Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructure optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Sustainable Port Operations: Powered by NREL

Seaports are vital economic hubs that allow the United States to compete on a global scale. But the heavy vehicles and cargo equipment that enable their operations also emit harmful air pollutants and greenhouse gas emissions. For nearly two decades, National Renewable Energy Laboratory (NREL) researchers have worked toward comprehensive seaport decarbonization. They fuse world-class analysis with deep vehicle and transportation systems knowledge to guide strategic deployment of low- and zero-emissions vehicles, charging and refueling infrastructure, and grid improvements. Together, these capabilities can enable sustainable port operations. This fact sheet outlines major seaport and airport decarbonization capabilities across the laboratory, including: fleet research, energy data, and insights for decarbonization; comprehensive hydrogen infrastructure deployment; optimized charging through grid integration; strategic blueprinting for clean, optimized technology deployment; and integrating diversity, equity, inclusion, and accessibility considerations into decarbonization efforts.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Ontario International Airport Fleet Electrification Blueprint: Zero-Emission Vehicle Technology Assessment for Energy Optimization [Slides]

Ontario International Airport Authority (OIAA)'s Electric Vehicle (EV) Blueprint project presentation focuses on the possibilities for fleet electrification, including medium heavy duty charging and hydrogen refueling and their associated planning, infrastructure, operation, and maintenance options. This report includes detailed list of available electric ground support equipment (GSE), description of NREL tools for EV infrastructure design and optimization, and analyses of the current fleet and the potential grid impacts of electrification. Key recommendations are made in regard to simulation-based and in-depth system analyses to identify optimal charging infrastructure and long-term grid stability, and to ensure that the selected station architecture will provide enough space and capacity for future expansion and resiliency.

30 DIRECT ENERGY CONVERSION↗

Cooling Matters: Benchmarking Large Language Models and Vision-Language Models on Liquid-Cooled Versus Air-Cooled H100 GPU Systems

The unprecedented growth in artificial intelligence (AI) workloads, recently dominated by large language models (LLMs) and vision-language models (VLMs), has intensified power and cooling demands in data centers. This study benchmarks LLMs and VLMs on two HGX nodes, each with 8× NVIDIA H100 graphics processing units (GPUs), using liquid and air cooling. Leveraging GPU Burn, Weights & Biases, and IPMItool, we collect detailed thermal, power, and computation data. Results show that the liquid-cooled systems maintain GPU temperatures between 41-50$^\circ$C, while the air-cooled counterparts fluctuate between 54-72$^\circ$C under load. This thermal stability of liquid-cooled systems yields 17% higher performance (54 TFLOPs/ GPU vs. 46 TFLOPs/GPU), performance-per-watt, reduced energy overhead, and greater system efficiency than the air-cooled counterparts. These findings underscore the energy and sustainability benefits of liquid cooling, offering a compelling path forward for hyperscale data centers seeking to optimize AI infrastructure. https://github.com/iscaas/Cooling-Matters.

Latif, Imran↗

EVI-EnSitePy (Electric Vehicle Infrastructure – Energy Estimation and Site Optimization Tool in Python) [EVI-X Modeling Suite] [SWR-25-07]

EVI-EnSitePy is a comprehensive agent-based tool designed for the analysis and design of high-power charging sites, encompassing a wide array of site agents including Electric Vehicles (EVs), chargers, energy storage units (ESS), renewable energy resources (DER), and loads. This versatile tool offers diverse functionalities and a modular modeling approach, allowing detailed configuration of agents based on power ratings, port numbers, energy capacities, demand requirements, charger interfaces, and flexibility to customize the tool for project specific goals. By simulating agent interactions and employing various metrics, EVI-EnSitePy enables the assessment of site performance, exploration of energy management systems (EMS), and implementation of innovative EV charging policies. Utilizing EV charge schedules and arrival states, the tool performs thorough charging site simulations, with outputs consisting of agent and site-level power profiles and statistical metrics. Employing a tree graph structure, EVI-EnSitePy supports nested site structures and power distribution modeling. The tool's ability to generate charging schedules deterministically or via stochastic analysis further enhances its versatility. Through its features and capabilities, EVI-EnSitePy offers a powerful platform for informed decision-making in the realm of high-power charging site design and operation.

Jackson, Derek [National Renewable Energy Laborato↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

reVRt (reV Routing) [SWR-25-112]

The reV Routing (reVRt) tool is a computational framework for modeling and optimizing transmission infrastructure requirements for electrical grid connections. By employing a spatially-aware least-cost-path methodology, it allows users to incorporate a wide range of factors including siting constraints, regional component costs, land composition costs, point-of-interconnection costs, and network upgrade costs. Additionally, the tool enables advanced follow-on analyses, such as land characterization for potential transmission line routes, to support informed decision-making. Although it's designed to integrate seamlessly with the reV model, the reV Routing tool is versatile and can also be utilized independently for standalone analyses in transmission planning and resource assessment scenarios.

Pinchuk, Pavlo (Paul) [National Renewable Energy L↗

Spinoff 2010

Topics covered include: Burnishing Techniques Strengthen Hip Implants; Signal Processing Methods Monitor Cranial Pressure; Ultraviolet-Blocking Lenses Protect, Enhance Vision; Hyperspectral Systems Increase Imaging Capabilities; Programs Model the Future of Air Traffic Management; Tail Rotor Airfoils Stabilize Helicopters, Reduce Noise; Personal Aircraft Point to the Future of Transportation; Ducted Fan Designs Lead to Potential New Vehicles; Winglets Save Billions of Dollars in Fuel Costs; Sensor Systems Collect Critical Aerodynamics Data; Coatings Extend Life of Engines and Infrastructure; Radiometers Optimize Local Weather Prediction; Energy-Efficient Systems Eliminate Icing Danger for UAVs; Rocket-Powered Parachutes Rescue Entire Planes; Technologies Advance UAVs for Science, Military; Inflatable Antennas Support Emergency Communication; Smart Sensors Assess Structural Health; Hand-Held Devices Detect Explosives and Chemical Agents; Terahertz Tools Advance Imaging for Security, Industry; LED Systems Target Plant Growth; Aerogels Insulate Against Extreme Temperatures; Image Sensors Enhance Camera Technologies; Lightweight Material Patches Allow for Quick Repairs; Nanomaterials Transform Hairstyling Tools; Do-It-Yourself Additives Recharge Auto Air Conditioning; Systems Analyze Water Quality in Real Time; Compact Radiometers Expand Climate Knowledge; Energy Servers Deliver Clean, Affordable Power; Solutions Remediate Contaminated Groundwater; Bacteria Provide Cleanup of Oil Spills, Wastewater; Reflective Coatings Protect People and Animals; Innovative Techniques Simplify Vibration Analysis; Modeling Tools Predict Flow in Fluid Dynamics; Verification Tools Secure Online Shopping, Banking; Toolsets Maintain Health of Complex Systems; Framework Resources Multiply Computing Power; Tools Automate Spacecraft Testing, Operation; GPS Software Packages Deliver Positioning Solutions; Solid-State Recorders Enhance Scientific Data Collection; Computer Models Simulate Fine Particle Dispersion; Composite Sandwich Technologies Lighten Components; Cameras Reveal Elements in the Short Wave Infrared; Deformable Mirrors Correct Optical Distortions; Stitching Techniques Advance Optics Manufacturing; Compact, Robust Chips Integrate Optical Functions; Fuel Cell Stations Automate Processes, Catalyst Testing; Onboard Systems Record Unique Videos of Space Missions; Space Research Results Purify Semiconductor Materials; and Toolkits Control Motion of Complex Robotics.

Source record↗

NASA's Carbon Monitoring System Flux-Pilot Project: A Multi-Component Analysis System for Carbon-Cycle Research and Monitoring

The importance of greenhouse gas increases for climate motivates NASA s observing strategy for CO2 from space, including the forthcoming Orbiting Carbon Observatory (OCO-2) mission. Carbon cycle monitoring, including attribution of atmospheric concentrations to regional emissions and uptake, requires a robust modeling and analysis infrastructure to optimally extract information from the observations. NASA's Carbon-Monitoring System Flux-Pilot Project (FPP) is a prototype for such analysis, combining a set of unique tools to facilitate analysis of atmospheric CO2 along with fluxes between the atmosphere and the terrestrial biosphere or ocean. NASA's analysis system is unique, in that it combines information and expertise from the land, oceanic, and atmospheric branches of the carbon cycle and includes some estimates of uncertainty. Numerous existing space-based missions provide information of relevance to the carbon cycle. This study describes the components of the FPP framework, assessing the realism of computed fluxes, thus providing the basis for research and monitoring applications. Fluxes are computed using data-constrained terrestrial biosphere models and physical ocean models, driven by atmospheric observations and assimilating ocean-color information. Use of two estimates provides a measure of uncertainty in the fluxes. Along with inventories of other emissions, these data-derived fluxes are used in transport models to assess their consistency with atmospheric CO2 observations. Closure is achieved by using a four-dimensional data assimilation (inverse) approach that adjusts the terrestrial biosphere fluxes to make them consistent with the atmospheric CO2 observations. Results will be shown, illustrating the year-to-year variations in land biospheric and oceanic fluxes computed in the FPP. The signals of these surface-flux variations on atmospheric CO2 will be isolated using forward modeling tools, which also incorporate estimates of transport error. The results will be discussed in the context of interannual variability of observed atmospheric CO2 distributions.

Pawson, S.↗

Advance Local Mobility Through Energy Efficient Mobility Systems Technologies

Everyone deserves reliable, affordable, and safe transportation to connect people to jobs, healthcare, education, and recreation. Our transportation systems are interconnected, multimodal networks working together to move people and goods. These systems are dynamic and are being reshaped by factors such as population trends, new technologies, shifting labor models, economic forces, and changing climate. Energy efficient mobility systems (EEMS) technologies can help transportation planners ensure changes in our transportation systems are equitable and sustainable by improving energy efficiency, travel time, and affordability, as well as overall access to mobility. Transportation planners and decision makers can use the following EEMS tools and strategies to advance local mobility.

ADVANCED PROPULSION SYSTEMS↗

EVI-LOCATE: One Stop Solution for Estimating Cost of Installing EV Charging Stations

EVI-LOCATE (Electric Vehicle Infrastructure-Locally Optimized Cost Assessment Tool and Estimator) is a site assessment tool to estimate costs to install EV charging stations. EVI-LOCATE enables users to generate site-specific, user-specific, and location-specific EV charging station installation designs and cost estimates. The tool integrates National Electrical Code, deep-learning pixel classification algorithm, and component-level costs to estimate the costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Airport Infrastructure Expansion Under Uncertainty

Multistage stochastic optimization can help transportation hubs like airports and seaports plan for future infrastructure expansion while considering risks from emerging technologies and changes in demand.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Model to inform the expansion of hydrogen distribution infrastructure

A growing hydrogen economy requires new hydrogen distribution infrastructure to link geographically distributed hubs of supply and demand. The Hydrogen Optimization with Deployment of Infrastructure (HOwDI) Model helps meet this requirement. The model is a spatially resolved optimization framework that determines location-specific hydrogen production and distribution infrastructure to cost-optimally meet a specified location-based demand. While these results are useful in understanding hydrogen infrastructure development, there is uncertainty in some costs that the model uses for inputs. Thus, the project team took the modeling effort a step further and developed a Monte Carlo methodology to help manage uncertainties. Seven scenarios were run using existing infrastructure and new demand in Texas exploring different policy and tax approaches. The inclusion of tax credits increased the percentage of runs that could deliver hydrogen at <$\$4$ /kg from 31% to 77% and decreased the average dispensed cost from $\$4.35$ /kg to $\$3.55$ /kg. However, even with tax credits there are still some runs where unabated SMR is deployed to meet new demand as the low-carbon production options are not competitive. Every scenario, except for the zero-carbon scenario (without tax credits), resulted in at least 20% of the runs meeting the $\$4$ /kg dispensed fuel cost target. This indicates that multiple pathways exist to deliver $\$4$ /kg hydrogen.

08 HYDROGEN↗

Medium and Heavy-Duty Electric Vehicle Infrastructure - Load Operations and Deployment (HEVI-LOAD) v1.0

In order to support the California state goals to reduce the carbon and pollution emissions (AB2127), The goal of this project (HEVI-Pro) is to project the charging infrastructure needs by future medium- and heavy- duty electric vehicles, and assess optimal deployment the infrastructure in California and provide grid impacts analysis. The MHDV projections will also consider transportation system and electric system interaction with light duty vehicles. The project consists of 2 approaches in general: top-down approach that takes aggregated MHDV adoptions as the inputs and provide the county-level projections of charging load profile and infrastructure need, and the bottom-up approach that that incorporates more granular (temporal, spatial and duty-cycle-specific) behaviors of a variety of MHDVs into activity simulations/optimizations for further analysis.

Wang, Bin↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

Real-Time Optimization and Control of Next-Generation Distribution Infrastructure

This presentation highlights the key developments of the ARAP-e NODES project, including the innovative real-time optimal power flow (RT-OPF) algorithm for distributed energy resource (DER) management, trip planning for T+D coordination, and extensive validation of the RT-OPF algorithm in NREL ESIF laboratory with 100+ physical hardware devices, controller-hardware-in-the-loop test at Southern California Edison (SCE), and two field demonstrations.

hardware-in-the-loop↗

Providing Levelized Cost and Waiting Time Inputs for HDV Hydrogen Refueling Station Planning: A Case Study of U.S. I-75 Corridor

Widespread use of diesel fuels in freight transportation leads to greenhouse gas (GHG) emissions that play an important role in air pollution. The air pollution, as well as the energy crisis, drives the transition from diesel fuel to cleaner and more energy-efficient fuels such as hydrogen fuels. With such a transition, the strategic planning and optimization of supporting refueling infrastructure along the national highway for heavy-duty vehicles (HDVs) become a necessity. Cost and service level are two essential factors to be considered in hydrogen refueling station location and capacity optimization. The service level in this study is assessed by the delay (waiting time) at fueling stations as well as the fueling demand fulfilled. To this end, this study presents a methodology to provide waiting time (delay) and levelized hydrogen fuel cost inputs under different station configurations (number of dispensers and fill rates) for hydrogen refueling station planning. Determining the station configurations based on the trade-off between the two inputs is further discussed. Particularly, this study points out that the levelized cost and waiting time are affected by hourly demand patterns and estimates the two inputs under different peak hour fueling demand scenarios. The results suggest that, with the same daily demand, the cost, as well as the waiting time, increases obviously with the peak hour demand. In the case study, the cost grows at least 30% when the peak hour visit frequency of the daily total visits increases from 5% (evenly distributed pattern) to 10% (the most common pattern for existing diesel fueling stations along I-75). Accounting for this peak hour effect in hydrogen refueling station planning is recommended. Overall, the waiting time model and cost analysis provide key inputs for optimizing hydrogen refueling station location and configurations based on anticipated refueling demand patterns. The paper is the second in a series that aims to build a comprehensive modeling plan and optimize hydrogen refueling infrastructure along the Interstate 75 (I-75) corridor for HDVs.

Liu, Yuandong↗