Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kWh”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Drive Electric Vermont Case Study

Currently in the United States, the heavy majority of plug-in electric vehicle (PEV) sales have been in highly conducive, selected, metropolitan areas; opposed to more broad distribution across the country. The U.S. Department of Energy’s EV Everywhere Grand Challenge is looking carefully at the barriers and opportunities that exist to enable small and midsize communities to partake in the PEV market and benefit from the economic and environmental advantages of PEVs. In order to gain insight into these challenges and barriers, DOE selected a success story (i.e., Drive Electric Vermont) as the subject of this case study, as the state of Vermont is tied with Detroit, Michigan in having the highest percentage of 2014 (most recent complete data) PEV registrations for cold weather U.S. cities and has seen more than a sixfold increase in charging stations over the last three years. The overall objective of this case study was to use the lessons learned from Drive Electric Vermont to determine what activities are most effective at encouraging acquisitions of PEVs and deployment of charging infrastructure in small to midsize communities, prioritizing and sequencing their implementation, identifying robust means for extrapolation, and applying this understanding to other small to midsize communities across the nation. The Drive Electric Vermont Program was formed in 2012 with a goal of increasing the use of electrified transportation in Vermont through policy development, education and outreach, and infrastructure development. The Drive Electric Vermont Program can be broadly broken into four components: (1) strategic planning/leadership, (2) stakeholder/partnership development, (3) education and outreach, and (4) incentives. The early phases of the program focused heavily on strategic planning, and stakeholder and partnership development, followed by a transition to education and outreach activities, charging infrastructure development, and grant and incentive programs that support charging infrastructure deployment and PEV purchases. Future plans include an additional round of consumer/dealer PEV incentives, continuation of the marketing campaign, and utilization of consumer surveys to develop new campaign themes and to optimize information distribution channels. In Vermont, the number of PEVs grew from 88 in July 2012 to 1,113 in January 2016, with a high percentage of the PEVs being plug-in hybrids (i.e., 865) versus all electric vehicles (i.e., 248). The most popular PEVs are Toyota’s Prius Plug-in and Ford’s C-Max Energi, which make up a combined 48% of the total PEV ownership in the state. The PEVs are predominantly clustered in four counties: Lamoille, Caledonia, Washington, and Chittenden. There is no evident correlation between community size and PEV penetration; however, over 70% of PEV owners are in communities of 1,000 to 10,000 people. On the other hand, there is a close correlation between where PEVs are registered and where they publically charge. The number of PEV charging stations in Vermont grew from 17 in January 2013 to 111 in January 2016, at a variety of charging venues, including retail, parking (short term and long term), workplace, dealerships, hotels, education, leisure, and hospitals. The vast majority of the charging venues contain Level 2 electric vehicle supply equipment (EVSE) solely or combined with Level 1 EVSE or direct current fast charging. The average power transferred per charging event for communities across Vermont ranged from 4.8 to 13.8 kWh for direct current fast charging and 1.0 to 11.9 kWh for and Level 2 EVSE. Over half the charging locations offer free charging. For those that do require payment, different pricing models are employed, including monthly memberships, hourly payment (where there is often a higher fee for the first hour followed by a lower hourly fee for the remaining hours), and energy use based on kWh drawn from the EVSE. There is no correlation between pricing models and community size and region, the strongest correlation is by network provider. Charging events across Vermont generally correlate with east-west bands of chargers (Figure ES-1) running from Burlington to Montpelier and in the area of Rutland.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluation of an LED Retrofit Project at Princeton University’s Carl Icahn Laboratory

The LED lighting retrofit at the Carl Icahn Laboratory of the Lewis-Sigler Institute for Integrative Genomics was the first building-wide interior LED project at Princeton University, following the University’s experiences from several years of exterior and small-scale interior LED implementation projects. The project addressed three luminaire types – recessed 2x2 troffers, cove and other luminaires using linear T8 fluorescent lamps, and CFL downlights - which combined accounted for over 564,000 kWh of annual energy, over 90% of the lighting energy used in the facility. The Princeton Facilities Engineering staff used a thorough process of evaluating product alternatives before selecting an acceptable LED retrofit solution for each luminaire type. Overall, 815 2x2 luminaires, 550 linear fluorescent luminaires, and 240 downlights were converted to LED as part of this project. Based solely on the reductions in wattage in converting from the incumbent fluorescent lamps to LED retrofit kits, the annual energy savings from the project was over 190,000 kWh, a savings of 37%. An additional 125,000 kWh of energy savings is expected from the implementation of occupancy and task-tuning control solutions, which will bring the total savings for the project to 62%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Efficient Clothes Dryer with IR Heating and Electrostatic Precipitator

The project goal was to develop a revolutionary energy saving technology for residential clothes drying. The team developed an IR (infrared) heating system and NESP (Nebulizer and Electro-Static Precipitator) for integration into a ventless clothes dryer. The proposed technology addresses two of the major inefficiencies in current electric vented dryers by providing effective energy transfer for the removal of the water and recapture of the vapor latent heat. The IR heaters operating in the mid wave (2.5-10um) are very efficient as they target the 3-micron peak absorption of the water molecule. This allows direct energy absorption, unlike conventional element heaters where heat is transferred by convection. The low power NESP removes water vapor from the exhausted stream and recaptures the latent heat in the ESP (Electro-Static Precipitator) exchanger section. This allows the warm dry air to be recirculated back into the drum for additional efficiency savings. The remaining majority of the dryer hardware stays the same. Summing the efficiency gain from the two subcomponents we anticipated the EF (Efficiency Factor) to exceed the goal of 4.04. EF is obtained by dividing the weight (lbs) of water removed by the energy (kWhr) used, where the test load size is 8.45 lbs of bone dry clothing wetted to 57.5% or 4.8lbs of water, and dried to a remaining moisture content of 2.5-5%. Additional benefits include not having to recondition (heat or cool) the large amounts of make-up air to replace the air exhausted by a vented dryer. It was anticipated that the NESP/heat exchanger would be the most challenging and highest risk element in the program. Therefore, the team focused their efforts during Phase 1 of the program on the design, construction, testing, and optimization of the NESP/heat exchanger. At the end Phase 1, the team compared the performance of the NESP/heat exchanger with the system level requirements and made a Go/No-Go decision on proceeding with the second portion of the program. Phase 2 of the program was structured to develop the IR heating system and then integrate it and the NESP/heat exchanger into a residential clothes dryer prototype for final testing. The proposed technology utilizes heat recovery which is known to have the biggest impact on dryer efficiency. The two current mainstream recovery approaches are air to air exchangers and heat pump condenser systems. Air to air exchanges can be very efficient but require large surface areas which are prone to fouling from uncaptured lint. Dryers based on heat pump condenser recovery systems have shown efficiency improvements of 20–60% and are commercially available. The issue with a heat pump condenser approach is the added cost, as typical prices are twice that of standard vented dryers and they are only available in small to medium capacities. The energy factor (EF) for these systems is 5.50 to 6.88 pounds/kWh compared to conventional dryers at 2.75 to 3.67 pounds/kWh. The efficiency improvements for the proposed technology come from the use of IR heating and the NESP. As the concept is in its infancy, and these improvements were difficult to predict without experimental data, assumptions were made based on available literature. IR radiant drying times, when compared to convection, are typically 30% less. This is a result of the fact that radiant energy heats directly and is absorbed at and below the surface, unlike convection heating, that must conduct the heat through the boundary film of air at the clothes surface and rely on wicking of the moisture to the surface. The second area of improvement comes from the NESP. The NESP operation is as follows: 1. Highly charged, micron sized, droplets of water are injected into the dryer exhaust by the Nebulizer. 2. These charged droplets attract water molecules and continue to grow in size, until losing their charge. During this process, latent heat is rejected back into the air stream. 3. The large droplets enter the ESP, where they are recharged and drawn to the ESP wall, to be extracted at the bottom of the ESP. The warm dry air is then recirculated back into the dryer. The proposed technology, at the time of the proposal submission was estimated to have an EF of 4.79. At program completion we have designed, built, tested, integrated and optimized the proposed technologies into a prototype “high efficiency” residential clothes dryer. Testing of the integrated prototype dryer provided insight into the technical effectiveness and economic feasibility of the proposed technologies. The program has the potential of greatly impacting energy savings. The predicted EF of the proposed technology is 4.79, yielding an energy savings of 42% when compared to conventional electric vented dryers. Given there are approximately 84 million dryers in the US consuming ~64 billion kWh per year, a net savings of 27 billion kWh per year or 0.092 quads could be realized. Since the dryer is not vented, make up air from the room is not needed, adding an additional savings of ~1kWh per load, or 23.8 billion kWh per year. In addition, it is envisioned that the proposed ESP, when successful, would potentially find applications in industrial and residential dehumidification.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Life Cycle Assessment of Future Photovoltaic Electricity Production from Residential-scale Systems Operated in Europe

The photovoltaics (PV) industry is growing rapidly to meet the increasing demand of green power. As the industry grows, the manufacturing processes and the material and energy efficiencies of PV cells and panels are improving. To assess the impacts of this trend, future scenarios of single-crystalline (single-Si, also known as mono-crystalline) silicon and cadmium-telluride (CdTe) PV systems installed on European residences were established. Assessment of the improvement potential of PV electricity-generating technologies such as single-Si and CdTe could be considered in long-term energy strategy decisions. This study aims to provide scenario-based information about the environmental per-formance of single-Si and CdTe PV modules produced and operated in the far future (2030 to 2050). The deployment application assessed considers European residential roofs. We made scenario-dependent projections of key parameters for single-Si and CdTe PV panels manufactured in 2050. The parameters included cell efficiency, module efficiency, wafer thickness, cutting losses, kerf losses, silver use, glass thickness and operational lifetime. This study combines developments for these parameters with projections of the environmental performance of electricity mixes in the main manufacturing countries/regions (European Union, China and the United States of America) and with projections of the environ-mental performance of basic material production (aluminium, copper, magnesium, nickel, pig iron, zinc, clinker and flat glass) in the far future. The three scenarios used in the assessment of future PV electricity were categorized into three classes: 'business as usual' (BAU), 'realistic improvement' (REAL) and 'optimistic improvement' (OPT). It estimates the current life cycle greenhouse gas emissions of single-Si PV electricity produced on the roofs of European residences to be approximately 80 grams CO2-equi-valent per kWh (g CO2-eq per kWh). Based on the projected changes to key parameters and the background system, life cycle greenhouse gas (GHG) emissions could be reduced to 65% (scenario BAU), 31% (scenario REAL) and 18% (scenario OPT) of that value in the far future. Results for other life cycle assessment (LCA) metrics are also assessed in this study such as: non-renewable cumulative energy demand, acidification potential, human toxicity potential, photochemical ozone creation potential, particulate matter formation potential, and land use. We calculated the total energy payback time (EPBT) and the non-renewable energy payback time (NREPBT) in the far future of single-crystalline silicon-based PV panels operated in Europe by dividing the estimate of non-renewable cumulative energy demand of PV electricity for the given scenario by the non-renewable cumulative energy demand of the scenario-dependent national and regional non-renewable residual electricity mixes. The study estimates the payback time could be reduced from 2.4 years today to 1.7, 1.2 and 1.2 years (scenarios BAU, REAL and OPT, respectively) in the far future, based on the assumptions and projections in the analysis. It finally estimates the current life cycle greenhouse gas emissions of CdTe PV electricity produced on the roofs of European residences to be approximately 30 g CO2-eq per kWh. Based on the projected changes to key parameters and the background system, life cycle GHG emissions could be reduced to 70% (scenario BAU), 44% (scenario REAL) and 32% (scenario OPT) of that value in the far future.

14 SOLAR ENERGY↗

On the Path to Energy Independence and a Clean Power Future – LED Lighting Retrofit and Solar Power Generation for the CTUIR Science and Engineering Laboratory and Public Transit Center (Rev.1)

This project supports the goals of the Energy Policy for the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) through the implementation of an energy efficiency measure (LED lighting retrofit) and construction of a fixed rack (stationary) ground-mounted solar photovoltaic (PV) array energy generation system. The project objective was to eliminate the net demand for grid-based utility energy at two tribal facilities: the CTUIR Field Station and the Public Transit Center (consisting of bus barn and maintenance shop buildings). A total of 332 lighting fixtures were retrofitted with high efficiency LEDs at the three buildings within the project scope. The solar PV array constructed adjacent to the Field Station (46330 Timine Way, Pendleton, OR 97801) has a nameplate capacity of 97.98 kW DC . The project was managed by staff from the CTUIR Energy & Environmental Sciences Program within the Department of Natural Resources and the final budget was $\$ $288,206. Data was collected during a 12 month monitoring period following construction of the aptly named Ántukš–Tín̓qapapt Solar PV Array and assessed to determine project results. During this time, the solar PV system generated 125,580 kWh of energy according to SolrenView solar PV system monitoring service. In contrast, the total realized utility energy and cost savings due to the project were estimated by comparing 24 months of consecutive utility billing data. Results of this comparison indicate that grid-based utility energy demand was reduced by 121,280 kWh, or roughly 80% of the total electricity consumed by both facilities. The cost savings associated with this energy demand reduction were $\$ $11,104 and a payback period of 5.7 years was estimated for recovering the CTUIR’s investment. However, it should be noted that these figures are not representative of the savings that could be obtained under normal, error-free (i.e. faultless) conditions. Several undesirable events occurred during the 12 month monitoring and evaluation period, the effects of which were quantified using available data so that results under a “Faultless Scenario” could be estimated. Annual energy and cost savings estimated for the Faultless Scenario were approximately 166,289 kWh and $\$ $15,225, respectively. These figures should prove to be more representative of the long-term average annual results achieved in response to the project and suggest a payback period closer to 4.5 years for the CTUIR.

14 SOLAR ENERGY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Port of New York and New Jersey Drayage Electrification Analysis

The National Renewable Energy Laboratory (NREL) evaluated the potential for drayage electrification in the Port of New York and New Jersey (PoNYNJ), with a focus on operators: Harbor Freight Transport (HF), Safeway Trucking (SWT), and International Motor Freight Inc (IMF). This report summarizes the data collection and electrification evaluation of all three drayage operators, includes detailed operational data, and identifies the performance requirements for battery electric tractors (BETs) and corresponding infrastructure operated within the context of PoNYNJ drayage operation. This report also details a methodology to evaluate opportunities, strategies, and challenges associated with future expansions of BETs in meeting PANYNJ emissions goals. The Port Authority has established a goal of achieving Net Zero carbon emissions by 2050 across all facilities, including from tenant and stakeholder sources such as drayage trucks. NREL used real-world performance data collected on the three PoNYNJ drayage operations, along with modeling and analysis tools to compare BET to diesel trucks. From March to July 2021, NREL collected 1Hz vehicle and engine data from 46 drayage trucks at the three operators totaling nearly 121,000 miles of operation, providing enough information to assess vehicle operations for electrification potential. A Future Automotive Systems Technology Simulator (FASTSim) electric truck powertrain model was validated using PoNYNJ data and scenarios were run to evaluate drayage truck electrification requirements over the real-world cycles. The first scenario examined BET viability with minimal changes to existing operations. This assumes the trucks charge when stopped for two hours or longer, have a functional battery size of 375 kWh, and can charge at 270 kilowatts (kW) average which are the specification of the commercially available Freightliner eCascadia. The second scenario looked at what operational, charging infrastructure, and BET technology changes would be needed to fully electrify. Finally, detailed analysis was run on charging rate structure to understand operational costs to the fleets. The studied drayage trucks averaged 5.1 MPG, spent roughly 9% of their energy at idle, and drove an average of 140 miles per day with a maximum daily distance of 573 miles. The FASTSim model results indicate a comparable BET would use 417 kWh of energy per day on average accounting for cargo weight, which is close to the full usable capacity of the eCascadia currently available on the market. Based on the daily average operating data, partial fleet electrification is possible with current technology. However, some specific days of operation would require over 1,600 kWh of energy due to longer distances traveled by the trucks and more intense operation. Trucks used for long distance and intense operation cannot be readily electrified with current technology without operational changes. Full adoption of BETs could reduce CO 2 emissions from these fleets by roughly 75% today, eliminating 76 metric tons of CO 2 (MTCO 2 ) per vehicle each year, which equates to 24,100 MTCO 2 per year for all three operators. Commercially available direct current fast chargers (DCFC) have charge rates up to 350 kW. Based on the average daily modeled energy use for each operator, current industrial rate structures, and the assumption of 350 kW peak charging, full drayage electrification would increase electricity consumption. In addition, peak demand usage would increase with unmanaged charging along with cost of electricity having a direct impact on cost per mile for electric vehicles. The resulting cost per mile for BETs along with comparable cost per mile for conventional diesel trucks are also examined at $\$$4.00 per gallon of diesel. It will be important for PANYNJ and the drayage operators within the PoNYNJ to consider these load impacts to their existing electrical infrastructure and devise operational strategies that avoid coincident charging of vehicles to mitigate demand charges. Despite these electricity cost increases, savings from reductions in diesel consumption will help offset the costs of this increased electricity consumption. However, prices of both electricity and diesel are subject to change based on various factors meaning the realized savings will vary over time. This shows BETs could be cost-competitive on an energy cost per mile basis for all scenarios while diesel is above $\$$3.00/gal. Further, if diesel prices dropped to the 15-year low of $2.33/gal, it would still be cost competitive to operate the EVs with electricity costs of 16.3 ¢/kWh or less.

33 ADVANCED PROPULSION SYSTEMS↗

Performance Evaluation and Costs of a Combined Ground Source Heat Pump and Solar Photovoltaic Storage System in an Extreme Cold Climate

This report outlines the effectiveness and economics of a ground source heat pump system installed together with solar photovoltaic panels and a battery storage system in a local community building situated in a cold climate. The community building is a tribal building located in Ruby, Alaska. Power from solar photovoltaic panels is supplemented by electricity purchased from the local community microgrid. A ground source heat pump was commissioned three years after the building was occupied, and supplements the heat generated by a boiler for both heat and domestic hot water. Data collected over the 2021-2022 heating season shows that the heat pump is providing heat to the building about 19% of the time with an average coefficient of performance of 2.68, ranging from below 2.5 in winter to above 3.0 in summer. The solar photovoltaic panels provided 4,700 kWh of power used within the building and an additional 2,900 kWh exported to the microgrid. The solar-produced power used within the building nearly offsets the estimated annual electrical draw of the heat pump of 5,700 kWh. Due to the very high costs for shipping and installation to remote locations, projects such as this, while not economically feasible if self-funded, can save the community an estimated $76,051 over a period of 20-years. Fuel prices increasing by more than 25%, or subsidized electricity prices decreasing by more than 25%, make the ground source heat pump a more viable option economically. Unsubsidized electricity prices increasing by 25% or more make a solar photovoltaic system with battery storage nearly economically viable after a 20-year period for commercial or school buildings that are not eligible for Alaska's Power Cost Equalization program.

14 SOLAR ENERGY↗

Life-cycle analysis results of geothermal systems in comparison to other power systems.

A life-cycle energy and greenhouse gas emissions analysis has been conducted with Argonne National Laboratory's expanded Greenhouse Gases, Regulated Emissions, and Energy Use in Transportation (GREET) model for geothermal power-generating technologies, including enhanced geothermal, hydrothermal flash, and hydrothermal binary technologies. As a basis of comparison, a similar analysis has been conducted for other power-generating systems, including coal, natural gas combined cycle, nuclear, hydroelectric, wind, photovoltaic, and biomass by expanding the GREET model to include power plant construction for these latter systems with literature data. In this way, the GREET model has been expanded to include plant construction, as well as the usual fuel production and consumption stages of power plant life cycles. For the plant construction phase, on a per-megawatt (MW) output basis, conventional power plants in general are found to require less steel and concrete than renewable power systems. With the exception of the concrete requirements for gravity dam hydroelectric, enhanced geothermal and hydrothermal binary used more of these materials per MW than other renewable power-generation systems. Energy and greenhouse gas (GHG) ratios for the infrastructure and other life-cycle stages have also been developed in this study per kilowatt-hour (kWh) of electricity output by taking into account both plant capacity and plant lifetime. Generally, energy burdens per energy output associated with plant infrastructure are higher for renewable systems than conventional ones. GHG emissions per kWh of electricity output for plant construction follow a similar trend. Although some of the renewable systems have GHG emissions during plant operation, they are much smaller than those emitted by fossil fuel thermoelectric systems. Binary geothermal systems have virtually insignificant GHG emissions compared to fossil systems. Taking into account plant construction and operation, the GREET model shows that fossil thermal plants have fossil energy use and GHG emissions per kWh of electricity output about one order of magnitude higher than renewable power systems, including geothermal power.

01 COAL, LIGNITE, AND PEAT↗

The Energy and Environmental Performance of Ground-Mounted Photovoltaic Systems—A Timely Update

Given photovoltaics’ (PVs) constant improvements in terms of material usage and energy efficiency, this work provides a timely update on their life-cycle energy and environmental performance. Single-crystalline Si (sc-Si), multi-crystalline Si (mc-Si), cadmium telluride (CdTe) and copper indium gallium diselenide (CIGS) systems are analysed, considering the actual country of production and adapting the input electricity mix accordingly. Energy pay-back time (EPBT) results for fixed-tilt ground mounted installations range from 0.5 years for CdTe PV at high-irradiation (2300 kWh/(m 2 ·yr)) to 2.8 years for sc-Si PV at low-irradiation (1000 kWh/(m 2 ·yr)), with corresponding quality-adjusted energy return on investment (EROI PE-eq ) values ranging from over 60 to ~10. Global warming potential (GWP) per kWh el averages out at ~30 g(CO 2 -eq), with lower values (down to ~10 g) for CdTe PV at high irradiation, and up to ~80 g for Chinese sc-Si PV at low irradiation. In general, results point to CdTe PV as the best performing technology from an environmental life-cycle perspective, also showing a remarkable improvement for current production modules in comparison with previous generations. Finally, we determined that one-axis tracking installations can improve the environmental profile of PV systems by approximately 10% for most impact metrics.

14 SOLAR ENERGY↗

Evaluating ZEBRA Battery Module under the Peak-Shaving Duty Cycles

With the recent rapid increase in demand for reliable, long-cycle life, and safe battery technologies for large-scale energy-storage applications, a battery module based on ZEBRA battery chemistry is extensively evaluated for its application in peak shaving duty cycles. First, this module is tested with a full capacity cycle consisting of a charging process (factory default) and a discharging process with a current of 40 A. The battery energy efficiency (discharge vs. charge) is about 90%, and the overall energy efficiency is 80.9%, which includes the auxiliary power used to run the battery management system electronics and self-heating to maintain the module operating temperature (265 °C). Generally, because of the increased self-heating during the holding times that exist for the peak shaving duty cycles, the overall module efficiency decreases slightly for the peak-shaving duty cycles (70.7–71.8%) compared to the full-capacity duty cycle. With a 6 h, peak-shaving duty cycle, the overall energy efficiency increases from 71.8% for 7.5 kWh energy utilization to 74.1% for 8.5 kWh. We conducted long-term cycling tests of the module at a 6 h, peak-shaving duty cycle with 7.5 kWh energy utilization, and the module exhibited a capacity degradation rate of 0.0046%/cycle over 150 cycles (>150 days).

25 ENERGY STORAGE↗

Impact of Aerosol and Cloud on the Solar Energy Potential over the Central Gangetic Himalayan Region

We examine the impact of atmospheric aerosols and clouds on the surface solar radiation and solar energy at Nainital, a high-altitude remote location in the central Gangetic Himalayan region (CGHR). For this purpose, we exploited the synergy of remote-sensed data in terms of ground-based AERONET Sun Photometer and satellite observations from the MODerate Resolution Imaging Spectroradiometer (MODIS) and the Meteosat Second Generation (MSG), with radiative transfer model (RTM) simulations and 1 day forecasts from the Copernicus Atmosphere Monitoring Service (CAMS). Clouds and aerosols are one of the most common sources of solar irradiance attenuation and hence causing performance issues in the photovoltaic (PV) and concentrated solar power (CSP) plant installations. The outputs of RTM results presented with high accuracy under clear, cloudy sky and dust conditions for global horizontal (GHI) and beam horizontal irradiance (BHI). On an annual basis the total aerosol attenuation was found to be up to 105 kWh m –2 for the GHI and 266 kWh m –2 for BHI, respectively, while the cloud effect is much stronger with an attenuation of 245 and 271 kWh m –2 on GHI and BHI. The results of this study will support the Indian solar energy producers and electricity handling entities in order to quantify the energy and financial losses due to cloud and aerosol presence.

54 ENVIRONMENTAL SCIENCES↗

High‐Performance Low‐Emissivity Paints Enabled by N‐Doped Poly(benzodifurandione) (n‐PBDF) for Energy‐Efficient Buildings

Abstract Low‐emissivity (low‐e) paints reduce radiative heat exchange between buildings and the environment, stabilizing indoor climates and lowering air conditioning demand. However, low‐cost, durable, and colored low‐e paints have yet to be demonstrated. Here, an approach is proposed using n‐doped poly(benzodifurandione) (n‐PBDF), a transparent organic conducting polymer, coated over colored commercial paints. This achieves a low thermal emissivity of 0.19 in the mid‐infrared spectrum, attributed to the efficient charge transport of delocalized π‐electrons in n‐PBDF structure. The reduction in thermal emissivity aids in regulating building temperatures by minimizing heat transfer between buildings and their surroundings across diverse climate zones and seasons. The n‐PBDF coating preserves the underlying paint's color due to its high visible transparency, meeting aesthetic requirements. It also shows strong stability in accelerated indoor weathering tests, ensuring long‐term performance. Simulations estimate annual HVAC energy savings of over 10,800 kWh in San Francisco and 5,500 kWh in Chicago for the typical mid‐rise apartments. The paint's versatility, scalability, and durability make it suitable for buildings, vehicles, and greenhouses, aiding urban heat island mitigation.

Liu, Xiaojie [School of Mechanical Engineering and↗

Life‐Cycle Assessment Considerations for Batteries and Battery Materials

Abstract Rechargeable batteries are necessary for the decarbonization of the energy systems, but life‐cycle environmental impact assessments have not achieved consensus on the environmental impacts of producing these batteries. Nonetheless, life cycle assessment (LCA) is a powerful tool to inform the development of better‐performing batteries with reduced environmental burden. This review explores common practices in lithium‐ion battery LCAs and makes recommendations for how future studies can be more interpretable, representative, and impactful. First, LCAs should focus analyses of resource depletion on long‐term trends toward more energy and resource‐intensive material extraction and processing rather than treating known reserves as a fixed quantity being depleted. Second, future studies should account for extraction and processing operations that deviate from industry best‐practices and may be responsible for an outsized share of sector‐wide impacts, such as artisanal cobalt mining. Third, LCAs should explore at least 2–3 battery manufacturing facility scales to capture size‐ and throughput‐dependent impacts such as dry room conditioning and solvent recovery. Finally, future LCAs must transition away from kg of battery mass as a functional unit and instead make use of kWh of storage capacity and kWh of lifetime energy throughput.

25 ENERGY STORAGE↗

Plasma‐catalytic synthesis of acrylonitrile from methane and nitrogen

Here, in this work, we demonstrate plasma-catalytic synthesis of hydrogen and acrylonitrile (AN) from CH 4 and N 2 . The process involves two steps: (1) plasma synthesis of C 2 H 2 and HCN in a nominally 1:1 stoichiometric ratio with high yield up to 90% and (2) downstream thermocatalytic reaction of these intermediates to make AN. The effect of process parameters on product distributions and specific energy requirements are reported. If the catalytic conversion of C 2 H 2 and HCN in the downstream thermocatalytic step to AN were perfect, which will require further improvements in the thermocatalytic reactor, then at the maximum output of our 1 kW radiofrequency 13.56 MHz transformer, a specific energy requirement of 73 kWh kg AN −1 was determined. The expectation is that scaling up the process to higher throughputs would result in decreases in specific energy requirement into the predicted economically viable range less than 10 kWh kg AN −1 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Potential annual daylighting performance of a high-efficiency daylight redirecting slat system

While the primary role of window attachments is often to moderate glare and solar heat gains, they are also able to provide additional daylight to interior spaces. For this purpose, a variety of daylight-redirecting window systems have been developed over the past 150 years. Fixed reflective systems (slats/light shelves) or prismatic systems that rely on total internal reflection work well under specific solar conditions, but generally sacrifice performance over a much wider range of incident solar angles and sky conditions. Dynamic systems - typically reflective slats - are more responsive to sun angles but have not been able to achieve optimal performance for glare and daylight redirection efficiency. A previous investigation into an adjustable, reflective blind concept first conceived of in the late 1970s showed promise but was not reduced to practice due to lack of adequate simulation and analysis tools. In this paper, this concept is further developed and its energy and visual comfort performance evaluated for four mid-latitude, temperate climates using ray-tracing simulation techniques. Overall, results indicate significant potential lighting energy savings when compared with conventional automated reflective blinds (2.1–4.9 kWh/(m 2 ·a), or 14%–42%, depending on climate and orientation) or, especially, manually-operated matte white venetian blinds (1.4–7.9 kWh/(m 2 ·a), or 9%–54%, depending on climate and orientation), while maintaining acceptable or better visual comfort conditions throughout the interior space.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of size reduction equations for calculating power input for grinding pine wood chips using hammer mill

Size reduction is an unavoidable operation for preparing biomass for biofuels and bioproduct conversion. Yet, there is considerable uncertainty in power input requirement and the uniformity of ground biomass. Considerable gains are possible if the required power input for a size reduction ratio is estimated accurately. In this research three well-known mechanistic equations attributed to Rittinger, Kick, and Bond available for predicting energy input for grinding pine wood chips were tested against experimental grinding data. Prior to testing, samples of pine wood chips were conditioned to 11.7% wb, moisture content. The wood chips were successively ground in a hammer mill using screen sizes of 25.4 mm, 10 mm, 6.4 mm, and 3.2 mm. The input power and the flow of material into the grinder were recorded continuously. The recorded power input vs. mean particle size showed that the Rittinger equation had the best fit to the experimental data. The ground particle sizes were 4 to 7 times smaller than the size of installed screen. Geometric mean size of particles were calculated using two methods (1) Tyler sieves and using particle size analysis and (2) Sauter mean diameter calculated from the ratio of volume to surface that were estimated from measured length and width. The two mean diameters agreed well, pointing to the fact that either mechanical sieving or particle imaging can be used to characterize particle size. In conclusion, specific energy input to the hammer mill increased from 1.4 kWh t –1 (5.2 J g –1 ) for large 25.1-mm screen to 25 kWh t –1 (90.4 J g –1 ) for small 3.2-mm screen.

09 BIOMASS FUELS↗

Maximizing energy efficiency in wastewater treatment plants: A data-driven approach for waste heat recovery and an economic analysis using Organic Rankine Cycle and thermal energy storage

Maximizing energy efficiency through waste heat recovery (WHR) processes is crucial for sustainable and ecofriendly operations across multiple industries, notably in wastewater treatment plants (WWTPs). This work proposes a comprehensive approach for assessing the WHR feasibility in WWTPs, structured in two main objectives. Firstly, an Artificial Neural Network (ANN) model is developed to accurately predict WHR based on operational data, including biogas temperature, biogas pressure, daily production in kWh, and WHR values in kWh th . The second objective focuses on economically evaluating the WHR feasibility based on the estimated WHR values obtained by the ANN model, and then realistically assessing the economic feasibility of integrating the Organic Rankine Cycle (ORC) and Seasonal Thermal Energy Storage (STES) systems. With an application to the As-Samra WWTP located in Jordan, the developed ANN model demonstrates promising results in the validation phase, with a root mean square error (RMSE) of 2206 kWh/day, a mean absolute error (MAE) of 1674 kWh/day, and an R-squared (R 2 ) value of 68%. On the other hand, the economic analysis reveals that an optimal ORC system of 412.14 kW e capacity yields a Net Present Value (NPV) of 2.09 million US dollars, a Levelized Cost of Energy (LCOE) of 0.0749 USD/kWh, a Payback Period (PBP) of 4.8 years, and annual revenues of 428 kUSD. This work also investigates the techno-economic feasibility of integrating ORC-STES. Results indicate that the LCOE and PBP are highly affected by the ORC's capital cost, and integrating STES increases the LCOE to 0.0824 USD/kWh, rendering its integration with ORC infeasible. In conclusion, this study aims to advance the understanding and application of WHR in WWTPs, paving the way for more efficient and sustainable practices in the field.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗