Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ground heat pump”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Geothermal Heat Pump Case Study: Greensburg, Kansas, City Hall

Geothermal heat pumps can be great alternatives to air conditioners and furnaces, and require less electricity to run. This case study focuses on Greensburg, Kansas, City Hall and is part of a series: https://www.energy.gov/eere/geothermal/geothermal-heat-pump-case-studies.

case study↗

Geothermal Heat Pump Case Study: Marine Corps Logistics Base-Albany

Geothermal heat pumps can be great alternatives to air conditioners and furnaces, and require less electricity to run. This case study focuses on Marine Corps Logistics Base-Albany and is part of a series: https://www.energy.gov/eere/geothermal/geothermal-heat-pump-case-studies.

case study↗

Scoping Study of Integrated Geothermal CO 2 Heat Pump and Water Well System in Cold Climate Region (CRADA Final Report)

This study evaluates the feasibility of using ground-source heat pumps (GSHPs) integrated with water wells for residential heating demands in cold regions of the United States. Four different heat pump systems were evaluated and compared: a CO 2 air-source heat pump (ASHP), a R-410A ASHP, a CO 2 GSHP integrated with well water, and a R-410A GSHP integrated with well water. Simulations were conducted at both equipment and building integration levels, followed by a nationwide analysis across 10 selected cities. Results indicate that integrating GSHP technology with existing water wells (e.g., artesian, bedrock, drilled, and collector wells) is a feasible heating solution because of their high flow rates, good water quality, stable temperatures, and low environmental impact. Although R-410A systems demonstrate higher efficiency, CO 2 systems are more suitable for heating from contamination-free and energy security perspective. The CO 2 GSHPs maintain better performance in colder climates compared with that of ASHPs, providing higher coefficient of performance and environmental benefits because CO 2 refrigerant leakage would not contaminate well water. A national analysis confirms that CO 2 GSHPs outperform furnaces, especially in cold climates, making them a promising solution for residential heating.

15 GEOTHERMAL ENERGY↗

Combined Thermal-Water Microgrid Model

SAND2022-3874 O The Combined Thermal-Water Microgrid Model is a set of three models combined with controls algorithms for a Water Thermal Storage (WTS), Ground Source Heat Pump (GSHP), and Thermal Bridge Loop (TBL) that serves a residential neighborhood. The model allows a parametric investigation of volume of water storage versus number of ground heat exchanger bore-holes versus seasonal energy efficiency measures. The code is being released as open source so that the entire study can be replicated per an open access journal publication. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Villa, Daniel↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗

Sensitivity analysis of design parameters in RowWise borehole layout for ground heat exchangers

Ground source heat pump systems offer a promising pathway toward energy-efficient building heating and cooling. The performance and cost-effectiveness of these systems heavily depend on the design of the ground heat exchanger (GHE), particularly the spatial placement of boreholes used in large commercial buildings. Among various borefield layout strategies, the RowWise approach generates and optimizes borehole configurations within irregular polygonal land boundaries, providing land-use efficiency and installation flexibility. While multiple geometric design parameters constrain the RowWise layout, their influence on the system thermal performance and total drilling requirements remains unclear. Thus, this study presents a sensitivity analysis of key design parameters influencing the RowWise layout of vertical borehole GHEs, including the perimeter spacing ratio, borehole spacing, borehole field rotation angle, and borehole length. GHEDesigner and Ray Tune are employed to generate and assess different RowWise configurations. A series of parametric simulations was conducted to quantify the impact of each parameter on geometric distribution, economic cost, and computational speed. The results provide critical insights into the sensitivity and relative importance of different design parameters of RowWise method, offering practical guidance for designers aiming to optimize GHE layouts by balancing thermal efficiency, land constraints, and economic feasibility.

Xu, Dikai [Purdue University]↗

Experimental Evaluation of Thermal Storage Performance of a Dual-Purpose Underground Thermal Battery

A geothermal heat pump (GHP) system is an energy-efficient building heating and cooling technology with great potential for reducing energy consumption and decarbonization. However, applications of GHP are still limited due to the high cost, of which 30% is related to the cost of installing the conventional vertical bore ground heat exchangers, which are usually installed in boreholes 60 meters deep. A dual-purpose underground thermal battery (DPUTB) has been developed to offer a low-cost ground heat exchanger with a built-in thermal storage capacity. The DPUTB innovatively integrates a shallow-bore ground heat exchanger (the outer tank), which can be installed in a borehole less than 6 m deep, with thermal energy storage (TES) (the inner tank). DPUTB has the potential to reduce the cost of a ground source heat pump system while allowing shifting the electric demand of the building served by the GHP system from peak to off-peak hours of the electric grid by charging and discharging the thermal storage. A lab-scale (1:125 in volume) DPUTB prototype was built. Phase change material (PCM) was added to increase the thermal storage capacity and maintain the supply water temperature from the TES within the desired range for direct cooling operation during the discharge period. As PCMs are critical to the TES performance of the DPUTB, this study compared the influence of different PCMs (including salt hydrate and organic PCMs) on the discharge performance of the DPUTB. The thermal State of Charge (SoC) of the DPUTB was used to compare the performance resulting from using different PCMs. Test results indicate that the organic PCM (Methyl Laurate) outperforms salt-hydrate PCMs due to a lower melting temperature and a narrower melting temperature range during the phase change process. The results of this study provide a guide for PCM selection and the optimal design of DPUTB.

Wang, Lingshi↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗

Application of thermal energy storage with electrified heating and cooling in a cold climate

Ground source heat pumps (GSHPs) have been shown to be an effective means of decarbonizing building heating and cooling, but the operation of these systems at scale presents challenges to sites and the grid due to increases in peak demand. Here, in this study, we investigate how the use of Thermal Energy Storage (TES), in the form of stratified water storage, could reduce the peak daily demand associated with GSHP systems and thus improve their cost effectiveness. This system was compared to a Combined Heat and Power (CHP) plant, to investigate the potential cost and emissions impacts of electrification on large energy users transitioning from high efficiency fossil fuel equipment. This study builds on previous research by using a significant campus area, and investigating the various impacts of an electrified system versus a state of the art fossil fuel system. An established method of TRNSYS modeling is used for the heat pumps and borehole heat exchangers (BHEs), along with the TES. The GSHP system with TES is modeled to follow industry standards and sized to provide an optimal balance of capital and operating costs. Costs were investigated for a unique large energy user rate structure, as well as for a more common generalized rate structure. The results show that the addition of TES to the GSHP system could reduce operating costs by 4.5%, but still incurs a 5.64% cost increase from the baseline CHP system. It is also shown, however, that a tactical integration of heat pumps into the CHP system is the most cost effective solution, only increasing the operating costs by 4.71%. Likewise, the impacts of different rate structures are highlighted, with the TES only resulting in 0.75% cost savings under the generalized utility rate. Furthermore, it is shown that thermal storage has great potential for demand reduction, with the addition of storage incurring a decrease of 7–22% in annual peak demand kW, dependent on the rate structure.

25 ENERGY STORAGE↗

A dynamic 2D Borehole Thermal Energy Storage (BTES) model for enhanced computational efficiency

Progressing toward a future increasingly reliant on renewable energy sources, the development of effective, durable energy storage solutions becomes essential to balance supply and demand fluctuations. Borehole Thermal Energy Storage (BTES) is a long-duration thermal energy storage technology that captures excess heat generated from renewable energy sources and stores it underground for later use, enabling the efficient utilization of sustainable energy. This approach is particularly valuable in district energy networks when integrated with Ground Source Heat Pumps (GSHP) to provide stable heating and cooling. However, traditional three-dimensional (3D) numerical models of BTES systems demand extensive computational resources, limiting their practicality for real-time and large-scale applications. This study introduces a novel two-dimensional (2D) modeling approach that reduces computational costs while maintaining high accuracy. By employing a radial ring-based discretization method, the model simulates heat injection, retention, and retrieval dynamics over seasonal cycles. A new thermal-mass weighted-average temperature parameter is introduced to evaluate the performance of BTES systems. Model validation against FEFLOW simulations demonstrates a 17-fold improvement in computational speed compared to traditional Computational Fluid Dynamics (CFD) models while achieving a mean absolute percentage error (MAPE) of 2 % during charging and 4 % during discharging. Additionally, a trade-off analysis between computational efficiency and accuracy is conducted, ensuring the model's applicability for real-world scenarios. The findings of this research contribute to the development of computationally efficient BTES models, facilitating better optimization, control, and integration into renewable energy systems. This work provides a foundation for further studies in techno-economic analysis, multi-year performance evaluation, and real-time operational strategies for BTES applications, supporting a more sustainable energy future.

2D modeling↗

Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration

Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GHEDesigner [SWR-23-33]

GHEDesigner is a Python package for designing ground heat exchangers (GHE) used with ground source heat pump (GSHP) systems.

Mitchell, Matt↗

Multicriteria screening evaluation of geothermal resources on mine lands for direct use heating

Abstract Direct use of geothermal energy is the oldest and most versatile form of utilizing geothermal energy. In the last decade, this utilization has significantly increased, especially with the installation of geothermal (ground-source) heat pumps. Many current and inactive mine land sites across the U.S. could be redeveloped with clean energy technologies such as direct use geothermal, which would revitalize former mining communities, help with reducing greenhouse gas emissions, and accelerate the transition to a clean energy economy. We present a multicriteria screening framework to evaluate various aspects of direct-use geothermal projects on mine lands. The criteria are divided into three categories: (1) technical potential, (2) demand and benefits, and (3) regulatory and permitting. We demonstrate the framework using publicly available data on a national scale (continental U.S.). Then, using an example of abandoned coal mines in Illinois and focusing on resource potential, we illustrate how this evaluation can be applied at the state or more local scales when a region’s characteristics drive spatial variability estimates. The strength of this approach is the ability to combine seemingly disparate parameters and inputs from numerous sources. The framework is very flexible—additional criteria can be easily incorporated and weights modified if input data support them. Vice versa, the framework can also help identify additional data needed for evaluating those criteria. The multicriteria screening evaluation methodology provides a framework for identifying potential candidates for detailed site evaluation and characterization.

15 GEOTHERMAL ENERGY↗

G-Function Library for Modeling Vertical Bore Ground Heat Exchanger

This library contains g-functions (thermal response functions) for standard, regularly spaced vertical borehole ground heat exchangers. In total, it contains 34, 321 configurations. To permit interpolation, each configuration has g-functions for heights of 24, 48, 96, 192, and 384 m. All the g-functions were calculated with burial depths of 2m, and borehole diameters of 15 to 17.5 cm, depending on height. In configurations with uniform spacing, the spacing between the boreholes is set to 5m, though it can be scaled to other horizontal spacings.

15 GEOTHERMAL ENERGY↗

Assessing Low-Temperature Geothermal Play Types: Relevant Data and Play Fairway Analysis Methods

The U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) is supporting the Geothermal Heating and Cooling Geospatial Datasets and Analysis project conducted by the National Renewable Energy Laboratory (NREL) as part of a broader effort to demonstrate the multi-faceted value of integrating geothermal power and geothermal heating and cooling (GHC) technologies into national decarbonization plans and community energy plans. Currently, there is a need to establish baseline low-temperature geothermal resource datasets and evaluate methods for deploying these technologies to provide the basis for supporting private sector investment. This project is focused on collecting baseline datasets, updating conceptual models, and creating Play Fairway Analysis (PFA) workflows for low-temperature (<150 degrees Celsius) geothermal resources of different geothermal play types (i.e., sedimentary basin, orogenic belts, and radiogenic geothermal play types) that could be used for geothermal heating and cooling (GHC), combined heat and power (CHP), and other geothermal direct uses (GDU) applications. Low-temperature geothermal resources are defined as reservoirs - natural or engineered - with temperatures <150 degrees Celsius. While the focus in the NREL effort is on GHC, resources at the upper end of this temperature range can also be used for small-scale power generation. This project does not include Ground Source Heat Pumps (GSHPs) technologies because they can be effectively developed almost anywhere. Low-temperature geothermal resources have not been studied as extensively as higher- to medium-temperature geothermal resources, but there is recent interest in improving understanding of these types of resources with an uptick of interest in geothermal technologies for decarbonizing heating and cooling systems. In addition, Enhanced Geothermal Systems (EGS) and other emerging technologies for exploiting petrothermal resources have opened the possibility of utilizing deep sedimentary basin systems, where porous media provide permeability and high temperatures can be reached at great depths. This project takes the approach of classifying low- temperature geothermal resources by geothermal play type (GPT). We defined and characterized three major classes of low-temperature GPT: sedimentary basins, orogenic systems, and radiogenic systems. We develop methodologies for evaluating and analyzing the potential for these resources building off the PFA approach to de-risking geothermal exploration and characterization. The proposed PFA approach for low-temperature geothermal resources includes: 1) identifying relevant data (e.g., datasets such bottom-hole temperatures from oil and gas wells, heat flow data, Quaternary faults and stress field data, geophysical data, etc.); 2) grouping and weighting of relevant datasets into PFA criteria (e.g., geological, risk, and economic criteria); 3) uncertainty quantification; 4) developing favorability or common risk maps for low-temperature geothermal resources to identify potential locations for more focused data collection; and 5) estimating electric power generation and heating potential at those locations using the GeoRePORT Resource Size Assessment Tool (RSAT). This project should facilitate future deployment of GHC, CHP, and GDU by providing data, tools, and a workflow applicable to low-temperature geothermal resources. Increased deployment of GHC and GDU will help achieve national and local decarbonization goals.

15 GEOTHERMAL ENERGY↗

Zero-Emissions Roadmap for Oakland County

This document outlines a strategic pathway for Oakland County, Michigan to achieve zero emissions by 2050 under the Clean Energy to Communities (C2C) Program. The report encompasses analyses and high-level modeling to guide Oakland County in its emission reduction goals. Key methods include establishing an emissions inventory baseline with ongoing evaluation of future projects’ emissions impacts. Core elements include decommissioning old infrastructure, enhancing energy efficiency, deploying hybrid and ground-source heat pumps, and transitioning to electric fleets. It is proposed to structure the planning process into 5-year strategic plans to make the decarbonization process manageable. The document also emphasizes the need for reassessment of goals and periodic updates to remain adaptive to technological advancements and funding considerations. A matrixed approach for evaluating projects by cost and emissions savings is suggested to optimize decision-making given finite resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Klickitat Valley Health Central Utility Plant Modernization

This project replaced legacy heating and cooling equipment at Klickitat Valley Health (KVH), a rural hospital in Goldendale, Washington. Work included constructing a new chiller building, installing modern hydronic piping systems, replacing the main Emergency Department air handler (Air Handlining Unit (AHU-1)), upgrading electrical systems, and converting the Emergency Department wing from electric reheat to hydronic heating and cooling. Commissioning, testing, adjusting, and balancing were completed under this grant. These upgrades improve energy efficiency, operational resilience, and system reliability while preparing the campus for future electrification and renewable energy integration. They also support growth in healthcare services for a rural population. The project directly reduces energy costs and provides a foundation for future decarbonization measures, including a FEMA-funded microgrid and a large-scale ground source heat pump (GSHP) project. These follow-on initiatives would not have been possible without the hydronic backbone built through this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental Study on Charging and Discharging Performance of a Dual-Purpose Underground Thermal Battery

A dual-purpose underground thermal battery (DPUTB) was proposed for Grid-interactive Efficient Buildings. It integrates underground thermal energy storage with a shallow-buried ground heat exchanger (less than 6 m deep). The charging and discharging performance of a lab-scale DPUTB were experimentally investigated. The test results show that the lab-scale (1:125 in volume) DPUTB can provide 34 W cooling continuously for 3.7 h with a supply water temperature below 14°C. The water temperature rise of the inner tank was slowed down during the discharging process due to the phase change of the phase change material (PCM). Thermal storage capacity was increased by 156% using the PCM that only occupied 19% volume of the inner tank. The heat lost from the inner tank was recovered in the outer tank and led to the efficiency improvement of a ground source heat pump.

Wang, Lingshi↗