Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnection equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

DSN ground communications facility

The Ground Communications Facility (GCF) is one of the three functional elements of the Deep Space Network (DSN) and provides the capability required for the transmission, reception, and monitoring of voice and data communications between the various locations of the DSN. The GCF uses common carrier circuits interconnected to specialized switching, terminal, and monitor equipment, integrated into a world-wide system, and operated in support of space flight missions. The five subsystems of GCF (Teletype, Voice, High-Speed, Wideband, and Monitor) are described. The Office of Tracking and Data Acquisition of the Jet Propulsion Laboratory provides the technical direction and systems management of the GCF and acts as the representative of NASCOM for communications switching functions on the west coast.

Glenn, M. S.↗

Evaluation of a Reduced-Order Model for IBR Fault Response Representation via OEM Blackbox Models: Preprint

Driven by the need to capture the electromagnetic transients of transmission lines, inverter switching behavior, and detailed control systems, electromagnetic transient (EMT) studies have become increasingly important in industry, such as IBR interconnection study and fault study. However, original equipment manufacturer (OEM) inverter models typically include extensive parameters and proprietary settings that are unavailable to protection engineers. This paper introduces a data-driven, reduced-order model (ROM) developed as a PSCAD library component for use in EMT-based fault studies. The ROM replicates key OEM model behaviors without requiring detailed knowledge of control design or parameterization. The accompanying Python automation scripts streamline data generation, parameter fitting, and validation. The ROM's performance is demonstrated through comparison with both IEEE 2800-compliant and non-compliant OEM models in a real-world power system. Relay responses show nearly identical results, while simulation runtime is reduced by an average of 32.8\%, highlighting the ROM's practicality for protection engineers.

14 SOLAR ENERGY↗

On the Path to SunShot - Emerging Issues and Challenges with Integrating High Levels of Solar into the Distribution System

Wide use of advanced inverters could double the electricity-distribution system’s hosting capacity for distributed PV at low costs—from about 170 GW to 350 GW (see Palmintier et al. 2016). At the distribution system level, increased variable generation due to high penetrations of distributed PV (typically rooftop and smaller ground-mounted systems) could challenge the management of distribution voltage, potentially increase wear and tear on electromechanical utility equipment, and complicate the configuration of circuit-breakers and other protection systems—all of which could increase costs, limit further PV deployment, or both. However, improved analysis of distribution system hosting capacity—the amount of distributed PV that can be interconnected without changing the existing infrastructure or prematurely wearing out equipment—has overturned previous rule-of-thumb assumptions such as the idea that distributed PV penetrations higher than 15% require detailed impact studies. For example, new analysis suggests that the hosting capacity for distributed PV could rise from approximately 170 GW using traditional inverters to about 350 GW with the use of advanced inverters for voltage management, and it could be even higher using accessible and low-cost strategies such as careful siting of PV systems within a distribution feeder and additional minor changes in distribution operations. Also critical to facilitating distributed PV deployment is the improvement of interconnection processes, associated standards and codes, and compensation mechanisms so they embrace PV’s contributions to system-wide operations. Ultimately SunShot-level PV deployment will require unprecedented coordination of the historically separate distribution and transmission systems along with incorporation of energy storage and “virtual storage,” which exploits improved management of electric vehicle charging, building energy systems, and other large loads. Additional analysis and innovation are neede

14 SOLAR ENERGY↗

Safety Case for Service Contracts

Safety cases developed for the Facilities Management and Operations Center (FMOC) are based on the requirements in MN471021, Work Planning and Control Criteria for Safe Design and Operations. The FMOC performs maintenance activities in various locations at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM consists of more than 6,000,000 square feet of buildings, structures, and site infrastructure on approximately 13,000 acres of land. The FMOC performs approximately 7500 service contract work orders a year to assist with operations and maintenance at the SNL/NM site and facilities. As part of the continual improvement process, this Safety Case will be reviewed and updated, as needed, or at a minimum every three years. People tend to underestimate the probability of an accident if none have occurred previously or if the person performing the work is skilled, and they tend to trust each other’s competence. Human error within systems must be identified and considered. The FMOC uses failure mode analysis (FMA) to determine how a system might fail and cause accidents, as well as the amount and types of controls needed. The FMOC includes interconnected elements, such as people, environment, procedures, facilities, equipment, and the hazards identified in the work analysis. A daily pre-task plan is required prior to any work activity. Changes in work practices will be communicated clearly to all service contractors and personnel by way of contractor pre-task planning, activity-specific plans, contract amendments, and/or training. The FMOC has created a safe-by-design intent approach for service contract execution starting at the planning stage and extending through the execution phase. The Safety Program (see Figure 2) summarizes how the FMOC connects work analysis elements with service contracts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Flexible, Thin-Film Solar-Cell Blanket

Much of available area used to absorb solar energy. Proposed blanket of solar photovoltaic cells mounted on exterior surface of equipment it powers. Readily conforms to irregular shapes. Does not require separate supporting structure and saves space. Not added on to equipment but constitutes an integral part of it. Interconnection wiring deposited on sheet photolithographically or by other suitable masking/fabrication methods. Complete blanket, including cells and interconnections, fabricated as rigid unit directly on, and supported by, nonplanar surface to be covered.

Stella, Paul M.↗

IMPACT User Experience

NASA Human Research Project (HRP) and Exploration Medical Capabilities (ExMC) team identified a need to implement a human-centered design approach for a computational tool that performs detailed trade space analysis and research prioritization, known as Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT). IMPACT processes numerous parameters such as space vehicle design, mission objectives, evacuation capability, medical events, and mission constraint, including but not limited to; duration, mass, volume, equipment, and medical capability, each with complex and interconnected relationships. The ability for users to navigate through these complexities and provide an intuitive report is critical to aiding stakeholders in the decision-making process of future missions. In this presentation we will discuss how the IMPACT team has applied human-centered design strategies to improve system usability by modelling human-system integration (i.e., task analysis) with the MagicDraw SysML modelling application and performing A/B testing of user interface prototypes.

S Ozbek↗

Local control of reactive power by distributed photovoltaic generators

High penetration levels of distributed photovoltaic (PV) generation on an electrical distribution circuit may severely degrade power quality due to voltage sags and swells caused by rapidly varying PV generation during cloud transients coupled with the slow response of existing utility compensation and regulation equipment. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We suggest a local control scheme that dispatches reactive power from each PV inverter based on local instantaneous measurements of the real and reactive components of the consumed power and the real power generated by the PVs. Using one adjustable parameter per circuit, we balance the requirements on power quality and desire to minimize thermal losses. Numerical analysis of two exemplary systems, with comparable total PV generation albeit a different spatial distribution, show how to adjust the optimization parameter depending on the goal. Overall, this local scheme shows excellent performance; it's capable of guaranteeing acceptable power quality and achieving significant saving in thermal losses in various situations even when the renewable generation in excess of the circuit own load, i.e. feeding power back to the higher-level system.

14 SOLAR ENERGY↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Creation of System Validation Platform

SNL and SunSpec were to create a System Validation Platform to verify the functionality of DERs with advanced grid functionality and utility communication capabilities. The Validation Platform software was to ensure DERs are compatible with new grid interconnection requirements for these advanced functions by communicating to equipment under test, data acquisition software, and test equipment.

97 MATHEMATICS AND COMPUTING↗

Design and calculations for HWR Strongback

The PIP-II Superconductive Linac is a linear accelerator that provides the first stage of beam acceleration. The velocity increase is achieved through a sequence of different cryomodules, where all the cavities are aligned to form a continuous string. The cryomodule team is currently developing a spare for the HWR cryomodule. This spare will not be an exact replica of the existing one, but rather will be based on the SSR f650 cryomodule design created for PIP-II . Each cavity , magnet , and coupler form a unit, with a total of eight units per string. These components, together with additional equipment (such as piping , the thermal shield , and beamline interconnections ), are supported by the Strongback . The aim of this project is to develop a brand-new Strongback design for HWR cavities, and to perform the related analyses and calculations in order to meet the required specifications.

43 PARTICLE ACCELERATORS↗

Integrated Water-Power System Resilience Analysis in a Southeastern Idaho Irrigation District: Minidoka Case Study

This study investigates the joint water–power system resilience of an irrigation district in southeastern Idaho. Irrigation districts face difficulties in the delivery of water to farmers under drought conditions, during equipment failures, or unplanned infrastructure disruptions. The resilience of interconnected water and power systems can be better analyzed and understood through an integrated approach, using a model that connects the dependencies between the two halves of the system. Using a multi-agent system model capturing both water and power system components, as well as their linkages, we capture the interdependencies of these systems and highlight opportunities for improvement when faced with disruptions. Through simulation scenarios, we examine the system resilience using system performance, quantified as the percentage of met demand of the power and water system, when subjected to drought water year, an unforeseen water demand increase, power outage and dam failure. Scenario results indicate that the effects of low flow years are mostly felt in the power system; unexpected increases in water demand marginally impact irrigation system performance; dams and pumps present vulnerabilities of the system, causing substantial unmet demand during disruptions. Noting the interdependencies between the water–power system halves while leveraging an integrated simulation allows for an insightful analysis of the system impacts during disruptions.

13 HYDRO ENERGY↗

Graph-Based Representations and Applications to Process Simulation

Rapid and robust convergence of a process flowsheet is critical to enable large-scale simulations that address core scientific questions related to process design, optimization, and sustainability. However, due to the highly coupled and nonlinear nature of chemical processes, efficiently solving a flowsheet remains a challenge. In this work, we show that graph representations of the underlying physical phenomena in unit operations may help identify potential avenues to systematically reformulate the network of equations and enable more robust topology-based convergence of flowsheets. To this end, we developed graph abstractions of the governing equations of vapor-liquid and liquid-liquid equilibrium separation equipment. These graph abstractions consist of a mesh of interconnected variable nodes and equation nodes that are systematically generated through PhenomeNode, a new open-source library in Python developed in this study. We show that partitioning the graph into separate mass, energy, and equilibrium subgraphs can help decouple nonlinearities and guide decomposition algorithms. By employing the graph abstraction on an industrial separation process for separating glacial acetic acid from water, we implemented a new block decomposition scheme in BioSTEAM and demonstrated that this can accelerate convergence over a traditional sequential modular approach.

Distillation↗

The gravitational plant physiology facility-Description of equipment developed for biological research in spacelab

In January 1992, the NASA Suttle mission STS 42 carried a facility designed to perform experiments on plant gravi- and photo-tropic responses. This equipment, the Gravitational Plant Physiology Facility (GPPF) was made up of a number of interconnected units mounted within a Spacelab double rack. The details of these units and the plant growth containers designed for use in GPPF are described. The equipment functioned well during the mission and returned a substantial body of time-lapse video data on plant responses to tropistic stimuli under conditions of orbital microgravity. GPPF is maintained by NASA Ames Research Center, and is flight qualifiable for future spacelab missions.

Heathcote, D. G.↗

Low cost solar array project production process and equipment task: A Module Experimental Process System Development Unit (MEPSDU)

Several major modifications were made to the design presented at the PDR. The frame was deleted in favor of a "frameless" design which will provide a substantially improved cell packing factor. Potential shaded cell damage resulting from operation into a short circuit can be eliminated by a change in the cell series/parallel electrical interconnect configuration. The baseline process sequence defined for the MEPSON was refined and equipment design and specification work was completed. SAMICS cost analysis work accelerated, format A's were prepared and computer simulations completed. Design work on the automated cell interconnect station was focused on bond technique selection experiments.

Source record↗

Overview of the Liquid Argon Cryogenics for the Short Baseline Neutrino Program (SBN) at Fermilab

The Short-Baseline Neutrino (SBN) physics program will involve three LAr-TPC detectors located along the Booster Neutrino Beam (BNB) at Fermilab. This new SBN Program will deliver a rich and compelling physics opportunity, including the ability to resolve a class of experimental anomalies in neutrino physics and to perform the most sensitive search to date for sterile neutrinos at the eV mass-scale through both appearance and disappearance oscillation channels. The Program will be composed of an existing and operational detector known as Micro Boone (170 ton LAr mass) plus two new experiments known as the SBN Near Detector (SBND, ~ 260 ton) and the SBN Far Detector (SBN-FD, ~ 600 tons). Fermilab is now building two new facilities to house the experiments and incorporate all cryogenic and process systems to operate these detectors beginning in the 2018-2019 time frame. The SBN cryogenics are a collaborative effort between Fermilab and CERN. The SBN cryogenic systems for both detectors are composed of several sub-systems: External/Infrastructure (or LN2), Proximity (or LAr), and internal cryogenics. For each detector the External/Infrastructure cryogenics includes the equipment used to store and the cryogenic fluids needed for the operation of the Proximity cryogenics, including the LN2 and LAr storage facilities. The Proximity cryogenics consists of all the systems that take the cryogenic fluids from the external/infrastructure cryogenics and deliver them to the internal at the required pressure, temperature, purity and mass flow rate. It includes the condensers, the LAr and GAr purification systems, the LN2 and LAr phase separators, and the interconnecting piping. The Internal cryogenics is comprised of all the cryogenic equipment located within the cryostats themselves, including the GAr and LAr distribution piping and the piping required to cool down the cryostats and the detectors. These cryogenic systems will be engineered, manufactured, commissioned, and qualified by an international engineering team. This contribution presents the performance, the functional requirements and the modes of operation of the SBN cryogenics, and details the current status of the design, present and future needs.

Norris, Barry↗