Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “internal rate of return”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Overview of Key Saturn Probe Mission Trades

Ongoing studies, performed at NASA/JPL over the past two years in support of NASA's SSE Roadmap activities, proved the feasibility of a NF class Saturn probe mission. I. This proposed mission could also provide a good opportunity for international collaboration with the proposed Cosmic Vision KRONOS mission: a) With ESA contributed probes (descent modules) on a NASA lead mission; b) Early 2017 launch could be a good programmatic option for ESA-CV/NASA-NF. II. A number of mission architectures could be suitable for this mission: a) Probe Relay based architecture with short flight time (approx. 6.3-7 years); b) DTE probe telecom based architecture with long flight time (-11 years), and low probe data rate, but with the probes decoupled from the carrier, allowing for polar trajectories I orbiter. This option may need technology development for telecom; c) Orbiter would likely impact mission cost over flyby, but would provide significantly higher science return. The Saturn probes mission is expected to be identified in NASA's New Frontiers AO. Thus, further studies are recommended to refine the most suitable architecture. International collaboration is started through the KRONOS proposal work; further collaborated studies will follow once KRONOS is selected in October under ESA's Cosmic Vision Program.

probes↗

Robotic Lunar Rover Technologies and SEI Supporting Technologies at Sandia National Laboratories

Existing robotic rover technologies at Sandia National Laboratories (SNL) can be applied toward the realization of a robotic lunar rover mission in the near term. Recent activities at the SNL-RVR have demonstrated the utility of existing rover technologies for performing remote field geology tasks similar to those envisioned on a robotic lunar rover mission. Specific technologies demonstrated include low-data-rate teleoperation, multivehicle control, remote site and sample inspection, standard bandwidth stereo vision, and autonomous path following based on both internal dead reckoning and an external position location update system. These activities serve to support the use of robotic rovers for an early return to the lunar surface by demonstrating capabilities that are attainable with off-the-shelf technology and existing control techniques. The breadth of technical activities at SNL provides many supporting technology areas for robotic rover development. These range from core competency areas and microsensor fabrication facilities, to actual space qualification of flight components that are designed and fabricated in-house.

Klarer, Paul R.↗

Sensorimotor Predictors: Examining the Relationship Between Measures of Post-Landing Sensorimotor Functional Task Performance

Spaceflight drives adaptive changes in healthy individuals appropriate for sensorimotor function in a microgravity environment. These changes are maladaptive for return to Earth's gravity. The inter-individual variability of sensorimotor decrements is striking, although poorly understood. The goal of this study is to identify a set of behavioral, neuroimaging and genetic measures that can be used to predict early post-flight performance on sensorimotor functional tasks. To date, we have recruited fifteen astronauts who returned from the International Space Station on Soyuz and participated in sensorimotor field tests and/or posturography within one day following long-duration spaceflight. We are specifically utilizing a combination of three quantitative post-flight functional task outcomes(relative to pre-flight baselines): tandem walk, recovery from fall and dynamic posturography, along with a subjective self-rating of post-flight decrements and recovery. The recovery from fall is performed with eyes open on a stable support, allowing the use of vestibular, visual and proprioceptive feedback for task performance. In contrast, the dynamic posturography measures are performed with eyes closed on asway-referenced unstable support, requiring reliance on vestibular feedback for task performance. Tandem walk is performed on a stable surface with eyes open and eyes closed. Fourteen of the 15 subjects performed the field tests. These were nominally performed during three timepoints on the first postflight day, while posturography was performed only once during the third time point after direct return to JSC. More than 20% were unable to complete the initial field testing in the medical tent, while all participants completed testing during the third time point at JSC. As expected, there was considerable variability among all performance outcome measures, with more variability post-flight relative to preflight. Given the variability in all post-flight outcomes, we have been examining the relationships in performance across tasks. While there is a strong association within tests obtained at different landing daytime points, our preliminary findings suggest that by R+24 hrs performance on one post-flight test does not necessarily correlate with performance on other post-flight tests. This underscores the importance of a comprehensive post-flight test battery including different types of tasks with varying sensory feedback. We expect that further examining specific behavioral, neuroimaging and genetic sensorimotor biomarkers with post-flight functional task performance will improve both our understanding of the individual variability and our strategy to optimize sensorimotor countermeasures.

S J Wood↗

A Martian Telecommunications Network: UHF Relay Support of the Mars Exploration Rovers by the Mars Global Surveyor, Mars Odyssey, and Mars Express Orbiters

NASA and ESA have established an international network of Mars orbiters, outfitted with relay communications payloads, to support robotic exploration of the red planet. Starting in January, 2004, this network has provided the Mars Exploration Rovers with telecommunications relay services, significantly increasing rover engineering and science data return while enhancing mission robustness and operability. Augmenting the data return capabilities of their X-band direct-to-Earth links, the rovers are equipped with UHF transceivers allowing data to be relayed at high rate to the Mars Global Surveyor (MGS), Mars Odyssey, and Mars Express orbiters. As of 21 July, 2004, over 50 Gbits of MER data have been obtained, with nearly 95% of that data returned via the MGS and Odyssey UHF relay paths, allowing a large increase in science return from the Martian surface relative to the X-band direct-to-Earth link. The MGS spacecraft also supported high-rate UHF communications of MER engineering telemetry during the critical period of entry, descent, and landing (EDL), augmenting the very low-rate EDL data collected on the X-band direct-to-Earth link. Through adoption of the new CCSDS Proximity-1 Link Protocol, NASA and ESA have achieved interoperability among these Mars assets, as validated by a successful relay demonstration between Spirit and Mars Express, enabling future interagency cross-support and establishing a truly international relay network at Mars.

telecommunications↗

Sensorimotor Predictors: Examining the Relationship Between Measures of Post-Landing Sensorimotor Functional Task Performance

Spaceflight drives adaptive changes in healthy individuals appropriate for sensorimotor function in a microgravity environment. These changes are maladaptive for return to Earth's gravity. The inter-individual variability of sensorimotor decrements is striking, although poorly understood. The goal of this study is to identify a set of behavioral, neuroimaging and genetic measures that can be used to predict early post-flight performance on sensorimotor functional tasks. To date, we have recruited fifteen astronauts who returned from the International Space Station on Soyuz and participated in sensorimotor field tests and/or posturography within one day following long-duration spaceflight. We are specifically utilizing a combination of three quantitative post-flight functional task outcomes(relative to pre-flight baselines): tandem walk, recovery from fall and dynamic posturography, along with a subjective self-rating of post-flight decrements and recovery. The recovery from fall is performed with eyes open on a stable support, allowing the use of vestibular, visual and proprioceptive feedback for task performance. In contrast, the dynamic posturography measures are performed with eyes closed on asway-referenced unstable support, requiring reliance on vestibular feedback for task performance. Tandem walk is performed on a stable surface with eyes open and eyes closed. Fourteen of the 15 subjects performed the field tests. These were nominally performed during three timepoints on the first post flight day, while posturography was performed only once during the third time point after direct return to JSC. More than 20% were unable to complete the initial field testing in the medical tent, while all participants completed testing during the third time point at JSC. As expected, there was considerable variability among all performance outcome measures, with more variability post-flight relative to preflight. Given the variability in all post-flight outcomes, we have been examining the relationships in performance across tasks. While there is a strong association with in tests obtained at different landing daytime points, our preliminary findings suggest that by R+24 hrs performance on one post-flight test does not necessarily correlate with performance on other post-flight tests. This underscores the importance of a comprehensive post-flight test battery including different types of tasks with varying sensory feedback. We expect that further examining specific behavioral, neuroimaging and genetic sensorimotor biomarkers with post-flight functional task performance will improve both our understanding of the individual variability and our strategy to optimize sensorimotor countermeasures.

Yiri De Dios↗

CRV Escape Trajectories from the ISS

The Crew Return Vehicle (CRV) slated for use on the International Space Station (ISS) provides a safe return for up to seven crew members under various emergency conditions. One of the most demanding situations for executing the escape involves separating from a tumbling ISS Current requirements specify a maximum Root Sum Square (RSS) tumble rate of 2 degrees/second, with the additional requirement for an expedited departure from any ISS attitude. The design of a trajectory that ensures no re-contact with the ISS poses many challenges on the Guidance, Navigation, and Control (GN&C) system of the vehicle. To ensure no re-contact the trajectory design employs a two burn sequence, with the first burn preventing near-term collision and the second burn preventing far-field re-contact This presentation describes the approach used to design and to evaluate trajectories for CRV departure from the baselined location on the ISS Node 3 starboard. This approach involved performing a parametric search of selected control variables vital in escaping the tumbling ISS The presentation provides a candidate targeting methodology for escape using minimal information from available navigation devices, and presents the quantitative results from the analysis.

Foti, Tony M.↗

Development of the Self-Powered Extravehicular Mobility Unit Extravehicular Activity Data Recorder

The Self-Powered Extravehicular Mobility Unit (EMU) Extravehicular Activity (EVA) Data Recorder (SPEEDR) is a field-programmable gate array (FPGA)-based device designed to collect high-rate EMU Primary Life Support Subsystem (PLSS) data for download at a later time. During EVA, the existing EMU PLSS data downlink capability is one data packet every 2 minutes and is subject to bad packets or loss of signal. Higher-rate PLSS data is generated by the Enhanced Caution and Warning System but is not normally captured or distributed. Access to higher-rate data will increase the capability of EMU anomaly resolution team to pinpoint issues remotely, saving crew time by reducing required call-down Q&A and on-orbit diagnostic activities. With no Space Shuttle flights post Fiscal Year 2011 (FY11), and potentially limited down-mass capability, the ISS crew and ground support personnel will have to be capable of on-orbit operations to maintain, diagnose, repair, and return to service EMU hardware, possibly through 2028. Collecting high-rate EMU PLSS data during both intravehicular activity (IVA) and EVA operations will provide trending analysis for life extension and/or predictive performance. The SPEEDR concept has generated interest as a tool/technology that could be used for other International Space Station subsystems or future exploration-class space suits where hardware reliability/availability is critical and low/variable bandwidth may require store then forward methodology. Preliminary work in FY11 produced a functional prototype consisting of an FPGA evaluation board, custom memory/interface circuit board, and custom software. The SPEEDR concept includes a stand-alone battery that is recharged by a computer Universal Serial Bus (USB) port while data are being downloaded.

Bernard, Craig↗

Experimental Results from Integrated LCRD Low-Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) Program

The National Aeronautics and Space Administration’s (NASA) Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) payload was launched and installed on the International Space Station’s (ISS) Japanese Experiment Module - Exposed Facility (JEM-EF) in November 2023. ILLUMA-T was the first space-based user to communicate with NASA’s Laser Communications Relay Demonstration (LCRD) using free space optical communication to transfer data from the ISS at return rates to Earth of up to 1.244 Gbps and forward rates from Earth of up to 155 Mbps. A 6-month long Experiments Program on ILLUMA-T concluded in June 2024, after which the payload was removed from the ISS and is currently de-orbiting. The Experiments Program was carefully designed to understand and characterize the Pointing, Acquisition, and Track (PAT) process with the new Modular, Agile, Scalable Optical Terminal (MAScOT), optical modem performance, and end-to-end relay performance.

ISS↗

Heliospheric Physics and NASA's Vision for Space Exploration

The Vision for Space Exploration outlines NASA's development of a new generation of human-rated launch vehicles to replace the Space Shuttle and an architecture for exploring the Moon and Mars. The system--developed by the Constellation Program--includes a near term (approx. 2014) capability to provide crew and cargo service to the International Space Station after the Shuttle is retired in 2010 and a human return to the Moon no later than 2020. Constellation vehicles and systems will necessarily be required to operate efficiently, safely, and reliably in the space plasma and radiation environments of low Earth orbit, the Earth's magnetosphere, interplanetary space, and on the lunar surface. This presentation will provide an overview of the characteristics of space radiation and plasma environments relevant to lunar programs including the trans-lunar injection and trans-Earth injection trajectories through the Earth's radiation belts, solar wind surface dose and plasma wake charging environments in near lunar space, energetic solar particle events, and galactic cosmic rays and discusses the design and operational environments being developed for lunar program requirements to assure that systems operate successfully in the space environment.

Minow, Joseph I.↗

The effects of shock wave precursors ahead of hypersonic entry vehicles

A model has been developed to predict the magnitude and characteristics of the shock wave precursor ahead of a hypervelocity vehicle. This model includes both chemical and thermal nonequilibrium, utilizes detailed mass production rates for the photodissociation and photoionization reactions, and accounts for the effects of radiative absorption and emission on the individual internal energy modes of both atomic and diatomic species. Comparison of the present results with shock tube data indicates that the model is reasonably accurate. A series of test cases representing earth aerocapture return from Mars indicate that there is significant production of atoms, ions and electrons ahead of the shock front due to radiative absorption and that the precursor is characterized by an enhanced electron/electronic temperature and molecular ionization. However, the precursor has a negligible effect on the shock layer flow field.

Stanley, Scott A.↗

How Much Testing is Needed to Manage Supportability Risks for Beyond-LEO Missions?

Supportability will be a significantly greater driver of cost and risk for future deep-space crewed missions than it has been in the past. Spares requirements and maintenance risk mitigation in particular present an unprecedented challenge for missions beyond Low Earth Orbit (LEO), since, for the first time in human spaceflight history, crews will be weeks or months away from resupply or a safe return to Earth in the event of an abort. Under these conditions, failure rates are a critical parameter that must be well-understood in order to manage logistics and risk effectively. However, failure rates cannot be measured directly, and can only be estimated based on past experience and test results. Previous research has shown that International Space Station (ISS) operational experience has provided significant benefits to future missions by reducing uncertainty and improving accuracy in failure rate estimates, resulting in significant reductions in mass and risk for beyond-LEO missions. This paper updates and expands on that research and quantifies the potential value of continued testing for future mission supportability. Frequentist and Bayesian models for evaluating, validating, and updating failure rate estimates are described, and are combined with supportability models to examine potential impacts of additional operating experience for future missions in terms of logistics mass reduction. The implications of these results for technology development, system design, and program planning are discussed along with lessons learned and recommendations for future system development. In the end, there is no simple answer to the question of how much testing is required, but the models described in this paper provide a way to evaluate the potential impacts of testing in order to inform test planning.

Andrew C Owens↗

A Delay Tolerant Networking-Based Approach to a High Data Rate Architecture for Spacecraft

Historically, it has been the case that SWaP placed such severe constraints on radios that the links between spacecraft and the ground were relatively slow. This meant that the radio link was normally a significant bottleneck in returning scientific data. Over recent years, however, a combination of more efficient radio design, intelligent waveforms, and highly directed, high-frequency RF / optical systems have led to a rapid increase in the amount of data that can be pushed through radio and optical links. This has led to some cases where the radio links are capable of moving data much more quickly than the spacecraft and instruments are capable of actually generating it! In some instances, scientific data can therefore be lost not because the downlink is too slow to support the data rate, but instead because the spacecraft was not designed in a way that would let it fully utilize both the radio and the networking services available to it.The High Data Rate Architecture (HiDRA) project describes a packet-based approach to building modern, distributed spacecraft systems. It presents a means for spacecraft and other assets to participate in both present and future Delay Tolerant Networks (DTN), while simultaneously ensuring that the asset is able to fully utilize the new, high-speed links that have been seeing more widespread development and deployment in recent years. With this in mind, this paper begins with a discussion regarding HiDRA's evolution. Next, it discusses the capabilities and limitations of NASA's present DTN-enabled networks. Of particular note is the way in which principles of network design at the terrestrial level (e.g. use of programmable networks / software-defined networks, separation between data and control plane, infusion of COTS Ethernet switch chips, etc.) can all be translated into the space environment as well. After this, the paper discusses the design and implementation of a present prototype reference implementation of High-Rate DTN (HDTN), which is intended to demonstrate future high-rate networking concepts as part of a coherent demonstration on the International Space Station (ISS). The goal, of both the research and of this implementation, is to help develop a ready-made toolbox of ideas, approaches, and examples from which mission designers can draw when putting together new missions. Assuming all goes as planned, this should not only work to reduce the cost of individual mission design, but also improve the rate at which science data can be returned for mission participants to review.

Hylton, Alan↗

A Delay Tolerant Networking-Based Approach to a High Data Rate Architecture for Spacecraft

Historically, it has been the case that SWaP (Size, Weigh a lot, And consume Power) placed such severe constraints on radios that the links between spacecraft and the ground were relatively slow. This meant that the radio link was normally a significant bottleneck in returning scientific data. Over recent years, however, a combination of more efficient radio design, intelligent waveforms, and highly directed, high-frequency RF / optical systems have led to a rapid increase in the amount of data that can be pushed through radio and optical links. This has led to some cases where the radio links are capable of moving data much more quickly than the spacecraft and instruments are capable of actually generating it! In some instances, scientific data can therefore be lost not because the downlink is too slow to support the data rate, but instead because the spacecraft was not designed in a way that would let it fully utilize both the radio and the networking services available to it. The High Data Rate Architecture (HiDRA) project describes a packet-based approach to building modern, distributed spacecraft systems. It presents a means for spacecraft and other assets to participate in both present and future Delay Tolerant Networks (DTN), while simultaneously ensuring that the asset is able to fully utilize the new, high-speed links that have been seeing more widespread development and deployment in recent years. With this in mind, this paper begins with a discussion regarding HiDRA's evolution. Next, it discusses the capabilities and limitations of NASA's present DTN-enabled networks. Of particular note is the way in which principles of network designate the terrestrial level (e.g., use of programmable networks / software-defined networks, separation between data and control plane, infusion of COTS (Commercial Off-The-Shelf) Ethernet switch chips, etc.) can all be translated into the space environment as well. After this, the paper discusses the design and implementation of a present prototype reference implementation of High-Rate DTN (HDTN),which is intended to demonstrate future high-rate networking concepts as part of a coherent demonstration on the International Space Station (ISS). The goal, of both the research and of this implementation, is to help develop a ready-made toolbox of ideas, approaches, and examples from which mission designers can draw when putting together new missions. Assuming all goes as planned, this should not only work to reduce the cost of individual mission design, but also improve the rate at which science data can be returned for mission participants to review.

Hylton, Alan↗

A Preliminary Assessment of Physical Demand during Simulated Lunar Surface Extravehicular Activities

Returning to the moon requires many advances in current space technology. One major aspect of this development is a new exploration spacesuit (xEMU). Taking lessons learned from Apollo era suitsand the Extravehicular Mobility Unit (EMU) used on the International Space Station (ISS), xEMU will have increased mobility, dust mitigation, headspace, glove fit, and life support capabilities. Artemis astronauts in xEMU will complete a far more rigorous Extravehicular Activity (EVA) schedule than Apolloand ISS. Notably, metabolic rates during Apollo lunar EVA tasks were observed to be up to 50% lower than similar tasks performed in a ground analog environment under simulated partial gravity with newer suits. Therefore, understanding the physical demands of lunar surface exploration operations is criticalto ensuring best outcomes operating within the constraints of xEMU and planning for exploration EVA activities. This study utilized the Active Response Gravity Offload System (ARGOS) to simulate the lunar environment and continuously offload subjects to lunar gravity. Two male subjects completed two days of EVAs wearing the pressurized Mark III spacesuit, completing suit fit and mobility checks, as well as simulated lander operations, cable routing, crew rescue, geology, payload relocation, and traverse tasks in an end-to-end EVA (E2E) task block and standalone (SA) task blocks. We recorded continuous values of metabolic rate (MR) and heart rate (HR) to assess physical demand. During the E2E task block, subjects did not rest between tasks to simulate continuous effort from task to task, as in real EVAs. In comparison, subjects had a 5-minute break after each SA task block to allow for the metabolic rate and heart rate to return to baseline.MR values were categorized as low (≤ 700 BTU/hr), medium (700-1000 BTU/HR), and high (≥ 1000 BTU/hr), while HR values were categorized as low (≤150) and high (>150). During the 16 tasks in the E2E block, subjects averaged low MR in 6% of tasks, medium MR in 47% of tasks, and high MR in 47% of tasks. While MR was consistent between subjects, Subject 1 averaged low HR for 100% of these tasks, while Subject 2 averaged low HR in 44% of tasks. During the 23 tasks in the SA task blocks, subjects averaged low MR in 26% of tasks, medium MR in 52% of tasks, and high MR in 22% of tasks. Again, HR was different between subjects, with subject 1 averaging low HR in 100% of these tasks while subject 2 averaged low HR in 70%. Across all tasks in this study, subjects reached maximum MR and HR values during a 500m traverse at 30% grade in the E2E block (subject 1: 1747 BTU/hr, 150 BPM; subject 2: 1656 BTU/hr, 177 BPM).Understanding the physical demand to complete exploration EVA tasks will be instrumental to the future success of exploration spacesuit designs and missions. Further work in this study will be needed to characterize MR during exploration EVA tasks, including expanding the subject pool and testing new suit designs.

Taylor E Schlotman↗

ISS Commercial Cargo Service: Requirements and Constraints Summary

A viewgraph presentation describing the fundamental requirements and constraints necessary to begin the acquisition of an International Space Station commercial cargo service is presented. The topics include: 1) Background; 2) Philosophy; 3) Cargo Balance; 4) Cargo Types; 5) ICCS Flight Rate; 6) Late and Early Access; 7) Power to Payloads; 8) Mating Locatin Options; 9) ISS Docking and Berthing; 10) Vehicle Stay Time; 11) ISS Resource Availability; 12) Robotic and EVA Compatability; 13) Return Cargo; and 14) Key Requirements Summary.

Thorn, Valin↗

NASA Exploration Launch Projects Overview: The Crew Launch Vehicle and the Cargo Launch Vehicle Systems

The U.S. Vision for Space Exploration (January 2004) serves as the foundation for the National Aeronautics and Space Administration's (NASA) strategic goals and objectives. As the NASA Administrator outlined during his confirmation hearing in April 2005, these include: 1) Flying the Space Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human space flight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. In spring 2005, the Agency commissioned a team of aerospace subject matter experts to perform the Exploration Systems Architecture Study (ESAS). The ESAS team performed in-depth evaluations of a number of space transportation architectures and provided recommendations based on their findings? The ESAS analysis focused on a human-rated Crew Launch Vehicle (CLV) for astronaut transport and a heavy lift Cargo Launch Vehicle (CaLV) to carry equipment, materials, and supplies for lunar missions and, later, the first human journeys to Mars. After several months of intense study utilizing safety and reliability, technical performance, budget, and schedule figures of merit in relation to design reference missions, the ESAS design options were unveiled in summer 2005. As part of NASA's systems engineering approach, these point of departure architectures have been refined through trade studies during the ongoing design phase leading to the development phase that begins in 2008. Comprehensive reviews of engineering data and business assessments by both internal and independent reviewers serve as decision gates to ensure that systems can fully meet customer and stakeholder requirements. This paper provides the current CLV and CaLV configuration designs and gives examples of the progress being made during the first year of this significant effort. Safe, reliable, cost-effective space transportation systems are a foundational piece of America s future in space and the next step in realizing the plan for revitalizing lunar capabilities on the passageway to the human exploration of Mars. While building on legacy knowledge and heritage hardware for risk reduction, NASA will apply lessons learned from developing these new launch vehicles to the growth path for future missions. The elements for mission success and continued U.S. leadership in space have been assembled over the past year. As NASA designs and develops these two new systems over the next dozen years, visible progress, such as that reported in this paper, may sustain the national will to stay the course across political administrations and weather the inevitable trials that will be experienced during this challenging endeavor.

Snoddy, Jimmy R.↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool the majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit for the ammonia leak was the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗

Coolant Leak from ISS External Active Thermal Control System (EATCS) – An Examination of Most Probable

The Port (P1) and Starboard (S1) External Active Thermal Control Systems (EATCS) are single phase, mechanically pumped ammonia loops that operate independently to cool majority of the hardware and payloads onboard the International Space Station (ISS). A slow ammonia leak was detected using pressure and quantity telemetry five years after the P1 EATCS was activated. The leak gradually accelerated to a rate that locating and isolating the leak became imperative to maintain cooling capability. Partial pressure measurements from the Robotic External Leak Locator (RELL) scan surveys narrowed the search to the supply and return jumpers connecting one of three radiators to the system. Subsequently, the ISS crew performed high definition video surveys during an Extravehicular Activity (EVA), or spacewalk, and ammonia flakes were observed projecting from the jumpers. Thus, the ground teams were confident that the culprit of the ammonia leak were the jumpers. The ammonia leak stopped after ground teams remotely isolated and vented those jumpers and associated radiator. Both jumpers were removed and returned to the ground, and a root cause investigation was conducted. A calibrated leak test determined the bulk of the ammonia leaked through a pair of seals in a Quick Disconnect (QD), or connector, on one end of the return jumper. The return jumper QD was dissected, visually inspected, chemically tested and evaluated. The results indicated the most probable cause of the accelerating ammonia leak was due to defective seals, plating delamination underneath the seals, and on-orbit thermal cycles exacerbating the delamination. Both jumpers were refurbished, relaunched to the ISS, and scheduled to be reinstalled during an EVA in 2022. It appeared the issue was unique, but recently the S1 EATCS is showing signs of an accelerating ammonia leak, and RELL scans narrowed the source to a similar pair of radiator jumpers.

Thermal Control↗