Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “high-voltage DC systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

39 records · Page 3

Scalable Hybrid Large-Scale dc-ac Grid Analysis Methods (Phase II)

The goals of the project included the identification and evaluation of a voltage source converter multiterminal high-voltage direct current (VSC-MTdc) system architecture suitable for a high amount of power transfer through long transmission lines.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing VSC-HVDC Oscillation Damping Control Constraints in Unit Commitment

High-voltage direct current (HVDC) systems within the existing power grids will play a pivotal role in enabling high share of renewable power integration and transportation electrification. There is a need for transmission planning models to accurately capture the impact of VSC-HVDC oscillation damping control on the system planning and model the constraints in the security constrained unit commitment (SCUC) problem. In this paper, the SCUC problem in a hybrid DC-AC grid considering damping on electromechanical inter-area oscillation is studied. An electromechanical oscillation-driven transmission capability constraints are derived from system swing equation and incorporated into the SCUC. Multiple system damping control scenarios are set based on the extracted plausible bounds of damping coefficient and inertia constant to linearize the nonlinear expressions. The SCUC problem with proposed constraints is tested on the IEEE 73-bus reliability test system (RTS) case via PLEXOS. The impact of the proposed constraints on regional generation, inertia, power flow, annual system cost, and renewable energy curtailment are fully assessed.

damping control↗