously. DSM design includes a much larger number of variables than its monolithic counterpart, therefore, Model-Based Systems Engineering (MBSE) has been often used for preliminary mission concept designs, to understand the trade-offs and interdependencies among the variables. MBSE models are complex because the various objectives a DSM is expected to achieve are almost always conflicting, non-linear and rarely analytical. NASA Goddard Space Flight Center (GSFC) is developing a pre-Phase A tool called Tradespace Analysis Tool for Constellations (TAT-C) to initiate constellation mission design. The tool will allow users to explore the tradespace between various performance, cost and risk metrics (as a function of their science mission) and select Pareto optimal architectures that meet their requirements. This paper will describe the different types of constellations that TAT-C’s Tradespace Search Iterator is capable of enumerating (homogeneous Walker, heterogeneous Walker, precessing type, ad-hoc) and their impact on key performance metrics such as revisit statistics, time to global access and coverage. We will also discuss the ability to simulate phased deployment of the given constellations, as a function of launch availabilities and/or vehicle capability, and show the impact on performance. All performance metrics are calculated by the Data Reduction and Metric Computation module within TAT-C, which issues specific requests and processes results from the Orbit and Coverage module. Our TSI is also capable of generating tradespaces for downlinking imaging data from the constellation, based on permutations of available ground station networks - known (default) or customized (by the user). We will show the impact of changing ground station options for any given constellation, on data latency and required communication bandwidth, which in turn determines the responsiveness of the space system.

Nag, Sreeja