Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “groundwater monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

An Evaluation of Remotely Sensed and In-Situ Data Sufficiency for SGMA-Scale Groundwater Studies in the Central Valley, California

California’s Central Valley aquifer is a critical freshwater resource for the state, providing drinking water to 6.5 million residents and irrigation water for more than half of the nation’s produce. Increasing demands have led to a steady decline of aquifer water levels, leading to irreversible compaction and land subsidence. The Sustainable Groundwater Management Act of California (SGMA), instituted in 2014, requires high-priority regions to establish sustainability plans by 2020-2022 that mitigate groundwater depletion and land subsidence. Many regions within the Central Valley lack groundwater monitoring wells or continuous well data, rendering in-situ monitoring challenging. When combined with other data, NASA’s Gravity Recovery and Climate Experiment (GRACE) and GRACE Follow On (GRACE-FO) missions provide valuable information about groundwater storage changes at a sub-basin scale. Interferometric Surface Aperture Radar (InSAR) measurements can map land subsidence, and Global Positioning System (GPS) can be used to estimate crustal uplift. Yet, all of these measurements have differences in resolution, coverage, discretization, and record length. Here we assess the various datasets that are potentially useful for Central Valley sub-basin groundwater monitoring and provide an analysis of gaps and other issues in regard to their suitability for SGMA-related analysis. Finally, we offer next steps and recommendations on data treatment and integration.

Kyra H Kim↗

Marshall Islands Dose Assessment and Radioecology Program: Report on the (i) 2018 Visual Study of Exterior Concrete of the Cactus Crater Containment Structure (ii) Periodic Monitoring of Groundwater on Runit Island and (iii) Initial Health Risk Assessment from Contaminants in the Cactus Crater Containment Structure

In 2012, Congress passed P.L. 112-149, Insular Areas Act of 2011, which amended the Compact of Free Association Amendments Act of 2003 by assigning Cactus Crater containment monitoring and reporting requirements to the Secretary of Energy (Secretary). Effective January 1, 2012, the Secretary was required to “periodically (but not less frequently than every 4 years) conduct -- (I) a visual study of the concrete exterior of the Cactus Crater Containment Structure on Runit Island; and (II) a radiochemical analysis of the groundwater surrounding and in the Cactus Crater Containment Structure on Runit Island.” 48 U.S.C. 1921b(f)(1)(B)(i). The Secretary was also directed to submit to Congress a report describing the results of each visual survey and the radiochemical analysis and “a determination on whether the surveys and analyses indicate any significant change in the health risks to the people of Enewetak from the contaminants within the Cactus Crater Containment Structure.” 48 U.S.C. 1921b(f)(1)(B)(ii)(II).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

Johnson, Jill W.↗

Evaluation of a Model-Based Groundwater Drought Indicator in the Conterminous U.S.

Monitoring groundwater drought using land surface models is a valuable alternative given the current lack of systematic in situ measurements at continental and global scales and the low resolution of current remote sensing based groundwater data. However, uncertainties inherent to land surface models may impede drought detection, and thus should be assessed using independent data sources. In this study, we evaluated a groundwater drought index (GWI) derived from monthly groundwater storage output from the Catchment Land Surface Model (CLSM) using a GWI similarly derived from in situ groundwater observations. Groundwater observations were obtained from unconfined or semi-confined aquifers in eight regions of the central and northeastern U.S. Regional average GWI derived from CLSM exhibited strong correlation with that from observation wells, with correlation coefficients between 0.43 and 0.92. GWI from both in situ data and CLSM was generally better correlated with the Standard Precipitation Index (SPI) at 12 and 24 month timescales than at shorter timescales, but it varied depending on climate conditions. The correlation between CLSM derived GWI and SPI generally decreases with increasing depth to the water table, which in turn depends on both bedrock depth (a CLSM parameter) and mean annual precipitation. The persistence of CLSM derived GWI is spatially varied and again shows a strong influence of depth to groundwater. CLSM derived GWI generally persists longer than GWI derived from in situ data, due at least in part to the inability of coarse model inputs to capture high frequency meteorological variability at local scales. The study also showed that groundwater can have a significant impact on soil moisture persistence where the water table is shallow. Soil moisture persistence was estimated to be longer in the eastern U.S. than in the west, in contrast to previous findings that were based on models that did not represent groundwater. Assimilation of terrestrial water storage data from the Gravity Recovery and Climate Experiment (GRACE) satellite mission improved the correlation between CLSM based regional average GWI and that based on in situ data in six of the eight regions. Practical issues regarding the application of GRACE assimilated groundwater storage for drought detection are discussed. An important conclusion of this study is that model parameters that control the depth to the water table, including bedrock depth, strongly influence the evolution and persistence of simulated groundwater and require careful configuration for drought monitoring.

Evaluation↗

Evaluation of a Model-Based Groundwater Drought Indicator in the Conterminous U.S.

Monitoring groundwater drought using land surface models is a valuable alternative given the current lack of systematic in situ measurements at continental and global scales and the low resolution of current remote sensing based groundwater data. However, uncertainties inherent to land surface models may impede drought detection, and thus should be assessed using independent data sources. In this study, we evaluated a groundwater drought index (GWI) derived from monthly groundwater storage output from the Catchment Land Surface Model (CLSM) using a GWI similarly derived from in situ groundwater observations. Groundwater observations were obtained from unconfined or semi-confined aquifers in eight regions of the central and northeastern U.S. Regional average GWI derived from CLSM exhibited strong correlation with that from observation wells, with correlation coefficients between 0.43 and 0.92. GWI from both in situ data and CLSM was generally better correlated with the Standard Precipitation Index (SPI) at 12 and 24 month timescales than at shorter timescales, but it varied depending on climate conditions. The correlation between CLSM derived GWI and SPI generally decreases with increasing depth to the water table, which in turn depends on both bedrock depth (a CLSM parameter) and mean annual precipitation. The persistence of CLSM derived GWI is spatially varied and again shows a strong influence of depth to groundwater. CLSM derived GWI generally persists longer than GWI derived from in situ data, due at least in part to the inability of coarse model inputs to capture high frequency meteorological variability at local scales. The study also showed that groundwater can have a significant impact on soil moisture persistence where the water table is shallow. Soil moisture persistence was estimated to be longer in the eastern U.S. than in the west, in contrast to previous findings that were based on models that did not represent groundwater. Assimilation of terrestrial water storage data from the Gravity Recovery and Climate Experiment (GRACE) satellite mission improved the correlation between CLSM based regional average GWI and that based on in situ data in six of the eight regions. Practical issues regarding the application of GRACE assimilated groundwater storage for drought detection are discussed. An important conclusion of this study is that model parameters that control the depth to the water table, including bedrock depth, strongly influence the evolution and persistence of simulated groundwater and require careful configuration for drought monitoring.

hydrology↗

2023 Annual Long-Term Monitoring Report Vehicle Assembly Building Area

This report presents a summary of the groundwater monitoring activities that occurred in February 2024 at two sites in the Vehicle Assembly Building (VAB) Area Long-Term Monitoring (LTM) program at the John F. Kennedy Space Center, Florida. The two sites are Fire Station 3 (formerly Fire Station 6) (FS3) – Solid Waste Management Unit (SWMU) 106 and Launch Complex 39 Observation Gantry Area (LC39OGA) – SWMU 107.

VAB Long-Term Groundwater Monitoring↗

Components Cleaning Facility West SWMU 030 2024 Annual Long Term Monitoring Report

This document presents and summarizes the 2024 groundwater monitoring activities and the results of a localized direct-push technology investigation at CCF West in order to monitor the natural attenuation of chlorinated volatile organic compound (CVOC)-affected groundwater with concentrations above the state of Florida Chapter 62-777, Florida Administrative Code, groundwater cleanup target levels.

Richard Smith↗

Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Detection and Socio-Economic Attribution of Groundwater Depletion in India

Groundwater is a critical resource for both consumption and food security in India, where groundwater management faces significant challenges due to climate change and anthropogenic activities. Although several studies explored groundwater variability in India, few have focused on the socioeconomic attribution of these changes, utilizing data from industries, population and water demand. In this study, trends in groundwater storage were examined by leveraging the largest in situ dataset ever collated in India from ~27,000 groundwater wells, satellite-based terrestrial-water-storage estimates, and hydrological model simulations. Five major hotspots of groundwater depletion across India were identified using in situ measurements and previously untapped socioeconomic datasets to attribute these trends. Approximately 16% of Indian groundwater monitoring stations exhibited systematically decreasing trends in groundwater levels. These hotspots are primarily concentrated in the northern and northwestern parts of India as well as in the states of Chhattisgarh, West Bengal, and Kerala. The north/northwestern hotspots have experienced a staggering loss of ~6.46 × 10^10 m3 of water over the past two decades. The factors contributing to this depletion include population growth, rapid urbanization, proliferation of factories and the expansion of agriculture.

Gautam Kunwar↗

Geophysical Characterization of 200 TEDF to Support Discharge Permit Renewal

The Treated Effluent Disposal Facility (TEDF) is a site where treated non-hazardous and non-radioactive liquid wastes are collected and disposed of in two state-permitted disposal basins near the 200 East Area at the Hanford Site. In 2016, a renewal application was submitted for TEDF that requested mass loading effluent limits instead of concentration-based effluent limits. The Washington State Department of Ecology denied this request due to a lack of groundwater monitoring wells that can be used to identify and characterize the impact of TEDF discharges on the underlying groundwater. Current TEDF monitoring wells are screened in the confined aquifer below the Ringold Lower Mud (RLM) unit and are not representative of TEDF discharges that can potentially mound above the RLM unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Status Report (FY 2020): Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730). The estimates are compared with requirements of DOE O 435.1 Chg 1 and performance objectives defined in companion documents DOE M 435.1-1 Chg 1and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 Chg 1 is expected. A new PA study was initiated in fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 East and 200 West Areas (Trench 94 in 200 East; Trenches 31 and 34 in 200 West) due to extended time elapsing between the current annual status report and the original PA for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021. Within the active burial grounds in the 200 East Area, low-level waste and mixed low-level waste will continue to be disposed of in the dedicated U.S. Navy reactor compartment trench at the 218-E-12B Burial Ground (Trench 94). During this reporting period (FY 2020, from October 1, 2019, through September 30, 2020), two reactor compartments were disposed in Trench 94. Results from sorption experiments are summarized for this reporting period to quantify the efficacy of concrete waste forms in retaining key radionuclides (e.g., technetium-99 and iodine-129). The test durations ranged from 1 to 3 months. Continued groundwater monitoring of the 200 East Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis1 assumptions of a post-closure facility that will not be degraded by human activity. The LLBGs are located in an area identified for waste management and containment of residual contamination. This area will remain after final environmental remediation and the proposed shrinkage of Hanford Site boundaries to small sections within the 200 East and 200 West Areas in the Central Plateau (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-707) estimates that the 200 East LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1 Chg 1. Overall, there are no substantive changes to primary PA assumptions nor the PA analysis conclusion; therefore, compliance with DOE O 435.1 Chg 1 and the Disposal Authorization Statement is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. Within the active burial grounds, low-level and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this (fiscal year 2022) reporting period (October 1, 2021, through September 30, 2022), waste was disposed to the 200 West Area LLBGs. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis assumptions of a postclosure facility that will not be degraded by human activity. The LLBGs are in an area identified for waste management and containment of residual contamination (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-70) estimates that the 200 West LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the Disposal Authorization Statement is maintained. A new PA to evaluate the long-term impacts of three disposal trenches that are currently active within the 200 East and 200 West Areas (Trench 94 in the 200 East Area and Trenches 31 and 34 in the 200 West Area) was initiated in fiscal year 2019 and completed in fiscal year 2022. Corrective actions addressing 3 key issues and 31 secondary issues identified during the review process were developed and submitted to the Low-Level Waste Disposal Facility Federal Review Group Co-Chairs for review and approval. This PA provides additional technical basis for the continued adequacy of the existing Operating Disposal Authorization Statement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Y-12 Groundwater Protection Program Data Management Plan

This Data Management Plan (DMP) describes the processes in place to ensure the integrity of groundwater monitoring information collected by the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Y-12 National Security Complex (Y-12), Groundwater Protection Program (GWPP). This information includes program plans, reports, and computer systems used to capture monitoring station information and analytical data. The primary computer system used by the GWPP is the Groundwater Information Management System (GIMS). Procedures used to ensure the integrity of the data are included in this document by reference.

54 ENVIRONMENTAL SCIENCES↗

2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

Launch Complex 39A, SWMU 008 and Launch Complex 39B, SWMU 009 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents the findings, observations, and results for Air Sparging (AS) operations and sitewide groundwater monitoring for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, and Launch Complex 39B (LC39B), SWMU 009, at Kennedy Space Center (KSC), Florida. Results from direct push technology (DPT) sampling at LC39B are also included in this report. The reporting period for AS operations covered under this PMR is from January 1, 2022, to December 31, 2022.

groundwater↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗