Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Combined Computational and Mathematical Analysis of Interconnect Fatigue Potential in Photovoltaic Modules

A finite element model of a 60-cell monocrystalline silicon glass-polymer photovoltaic module was simulated with ±1.0 kPa and ±2.4 kPa loads applied to the glass to calculate the deformation under load. Cell-to-cell displacements were used to approximate interconnect strain and stress. A mathematical fatigue cycle life relation was fitted to data for the interconnect material (copper), to generate a life prediction at each interconnect location based on the local stress means, reversal extents, and amplitudes. Interconnect stress was found to be significantly asymmetric about zero despite symmetric positive and negative module loads due to laminate thickness offsets about the neutral plane and the effects of module framing. Cycle life results indicated that interconnect fatigue failure was unlikely to occur over a 30-year lifetime of conservative wind and snow load cycles since the typical cell design feature of leaving some unconstrained length between the cell edge and first solder pad increases the effective gauge length and decreases the stress levels below the material endurance limit. Follow-up analyses found that 3.6 mm and 6.4 mm were the minimum unconstrained lengths required to survive the assumed lifetime of wind and snow cycles, respectively, confirming that typical industrial module constructions with 8–15 mm unconstrained lengths should survive conservatively. Notably, large magnitude, low-cycle snow loading was consistently the limiting factor requiring a longer unconstrained interconnect length. Finally, insights and workflows from this study inform module interconnection design limits for survival against mechanical fatigue in deployment environments.

14 SOLAR ENERGY↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

STEPS: A Portable Numerical Simulation Toolkit for Electrical Power System Dynamic Studies

Numerical simulation is the key technique for large scale power system analysis. Redistribution of global renewable power via international interconnections requires new simulation tools to study the interconnected systems with different nominal frequencies as a whole. In this paper we introduce an open source simulation toolkit for electrical power systems (STEPS) which is hosted at Github. Its kernel is coded in C++ with major functions of power flow and electro-mechanical dynamic simulation. Flexible options are provided and configurable to improve power flow solution and dynamic simulation. Common devices and models are supported in STEPS for AC/DC hybrid system studies. Studies of interconnected systems with different nominal frequencies is supported in STEPS for research of international interconnection. Application program interfaces are provided and wrapped with Python to enable high-level interfaces for general applications. STEPS is thread safe and parallel computation is supported in both kernel and script levels to accelerate simulation. It is portable and works on Windows and GNU/Linux platforms. Cases from small to large scale systems are thoroughly tested to validate the toolkit with commercial packages as benchmarks.

42 ENGINEERING↗

Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and

Chelminski, Kathryn↗

Eastern Interconnection Wide-Area Oscillation Assessment and Study Report

To meet the government mandates such as Renewable Portfolio Standards (RPS), conventional synchronous generators with rotating mass are being displaced by inverter-based resources (IBRs), leading to high penetration of renewable energy sources (RES). As a result, the inherent properties and characteristics of the transformed generation mix may significantly impact the grid behaviour, and it is of paramount significance that the impact and the consequences of the resource mix change is thoroughly understood to adopt measures to maintain reliable grid operations. Of great concern is the inter-area low-frequency oscillation, which usually propagates through a large region and has a system-wide impact. Such oscillations may lead to unnecessary or inadvertent tripping of generators, that may be simply reacting to the oscillation originating from geographically remote sites. Such tripping of generators can lead to cascading outages, system split and load loss events. Over the years, several system-wide oscillation events have been observed across all three North American interconnections. This project titled Wide-area Oscillation Assessment and Trending Study, sponsored by the Office of Electricity (OE) of the Department of Energy (DOE), aims to conduct the required research to capture and investigate the potential changes in wide-area oscillatory performance of the system as a result of resource mix transition. The Pacific Northwest National Laboratory (PNNL) conducted this research and technical staff of Federal Energy Regulatory Commission (FERC) served as advisors to the project. The primary objective of this study is to assess whether there are significant trends in the power system wide-area oscillatory behaviours, as a result of the generation-mix changes due to the increased penetration of RES in the U.S. Eastern Interconnection (EI). The analysis presented in this report can serve as reference for future grid planning and operation of the EI system. This research conducted in this project evaluates the wide-area oscillatory behaviour of the EI, using a model-based approach for potential future resource mixes, and the measurement-based analysis with 21-month phasor measurement unit (PMU) time series. The oscillation modes in EI system along with the impact of the changes of the generation mix on the frequency and damping ratio (DR) of the oscillations have been studied.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DQ Admittance Extraction for Inverter-Based Resources

The power grid industry is pushing for electromagnetic transient (EMT)-based studies for generation interconnection and planning process due to high penetrations of inverter-based resource (IBRs). Vendor-specific and site-specific black-box IBR models are preferred in those simulation studies. For small-signal analysis, measurement-based admittance models are necessary. In this paper, we demonstrate the extraction of frequency-domain dq frame IBR models. These linear models are specific to operating conditions. We demonstrate two extraction methods: frequency scan and a step response-based method. The latter relies on converting time-domain responses to Laplace-domain expressions via eigensystem realization analysis (ERA). Both can lead to dq admittance representation and the latter is time saving.

admittance model↗

DQ Admittance Extraction for Inverter-Based Resources: Preprint

The power grid industry is pushing for electro-magnetic transient (EMT)-based studies for generation interconnection and planning process due to high penetrations of inverter-based resource (IBRs). Vendor-specific and site-specific black-box IBR models are preferred in those simulation studies. For small-signal analysis, measurement-based admittance models are necessary. In this paper, we demonstrate the extraction of frequency-domain dq frame IBR models. These linear models are specific to operating conditions. We demonstrate two extraction methods: frequency scan and a step response-based method. The latter relies on converting time-domain responses to Laplace-domain expressions via eigensystem realization analysis (ERA). Both can lead to dq admittance representation and the latter is time saving.

admittance model↗

Rapid QSTS Simulations for High-Resolution Comprehensive Assessment of Distributed PV

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modeling and impact analysis. Unlike conventional scenario-based studies, quasi-static time-series (QSTS) simulations can realistically model time-dependent voltage controllers and the diversity of potential impacts that can occur at different times of year. However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1-second resolution is often required, which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled. This computational burden is a clear limitation to the adoption of QSTS simulations in interconnection studies and for determining optimal control solutions for utility operations. The solutions we developed include accurate and computationally efficient QSTS methods that could be implemented in existing open-source and commercial software used by utilities and the development of methods to create high-resolution proxy data sets. This project demonstrated multiple pathways for speeding up the QSTS computation using new and innovative methods for advanced time-series analysis, faster power flow solvers, parallel processing of power flow solutions and circuit reduction. The target performance level for this project was achieved with year-long high-resolution time series solutions run in less than 5 minutes within an acceptable error.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county↗

DROP DURABILITY ASSESSMENT OF ELECTRONIC ASSEMBLIES UNDER OFF-AXIS LOADING WITH SKEWED FIXTURES

This thesis studies drop durability of electronic assemblies when the acceleration vector is oriented at 45° to the out-of-plane direction of the circuit card. The off-axis drop tests are accomplished with a skewed fixture and are conducted as a proxy for multiaxial drop testing. Advanced shock testing and vibration test methods have been developed over the last few decades to better represent real-world field environments during ground-based laboratory testing. However, many of these test methods require expensive and specialized equipment not available in most laboratories. An alternative approach for approximating simultaneous loading along multiple axes on conventional equipment utilizes skewed fixtures which have seen use in off-axis random vibration and drop impact testing. These methods generally rely on the conversion of a uniaxial input load from the test equipment (using a uniaxial drop tower or shaker) into a multiaxial load when resolved in the reference frame of the test article (mounted on a skewed fixture). Skewed fixture design is presented and recommendations for conducting skewed angle drop testing are introduced based on local measurements along the skewed face of the fixture to accurately monitor the impact event. Characterization tests were performed with a skewed fixture, at simultaneous acceleration loads from 500 to 3,000 g in two (in-plane and out-of-plane) directions, while meeting standard time domain tolerances. Upon experimental characterization, drop shock durability tests were conducted on a printed circuit assembly (PCA). Mean drops-to-failure were measured and quantified with Weibull statistics. Dominant solder joint failure modes were identified via failure analysis. Prior work on inclined angle impact testing is limited, and the majority of solder joint interconnect level fatigue studies are conducted considering perpendicular loading normal the circuit card. Low-cycle fatigue curves are generated based on plastic strain and plastic work density within the solder joint. A multiscale nonlinear finite element model is used to relate board-level flexure to solder joint interconnect level plastic strain. A high strain rate solder constitutive model allows for accurate modeling of solder plasticity resulting from high-impact drop shock. Fatigue parameters are computed from the Coffin-Manson relation and Palmgren-Miner damage accumulation. This work serves to apply established low-cycle fatigue methods for conventional drop shock loading (impact normal to circuit card) to non-perpendicular loading with a skewed fixture.

Hower, Jonathan [Kansas City National Security Cam↗

Modeling the Water Systems of the Western US to Support Climate‐Resilient Electricity System Planning

Abstract Electricity and water systems in the Western US (WUS) are closely connected, with hydropower comprising 20% of total annual WUS generation, and electricity related to water comprising about 7% of total WUS electricity use. Because of these interdependencies, the threat of climate change to WUS resources will likely have compounding electricity impacts on the Western Interconnect grid. This study describes a WUS‐wide water system model with a particular emphasis on estimating climate impacts on hydropower generation and water‐related electricity use, which can be linked with a grid expansion model to support climate‐resilient electricity planning. The water system model combines climatically‐driven physical hydrology and management of both water supply and demand allocation, and is applied to an ensemble of 15 climate scenarios out to 2050. Model results show decreasing streamflow in key basins of the WUS under most scenarios. Annual water‐related electricity use increases up to 4%, and by up to 6% during the summer months, driven by growing agricultural demands met increasingly through a shift toward energy‐intensive groundwater to replace declining surface water. Total annual hydropower generation changes by +5% to −20% by mid‐century but declines in most scenarios, with decreases in summer generation by up to nearly −30%. Water‐related electricity use increases tend to coincide with hydropower generation declines, annually and seasonally, demonstrating the importance of concurrently evaluating the climate signal on both water‐for‐energy and energy‐for‐water to inform planning for grid reliability and decarbonization goals.

13 HYDRO ENERGY↗

Explaining System-Level Prognostics with Established Machine Learning Methods

System-level prognostics is crucial for ensuring reliability and enabling predictive maintenance in complex systems with interconnected components. This study presents a framework that integrates data-driven methods to predict the remaining useful life (RUL) of a subsystem under multiple and concurrent faults within a nuclear power plant system with explainable artificial intelligence (XAI). A nuclear power plant (NPP) operation was simulated to model the degradation behavior of NPP components, and four machine learning models—Gradient Boosting Regressor (GBR), Support Vector Regressor (SVR), Fully Connected Neural Network (FCNN), and Long Short-Term Memory (LSTM)—were evaluated for prognostics with a novel system RUL parameter. The LSTM model demonstrated potential superior repeatability, while SHAP (SHapley Additive exPlanations) for explainability provided consistent and trustworthy global explanations. In contrast, LIME (Local Interpretable Model-agnostic Explanations) offered localized interpretability but showed reduced stability for sequential data. Key findings include the interplay between component-level degradation and system-wide performance, with LSTM effectively capturing these dynamics through sequence-level predictions. The XAI techniques enhanced transparency by identifying critical features influencing model predictions and aligning with domain knowledge. Furthermore, this framework has significant implications for improving trust and understanding in predictive maintenance, particularly in safety-critical industries like nuclear energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Request for Information: Access to Quantum Systems

Quantum science and technology is a focal point of research at Lawrence Livermore National Laboratory (LLNL). Quantum-coherent devices offer the potential for unprecedented precision in sensing and the ability to directly simulate complex quantum phenomena that have no known efficient classical algorithms. Thus, development and implementation of quantum technologies is expected to have a significant impact on our ability to address some of the most complex national security problems. LLNL maintains projects involving a broad spectrum of Quantum Information Science (QIS) research activities including investigating sources of decoherence, the 3DQ microscope, studies into quantum interconnects, 3-D printed ion traps, fusion energy and nuclear physics simulations, modeling for data-starved environments, and quantum sensing, including accelerometry and timing.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A Neural Lyapunov Approach to Transient Stability Assessment in Interconnected Microgrids

We propose a neural Lyapunov approach to assessing transient stability in power electronic-interfaced microgrid interconnections. The problem of transient stability assessment is cast as one of learning a neural network-structured Lyapunov function in the state space. Based on the function learned, a security region is estimated for monitoring the security of interconnected microgrids in real-time operation. The efficacy of the approach is tested and validated in a grid-connected microgrid and a three-microgrid interconnection. A comparison study suggests that the proposed method can achieve a less conservative characterization of the security region, as compared with a conventional approach.

Huang, Tong↗

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗