Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “historical timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A Comparison Between Orion Automated and Space Shuttle Rendezvous Techniques

The Orion spacecraft will replace the space shuttle and will be the first human spacecraft since the Apollo program to leave low earth orbit. This vehicle will serve as the cornerstone of a complete space transportation system with a myriad of mission requirements necessitating rendezvous to multiple vehicles in earth orbit, around the moon and eventually beyond . These goals will require a complex and robust vehicle that is, significantly different from both the space shuttle and the command module of the Apollo program. Historically, orbit operations have been accomplished with heavy reliance on ground support and manual crew reconfiguration and monitoring. One major difference with Orion is that automation will be incorporated as a key element of the man-vehicle system. The automated system will consist of software devoted to transitioning between events based on a master timeline. This effectively adds a layer of high level sequencing that moves control of the vehicle from one phase to the next. This type of automated control is not entirely new to spacecraft since the shuttle uses a version of this during ascent and entry operations. During shuttle orbit operations however many of the software modes and hardware switches must be manually configured through the use of printed procedures and instructions voiced from the ground. The goal of the automation scheme on Orion is to extend high level automation to all flight phases. The move towards automation represents a large shift from current space shuttle operations, and so these new systems will be adopted gradually via various safeguards. These include features such as authority-to-proceed, manual down modes, and functional inhibits. This paper describes the contrast between the manual and ground approach of the space shuttle and the proposed automation of the Orion vehicle. I will introduce typical orbit operations that are common to all rendezvous missions and go on to describe the current Orion automation architecture and contrast it with shuttle rendezvous techniques and circumstances. The shuttle rendezvous profile is timed to take approximately 3 days from orbit insertion to docking at the International Space Station (ISS). This process can be divided into 3 phases: far-field, mid-field and proximity operations. The far-field stage is characterized as the most quiescent phase. The spacecraft is usually too far to navigate using relative sensors and uses the Inertial Measurement Units (IMU s) to numerically solve for its position. The maneuvers are infrequent, roughly twice per day, and are larger than other burns in the profile. The shuttle uses this opportunity to take extensive ground based radar updates and keep high fidelity orbit states on the ground. This state is then periodically uplinked to the shuttle computers. The targeting solutions for burn maneuvers are also computed on the ground and uplinked. During the burn the crew is responsible for setting the shuttle attitude and configuring the propulsion system for ignition. Again this entire process is manually driven by both crew and ground activity. The only automatic processes that occur are associated with the real-time execution of the burn. The Orion automated functionality will seek to relieve the workload of both the crew and ground during this phase

Ruiz, Jose O,↗

CRYOGENIC UPPER STAGE SYSTEM SAFETY

NASA s Exploration Initiative will require development of many new systems or systems of systems. One specific example is that safe, affordable, and reliable upper stage systems to place cargo and crew in stable low earth orbit are urgently required. In this paper, we examine the failure history of previous upper stages with liquid oxygen (LOX)/liquid hydrogen (LH2) propulsion systems. Launch data from 1964 until midyear 2005 are analyzed and presented. This data analysis covers upper stage systems from the Ariane, Centaur, H-IIA, Saturn, and Atlas in addition to other vehicles. Upper stage propulsion system elements have the highest impact on reliability. This paper discusses failure occurrence in all aspects of the operational phases (Le., initial burn, coast, restarts, and trends in failure rates over time). In an effort to understand the likelihood of future failures in flight, we present timelines of engine system failures relevant to initial flight histories. Some evidence suggests that propulsion system failures as a result of design problems occur shortly after initial development of the propulsion system; whereas failures because of manufacturing or assembly processing errors may occur during any phase of the system builds process, This paper also explores the detectability of historical failures. Observations from this review are used to ascertain the potential for increased upper stage reliability given investments in integrated system health management. Based on a clear understanding of the failure and success history of previous efforts by multiple space hardware development groups, the paper will investigate potential improvements that can be realized through application of system safety principles.

Smith, R. Kenneth↗

NASA's In-Space Manufacturing Project: Development of a Multimaterial, Multiprocess Fabrication Laboratory for the International Space Station

NASA's long term goal is to send humans to Mars. Over the next two decades, NASA will work with private industry to develop and demonstrate the technologies and capabilities needed to support exploration of the red planet by humans and ensure their safe return to earth. To accomplish this goal, NASA is employing a capability driven approach to its human spaceflight strategy. This approach will develop a suite of evolving capabilities which provide specific functions to solve exploration challenges. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing project, its past and current activities, and how technologies under development will ultimately culminate in a multimaterial, multiprocess fabrication laboratory ('FabLab') to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit may result in a loss of mission in transit to Mars. In order to have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The paper will discuss the phased approach to FabLab development, desired capabilities, and requirements for the hardware. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the FabLab will be tested on ISS, the system is ultimately intended for use in a deep space habitat or transit vehicle.

Prater, T.↗

NASA's In-Space Manufacturing Project: Toward a Multimaterial Fabrication Laboratory for the International Space Station

uman space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities, and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The paper provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into FabLab exploration capabilities as well.

Prater, Tracie↗

Century-long timelines of herbarium genomes predict plant stomatal response to climate change

Abstract Dissecting plant responses to the environment is key to understanding whether and how plants adapt to anthropogenic climate change. Stomata, plants’ pores for gas exchange, are expected to decrease in density following increased CO 2 concentrations, a trend already observed in multiple plant species. However, it is unclear whether such responses are based on genetic changes and evolutionary adaptation. Here we make use of extensive knowledge of 43 genes in the stomatal development pathway and newly generated genome information of 191 Arabidopsis thaliana historical herbarium specimens collected over 193 years to directly link genetic variation with climate change. While we find that the essential transcription factors SPCH, MUTE and FAMA, central to stomatal development, are under strong evolutionary constraints, several regulators of stomatal development show signs of local adaptation in contemporary samples from different geographic regions. We then develop a functional score based on known effects of gene knock-out on stomatal development that recovers a classic pattern of stomatal density decrease over the past centuries, suggesting a genetic component contributing to this change. This approach combining historical genomics with functional experimental knowledge could allow further investigations of how different, even in historical samples unmeasurable, cellular plant phenotypes may have already responded to climate change through adaptive evolution.

Environmental Sciences & Ecology↗

Historical Evolution of NASA Standard Materials Testing with Hypergolic Propellants and Ammonia (NASA Standard 6001 Test 15)

The NASA Johnson Space Center White Sands Test Facility (WSTF) has performed testing of hazardous and reactive aerospace fluids, including hypergolic propellants, with materials since the 1960s with the Apollo program. Amongst other test activities, Test 15 is a NASA standard test for evaluating the reactivity of materials with selected aerospace fluids, in particular hydrazine, monomethylhydrazine, uns-dimethylhydrazine, Aerozine 50, dinitrogen tetroxide oxidizers, and ammonia. This manuscript provides an overview of the history of Test 15 over a timeline ranging from prior to its development and first implementation as a NASA standard test in 1974 to its current refinement. Precursor documents to NASA standard tests, as they are currently known, are reviewed. A related supplementary test, international standardization, and enhancements to Test 15 are also discussed. Because WSTF was instrumental in the development and implementation of Test 15, WSTF experience and practices are referred to in this manuscript.

Greene, Benjamin↗

An Overview of STS-132 MRM1 Cargo Element Thermal Model Development and Analyses

STS-132 was launched in May 2010 and delivered the Russian Mini Research Module 1 (MRM1) cargo element to the International Space Station as part of the ULF-4 assembly flight. The cargo element consisted of the module outfitted with externally mounted Multi-purpose Laboratory Module (MLM) Airlock, MLM radiator, Portable Work Platform (PWP), and a European Robotic Arm (ERA) spare elbow. Prior to every Shuttle flight, hardware developers are required to determine compatibility of their hardware to thermal environments experienced during the Shuttle mission and once the element is integrated with the ISS. Thermal models are provided to the Shuttle program to determine the impact of the payload on the Orbiter hardware, as well as the ISS program to determine impacts on other ISS payloads in the Orbiter. Historically the Russian International Partner (IP) develops models in formats not compatible with software used by Space Shuttle or ISS programs. This prompted NASA and Lockheed Martin to develop a unique set of thermal models for the MRM1 cargo element. Subsequent ULF-4 mission analyses performed with the models assessed the launch to activation response, identified operational criteria documented in flight rules, and ensured compliance with the mission timeline and no hazards to the crew, orbiter, or ISS. This presentation provides an overview of the work performed, depicts unique approaches in model development, discusses lessons learned, and issue resolution approaches. Though development and analysis efforts spanned over four years and presented various integration challenges it provided an example of successful collaboration with our International Partners.

Perez, Miguel Fernando↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Time-Dependent Satellite Explosion Probabilities for Long-Term Orbital Debris Environment Modeling

On-orbit accidental explosions are a significant contributor to the growth of the orbital debris population. Certain types of satellites have been seen to exhibit different behaviors and timelines of explosions. Recent assessments of on-orbit explosions for three categories of satellites – Russian Sistema Obespecheniya Zapuska (SOZ, Proton 4th stage attitude and ullage motors) units, spacecraft, and rocket bodies – suggest that on-orbit explosions can be modeled using a continuous, time-dependent probability of explosion. This paper discusses the methodology for developing a time-dependent probability of explosion as a function of the satellite’s orbital lifetime based on historical explosions. The SOZ units are found to be best modeled by a modified Gaussian probability distribution, with the peak probability of explosion occurring around 10.4 years on-orbit. Spacecraft and rocket bodies both exhibit exponentially decaying explosion probabilities, with rocket bodies showing fast-, medium-, and slow-time modes of decay. Total cumulative probabilities of explosion are approximately 57% for SOZ units, 4% for spacecraft, and 2% for rocket bodies. Examples of implementation in a simulation of the orbital debris environment using NASA's long-term evolutionary model are given, showing the overall explosion behavior over two centuries is significantly different from that using a previously implemented constant-probability type-dependent explosion rate model and provides a better representation of the historical explosion record.

Alyssa P Manis↗

Oh, My Darling Clementine: A Detailed History and Data Repository of the Los Alamos Plutonium Fast Reactor

The Los Alamos Plutonium Fast Reactor, Clementine, provided the first fast neutron spectrum using a metallic plutonium fuel system and liquid mercury coolant. Clementine is often mentioned in the history of fast, metal-fueled, or metal-cooled designs, with little public information regarding the specifications or timeline. This paper contains a synopsis of each report regarding the development, operation, experimental results, failures, and subsequent disassembly of Clementine to explore this unique reactor within the context of modern advanced reactor development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NASA's In-Space Manufacturing Project: A Roadmap for a Multimaterial Fabrication Laboratory in Space

Human space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities (2014-2017), and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The presentation provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. In 2017, the in-space manufacturing project issued a broad agency announcement for this capability. Requirements of the Fabrication Laboratory as stated in the solicitation will be discussed. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into future exploration capabilities. Key data from ISM projects to date will also be summarized.

Prater, Tracie↗

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture↗

Extract useful information from building permits data to profile a city’s building retrofit history

Building retrofit is one of the key strategies for cities to reduce energy use and GHG emissions. The historical information about changes to buildings is crucial to infer the buildings’ current energy system efficiency levels and to identify candidate buildings for retrofit. In general, a building permit is required before the start of any construction activity of a building, such as changing building structure, remodeling, or installing new equipment. Moreover, many large cities provide public datasets of building permits in history. Therefore, the permits are a potentially good resource for mining information on the city’s retrofit history. In this study, we use the permit dataset from the city of San Francisco as a case study. Location and time information from the dataset is also used to depict the retrofit timeline of each building and the whole building stock. The type of work of the permit is inferred from the descriptive text by a machine learning model. At last, the limitations of the current permit dataset and potential improvements on the permit data management are discussed to better utilize the information in the future.

Zhang, Wanni↗

Evaluation of Hardware and Procedures for Astronaut Assembly and Repair of Large Precision Reflectors

A detailed procedure is presented that enables astronauts in extravehicular activity (EVA) to efficiently assemble and repair large (i.e., greater than 10m-diameter) segmented reflectors, supported by a truss, for space-based optical or radio-frequency science instruments. The procedure, estimated timelines, and reflector hardware performance are verified in simulated 0-g (neutral buoyancy) assembly tests of a 14m-diameter, offset-focus, reflector test article. The test article includes a near-flight-quality, 315-member, doubly curved support truss and 7 mockup reflector panels (roughly 2m in diameter) representing a portion of the 37 total panels needed to fully populate the reflector. Data from the tests indicate that a flight version of the design (including all reflector panels) could be assembled in less than 5 hours - less than the 6 hours normally permitted for a single EVA. This assembly rate essentially matches pre-test predictions that were based on a vast amount of historical data on EVA assembly of structures produced by NASA Langley Research Center. Furthermore, procedures and a tool for the removal and replacement of a damaged reflector panel were evaluated, and it was shown that EVA repair of this type of reflector is feasible with the use of appropriate EVA crew aids.

Lake, Mark S.↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

PersEIDS: A Biomedical Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Within the next few decades, humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant two-way communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) performing an EVA and an Earth-based mission control. Next-generation operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the on-planet extravehicular crewmember(s), and intermediate mission support from intravehicular crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. For this purpose, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automating the tracking and projection of consumables usage over an EVA timeline, providing real-time probabilistic safety assessments of an EVA timeline given consumables constraints, and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the intravehicular crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g. training bias.

Mars↗

The Current State and Future of the Former Central Nervous System Risk Managed by Space Radiation Element Part of NASA’s Human Research Program

Historically, the Space Radiation Element, as part of the NASA Human Research Program, was responsible for the scientific strategy and funding of research focused on characterizing and mitigating the effects of space radiation exposure on the central nervous system (CNS). During the past few years, there have been two major changes that have affected the management of the science associated with the CNS risk. The first major change was the integration of several related risks: CNS (C), behavioral medicine (B), and sensorimotor (S) to be managed as an integrated effort called CBS. CBS was formed to accelerate research on combined spaceflight stressors, specifically space radiation, microgravity, isolation, and confinement. CBS was managed by Human Factors and Behavioral Performance (HFBP) with support and inputs from Space Radiation as well as Human Health Countermeasures. Secondly, and more recently, the CNS risk was absorbed by the behavioral medicine risk currently also held by HFPB. As a result, the gaps associated with CNS were removed and aspects of them are represented in the BMED gaps (link). However, due to recent changes in element leadership, budget, and timeline, extensive restructuring of CBS is in progress. In addition, in an effort to harmonize datasets to be used in modeling efforts, an Animal Standardization TIM was held in June 2021 to standardize the type of behavioral and cognitive tasks as well as experimental set-ups used in animal models of future funded research. This presentation is an effort to communicate with the radiation research community concerning the strategy, management, and future of the former central nervous system risk and the role of the Space Radiation Element.

Janice A Zawaski↗