Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installed system costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Costs to Automate Demand Response - Taxonomy and Results from Field Studies and Programs

During the past decade, the technology to automate demand response (DR) in buildings and industrial facilities has advanced significantly. Automation allows rapid, repeatable, reliable operation. This study focuses on costs for DR automation in commercial buildings with some discussion on residential buildings and industrial facilities. DR automation technology relies on numerous components, including communication systems, hardware and software gateways, standards-based messaging protocols, controls and integration platforms, and measurement and telemetry systems. This report compares cost data from several DR automation programs and pilot projects, evaluates trends in the cost per unit of DR and kilowatts (kW) available from automated systems, and applies a standard naming convention and classification or taxonomy for system elements. Median costs for the 56 installed automated DR systems studied here are about $200/kW. The deviation around this median is large with costs in some cases being an order of magnitude great or less than the median. This wide range is a result of variations in system age, size of load reduction, sophistication, and type of equipment included in cost analysis. The costs to automate fast DR systems for ancillary services are not fully analyzed in this report because additional research is needed to determine the total cost to install, operate, and maintain these systems. However, recent research suggests that they could be developed at costs similar to those of existing hot-summer DR automation systems. This report considers installation and configuration costs and does include the costs of owning and operating DR automation systems. Future analysis of the latter costs should include the costs to the building or facility manager costs as well as utility or third party program manager cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Anchoring Technology (Final Technical Report)

It is generally conceded that the costs associated with current practices for the mooring, anchoring, or foundation systems of Marine HydroKinetic (MHK) and Deepwater Floating Wind systems are a disproportionate portion of the total cost of an installed system. Reducing the cost of the mooring and anchoring components for MHK systems can contribute substantially to reducing the levelized cost of electricity (LCOE).

16 TIDAL AND WAVE POWER↗

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 566 MW, equal to 71% of all grid-connected PV capacity installed in the U.S. through 2008, representing the most comprehensive source of installed PV cost data for the U.S.9 The report also briefly compares recent PV installed costs in the U.S. to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, and is primarily summarized in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. rack-mounted). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and Federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section.

14 SOLAR ENERGY↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PVsystem installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by projectmanagers at leading U.S. installers. The cost models are constructed through a 'bottoms-up' assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to aninstaller, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

14 SOLAR ENERGY↗

Transformational Solid Oxide Fuel Cell (SOFC) Technology

This project was conducted under the Co-operative Agreement No. DE-FE0027584 with the US Department Energy to developed advanced Solid Oxide Fuel Cell (SOFC) Technologies. The overall objective of this project was to advance SOFC technology at the cell and stack level to enhance cell robustness and durability, increase performance, and reduce balance-of-plant (BOP) requirements. By reducing system complexity combined with the increases in power density and efficiency, the ultimate goal of the project was to increased reliability and to reduce capital and operating costs of installed systems. The project was focused on pathways that will reduce the cost of the SOFC cell and stack, including the following areas: Robust, redox tolerant cell technology Lower cost cell manufacturing through advances in cell design, which will reduce the amount of material, energy and time used in the fabrication of SOFCs High performance, low temperature electrolyte based on improvement of established materials Innovative SOFC stack architecture which truly integrates Balance of Plant functionality into the stack level design Thermal management of the fuel cell stack for increased durability and expanded window of operation Novel stack design amenable for use in sub-MW to multi-MW-scale power plants and having low replacement cost The incorporation of balance-of-plant (BOP) equipment into the stack platform increased the economic viability of smaller scale systems. The project objectives were met by a multi-prong approach, including new cell design complemented with modifications to existing cell technology, as well as a new stack design incorporating components typically included in the BOP, such as heat exchangers, oxidizer, fuel reformers, and recycle systems. The project culminated with demonstration of a stack test validating the viability of the cell and stack improvements. A cost model was also developed to estimate costs for the advanced stack technology at high volume manufacturing levels. The net outcome of the project is SOFC cell and stack technology with costs significantly below current DOE targets without compromising and, in some cases, improving on the performance and degradation rate demonstrated with the current state-of-the-art stack design. The results of this project advanced the reliability, robustness, and endurance of low-cost SOFC technology that ultimately are ready to be deployed in coal power systems with greater than 60 percent efficiency (based on higher heating value of fuel) and the capability for ≥97% CO 2 capture at a cost-of-electricity that is approximately 40 percent below presently available Integrated Gasification Combined Cycle systems.

03 NATURAL GAS↗

Solar soft cost ontology for multi-stakeholder knowledge base

Introduction: Solar soft costs can account for 60% of the cost of an installed solar system, thus cost reductions for solar hinge on reducing soft costs. Soft costs are most frequently defined as non-hardware costs. Defining something by what it isn’t makes it inherently difficult to identify what exactly it is, which in turn makes it difficult to study. Our goal is to develop an ontology that identifies 1) a consistent and defined soft cost vocabulary, 2) who creates, shares and acquires soft cost knowledge, and 3) the learning processes used to facilitate knowledge flows. Ultimately, identifying these aspects of solar soft costs will provide a pathway for public policy and market interventions to reduce soft costs. Methods: To build the solar soft cost ontology (SSCO) we built a corpus of solar soft cost literature (through keyword search), then coded the corpus for all concepts related to or influencing costs, barriers, or time. Finally, we organized the concepts into taxonomies, including soft costs and network actors, and developed the properties (i.e., attributes and relationships) that link the concepts. In phase two, we will code a set of solar installer case studies and complimentary solar sector (e.g., distributors, software providers, trade organizations) firm case studies to update the SSCO, documenting changes and additions resulting from the use of practitioner feedback. Results and Discussion: The resulting SSCO includes concepts, attributes, and relationships that provide a rich and deep knowledge base that merges academic and practitioner expertise to create a shared and exhaustive vocabulary related to soft costs, a network of actors that impact those soft costs, and the attributes and relationships that connect them. The applications of the SSCO extend to a diverse group of stakeholders, including researchers, policy makers, and practitioners, engaged in reducing solar soft costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Reduction Roadmap for Residential Solar Photovoltaics (PV), 2017-2030

The installed cost of solar photovoltaics (PV) has fallen rapidly in recent years and is expected to continue declining in the future. In this report, we focus on the potential for continued PV cost reductions in the residential market. From 2010 to 2017, the levelized cost of energy (LCOE) for residential PV declined from 52 cents per kilowatt-hour (cents/kWh) to 16 cents/kWh (Fu et al. 2017). The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) recently set new LCOE targets for 2030, including a target of 5 cents/kWh for residential PV. We present a roadmap for achieving the SETO 2030 residential PV target. Because the 2030 target likely will not be achieved under business-as-usual trends (NREL 2017), we examine two key market segments that demonstrate significant opportunities for cost savings and market growth: installing PV at the time of roof replacement and installing PV as part of the new home construction process. Within both market segments, we identify four key cost-reduction opportunities: market maturation, business model integration, product innovation, and economies of scale. To assess the potential impact of these cost reductions, we compare modeled residential PV system prices in 2030 to the National Renewable Energy Laboratory's (NREL's) quarter one 2017 (Q1 2017) residential PV system price benchmark (Fu et al. 2017). We use a bottom-up accounting framework to model all component and project-development costs incurred when installing a PV system. The result is a granular accounting for 11 direct and indirect costs associated with installing a residential PV system in 2030. All four modeled pathways demonstrate significant installed-system price savings over the Q1 2017 benchmark, with the visionary pathways yielding the greatest price benefits. The largest modeled cost savings are in the supply chain, sales and marketing, overhead, and installation labor cost categories. When we translate these installed-system costs into LCOE, we find that the less-aggressive pathways achieve significant cost reductions, but may not achieve the 2030 LCOE target. On the other hand, both visionary pathways could get very close to (for roof replacement) or achieve (for new construction) the 2030 target. Our analysis has two key implications. First, because installed-system soft cost reductions account for about 65 percent of the LCOE reductions in 2030 for both visionary pathways, residential PV stakeholders may need to emphasize these soft cost reductions to achieve the 2030 target. Second, capturing these savings will likely require considerable innovation in the technologies and business practices employed by the PV industry.

14 SOLAR ENERGY↗

GaAs/silicon PVMirror tandem photovoltaic mini‐module with 29.6% efficiency with respect to the outdoor global irradiance

Abstract Balance‐of‐system costs now dominate the installed cost of photovoltaic systems, causing the annually averaged module efficiency to become a primary system cost driver. The resulting continued push towards higher module efficiencies, coupled with the dominance of single‐axis tracking in the utility‐scale PV market, may create an opportunity for a low‐concentration tandem module technology. Here, we demonstrate such a tandem, using the “PVMirror” concept, on the mini‐module scale. The tandem couples a (concentrating) silicon PVMirror having an aperture area of 156.25 cm 2 with a gallium arsenide receiver to achieve 29.6% efficiency with respect to the outdoor global irradiance. Unlike most concentrating technologies, the silicon PVMirror collects some of the diffuse light, but the tandem would nevertheless achieve 31% efficiency in the absence of diffuse light, as in a laboratory measurement. The same tandem technology can be implemented with a wide‐bandgap thin‐film PVMirror and silicon receiver—a potentially cost‐competitive combination—when efficient wide‐bandgap cells have been developed.

Yu, Zhengshan J.↗

An Analysis on Cost Reduction Potential of Vertical Bore Ground Heat Exchangers Used for Ground Source Heat Pump Systems

The cost for installing ground heat exchangers (GHXs) used for ground source heat pump (GSHP) systems usually accounts for more than 30% of the total cost of a GSHP system and it is the biggest contributor to the cost premium of GSHPs compared with conventional HVAC systems. This study evaluates the cost reduction potential of several possible improvements in borehole heat transfer and bore field layout. A detailed cost model for GHX installation was updated and new features were added to account for various GHX designs, geological conditions, and drilling technologies. Coupled with a well-established GHX sizing program, a systematic study was conducted to assess the impacts of these improvements on the needed total drilling length and resulting cost under various geological and loading conditions. Finally, improvements with significant potential to reduce GHX installation cost are recommended.

Liu, Xiaobing↗

SolarAPP+ Enhancements and Commercialization (Final Technical Report)

With millions of distributed photovoltaic (PV) systems expected to be installed over the next five years, the permitting and inspection processes of authorities having jurisdiction (AHJs) may become overburdened, causing delays and increased costs for installed systems (Cruce et al. 2022). The central goal of this project was to automate and streamline permitting processes for distributed PV systems and complementary technologies, such as battery storage. Deploying automated permitting has been hypothesized to reduce permit review times, resulting in reduced costs and improved customer experience. This has the potential to expand the PV and PV-plus-storage market nationwide. The National Renewable Energy Laboratory (NREL) and its project partners, including UL Solutions, the Interstate Renewable Energy Council (IREC), the International Code Council (ICC), and more, developed the Solar Automated Permit Processing (SolarAPP+™) software platform to reduce permit review times. NREL and its partners also collaborated with the solar industry, the building safety community, and local governments to develop SolarAPP+.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called "combi" systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loads for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called 'combi' systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loads for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrofit Integrated Space & Water Heating: Field Assessment: Minneapolis, Minnesota (Fact Sheet)

This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water and forced air space heating. Called 'Combi' systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (EF of 0.60). Better insulation and tighter envelopes are reducing space heating loads for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Photovoltaic Manufacturing Consortium (PVMC) – Enabling America’s Solar Revolution

The U.S. Photovoltaic Manufacturing Consortium (US-PVMC) is an industry-led consortium which was created with the mission to accelerate the research, development, manufacturing, field testing, commercialization, and deployment of next-generation solar photovoltaic technologies. Formed as part of the U.S. Department of Energy's (DOE) SunShot initiative, and headquartered in New York State, PVMC is managed by the State University of New York Polytechnic Institute (SUNY Poly) at the Colleges of Nanoscale Science and Engineering. PVMC is a hybrid of industry-led consortium and manufacturing development facility, with capabilities for collaborative and proprietary industry engagement. Through its technology development programs, advanced manufacturing development facilities, system demonstrations, and reliability and testing capabilities, PVMC has demonstrated itself to be a recognized proving ground for innovative solar technologies and system designs. PVMC comprises multiple locations, with the core manufacturing and deployment support activities conducted at the Solar Energy Development Center (SEDC), and the core Si wafering and metrology technologies being headed out of the University of Central Florida. The SEDC provides a pilot line for proof-of-concept prototyping, offering critical opportunities to demonstrate emerging concepts in PV manufacturing, such as evaluations of innovative materials, system components, and PV system designs. The facility, located in Halfmoon NY, encompasses 40,000 square feet of dedicated PV development space. The infrastructure and capabilities housed at PVMC includes PV system level testing at the Prototype Demonstration Facility (PDF), manufacturing scale cell & module fabrication at the Manufacturing Development Facility (MDF), cell and module testing, reliability equipment on its PV pilot line, all integrated with a PV performance database and analytical characterizations for PVMC and its partners test and commercial arrays. Additional development and deployment support are also housed at the SEDC, such as cost modeling and cost model based development activities for PV and thin film modules, components, and system level designs for reduced LCOE through lower installation hardware costs, labor reductions, soft costs and reduced operations and maintenance costs. The progression of the consortium activities started with infrastructure and capabilities build out focused on CIGS thin film photovoltaics, with a particular focus on flexible cell and module production. As marketplace changes and partners objectives shifted, the consortium shifted heavily towards deployment and market pull activities including Balance of System, cost modeling, and installation cost reduction efforts along with impacts to performance and DER operational costs. The consortium consisted of a wide array of PV supply chain companies from equipment and component suppliers through national developers and installers with a particular focus on commercial scale deployments (typically 25 to 2MW installations). With DOE funding ending after the fifth budget period, the advantages and disadvantages of such a consortium is detailed along with potential avenues for self-sustainability is reviewed.

14 SOLAR ENERGY↗

Low-Cost, Light Weight, Thin Film Solar Concentrator

This research addresses a cost barrier towards achieving a solar thermal collector system with an installed cost of $75/sq m and meet the Department of Energy's (DOE's) performance targets for optical errors, operations during windy conditions and lifetime. Current concentrators can cost as much as 40-50% of the total installed costs for a CSP plant. In order to reduce the costs from current $200-$250/sq m, it is important to focus on the overall system. The reflector surface is a key cost driver, and our film-based polymer reflector will help significantly in achieving DOE's cost target of $75/sq m. The ease of manufacturability, installation and replacement make this technology a compelling one to develop. This technology can be easily modified for a variety of CSP options including heliostats, parabolic dishes and parabolic troughs.

Concentrating Solar Power (CSP)↗

Financing, Overhead, and Profit: An In-Depth Discussion of Costs Associated with Third-Party Financing of Residential and Commercial Photovoltaic Systems

Previous work quantifying the non-hardware balance-of-system costs -- or soft costs -- associated with building a residential or commercial photovoltaic (PV) system has left a significant portion unsegmented in an 'other soft costs' category. This report attempts to better quantify the 'other soft costs' by focusing on the financing, overhead, and profit of residential and commercial PV installations for a specific business model. This report presents results from a bottom-up data-collection and analysis of the upfront costs associated with developing, constructing, and arranging third-party-financed residential and commercial PV systems. It quantifies the indirect corporate costs required to install distributed PV systems as well as the transactional costs associated with arranging third-party financing.

14 SOLAR ENERGY↗

A Novel, Low-Cost, Reduced-Sensor Approach for Providing Smart Renote Monitoring and Diagnostics for Packaged Air Conditioners and Heat Pumps

This report describes conceptually an approach to providing automated remote performance and conditioning monitoring and fault detection for air conditioners and heat pumps that shows great promise to reduce the capital and installation costs of such systems from over $1000 per unit to $200 to $400 per unit. The approach relies on non-intrusive electric load monitoring (NIELM) to enable separation of the power use signals of compressors and fans in the air conditioner or heat pump. Then combining information on the power uses and one or two air temperature measurements, changes in energy efficiency and occurrence of major faults would be detected. By decreasing the number of sensors used from between ten and twenty in current diagnostic monitoring systems to three for the envisaged system, the capital cost of the monitoring system hardware and the cost of labor for installation would be decreased significantly. After describing the problem being addressed and the concept for performance monitoring and fault detection in more detail, the report identifies specific conditions and faults that the proposed method would detect, discusses specific needs for successful use of the NIELM approach, and identifies the major elements in the path from concept to a commercialized monitoring and diagnostic system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗