Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber-Security Considerations for the Smart Grid

The electrical power grid is evolving into the “smart grid”. The goal of the smart grid is to improve efficiency and availability of power by adding more monitoring and control capabilities. These new technologies and mechanisms are certain to introduce vulnerabilities into the power grid. In this paper we provide an overview of the cyber security state of the electrical power grid. We highlight some of the vulnerabilities that already exist in the power grid including limited capacity systems, implicit trust and the lack of authentication. We also address challenges of complexity, scale, added capabilities and the move to multipurpose hardware and software as the power grid is upgraded. These changes create vulnerabilities that did not exist before and bring increased risks. We conclude the paper by showing that there are a number mitigation strategies that can help keep the risk at an acceptable level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recent evolution of the offline computing model of the NOvA experiment

The NOvA experiment at Fermilab is a long-baseline neutrino experiment designed to study ν e appearance in a ν μ beam. Over the last few years there has been intense work to streamline the computing infrastructure in preparation for data, which started to flow in from the far detector in Fall 2013. Major accomplishments for this effort include migration to the use of off-site resources through the use of the Open Science Grid and upgrading the file-handling framework from simple disk storage to a tiered system using a comprehensive data management and delivery system to find and access files on either disk or tape storage. NOvA has already produced more than 6.5 million files and more than 1 PB of raw data and Monte Carlo simulation files which are managed under this model. In addition, the current system has demonstrated sustained rates of up to 1 TB/hour of file transfer by the data handling system. NOvA pioneered the use of new tools and this paved the way for their use by other Intensity Frontier experiments at Fermilab. Most importantly, the new framework places the experiment's infrastructure on a firm foundation, and is ready to produce the files needed for first physics.

97 MATHEMATICS AND COMPUTING↗

Introduction to the Special Section on Control and Management of Electric Power Systems With High Shares of Inverter-Based Resources

The growing interest in the integration of variable renewable energy (VRE) and distributed energy resources (DER) on both policy and economic grounds is driving the transformation of electric power systems. The significant deployment of VRE and DER can effectively displace the conventional synchronous generator-based power plants that for decades have been the foundation for power system generation and stability in electric power systems. Inverter-based resources (IBRs) introduce a high-level of uncertainty, variability, and complexity into the operation of electric power networks, and the transformation to IBRs raises a wide range of technical questions and operational challenges. The optimal coordination and control of these resources requires greater interoperability and necessitates significant upgrades of grid automation, including real-time monitoring.

distributed power generation↗

Typical Use Cases for Energy Storage in Rural Areas

Public power utilities and cooperatives play a crucial role in delivering reliable and affordable electricity to remote and sparsely populated regions. Unlike their urban counterparts, these utilities often face a unique set of challenges that can complicate their operations and service delivery. One of the primary challenges is the vast geographical area they must cover, which often results in higher transmission and distribution costs per customer. Additionally, public power utilities in rural areas often cannot afford the investments required to maintain and upgrade aging grid infrastructure to provide reliable and resilient power or withstand the impacts of recurring, severe weather events, which can cause extended outages and disrupt service delivery. Energy storage has emerged as a promising tool to help public power utilities meet these challenges. By enabling the storage of excess energy during low demand periods and providing a source of backup electricity during outages, energy storage systems can help utilities balance supply and demand more effectively. Additionally, they can help integrate a portfolio of various energy sources, reduce the need for expensive peak power purchases and provide ancillary services that stabilize the grid. This white paper describes potential use cases for energy storage in rural areas as well as documents a set of relevant example projects by project types.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Green Prison: The Santa Rita Jail Campus Microgrid

A large microgrid project is nearing completion at Alameda County’s twenty-two-year-old 45 ha 4,000-inmate Santa Rita Jail, about 70 km east of San Francisco. Often described as a green prison, it has a considerable installed base of distributed energy resources (DER) including an eight-year old 1.2 MW PV array, a five-year old 1 MW fuel cell with heat recovery, and considerable efficiency investments. A current US$14 M expansion adds a 2 MW-4 MWh Li-ion battery, a static disconnect switch, and various controls upgrades. During grid blackouts, or when conditions favor it, the Jail can now disconnect from the grid and operate as an island, using the on-site resources described together with its back-up diesel generators. In other words, the Santa Rita Jail is a true microgrid, or μgrid, because it fills both requirements, i.e. it is a locally controlled system, and it can operate both grid connected and islanded. The battery’s electronics includes Consortium for Electric Reliability Technology (CERTS) Microgrid technology. This enables the battery to maintain energy balance using droops without need for a fast control system.

25 ENERGY STORAGE↗

Advancing a New Era of Energy Delivery in the West (Fact Sheet)

This 2-page fact sheet provides a high-level overview of the Western Area Power Administration's Transmission Infrastructure Program, including background, purpose, goals, eligibility criteria, and current projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Wind Deployment: Dairy Farm

This is case study on distributed wind. Located on the plains in rural Colorado, this family farm uses a distributed wind system to offset electricity used by energy-intensive dairy farming. Their site is ideal for distributed wind development because there are minimal obstacles to block the prevailing winds coming from the west. (Buildings shown are to the east and south, not the dominant wind direction.) The turbines were interconnected on long distribution lines and grid infrastructure upgrades were completed as part of the project.

distributed↗

An Analysis of Security and Privacy Issues in Smart Grid Software Architectures on Clouds

Power utilities globally are increasingly upgrading to Smart Grids that use bi-directional communication with the consumer to enable an information-driven approach to distributed energy management. Clouds offer features well suited for Smart Grid software platforms and applications, such as elastic resources and shared services. However, the security and privacy concerns inherent in an information rich Smart Grid environment are further exacerbated by their deployment on Clouds. Here, we present an analysis of security and privacy issues in a Smart Grids software architecture operating on different Cloud environments, in the form of a taxonomy. We use the Los Angeles Smart Grid Project that is underway in the largest U.S. municipal utility to drive this analysis that will benefit both Cloud practitioners targeting Smart Grid applications, and Cloud researchers investigating security and privacy.

Simmhan, Yogesh↗

Applied Mathematics Challenge: Simulation of Power Electronics in Future Power Grid

There has been a buzz around increased grid modernization for more than a decade. Grid modernization includes, but is not limited to, upgrades to the grid to enhance reliability, resilience, security, and access to clean energy sources. One significant change that has been happening in this context is the increased penetration of computing power and controlled devices like power electronics in the power grid. As this change happens, the operation and characteristics of the power grid are set to undergo a significant change. The power grid moves from an older electric machine dominated grid that used analog electronics for controls to a power electronics dominated grid that uses digital computing for controls. As this transition happens, there are significant problems of applied mathematics that will need to be resolved in power electronics and power grid. The problems include the ability to simulate in different timescales, while also leveraging the significantly improved computing capabilities available today. In this paper, the challenges related to simulation of power electronics are discussed and the challenge problems laid down that applied mathematics may help resolve in future.

Debnath, Suman↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Scientific/Technical Report Solar America Initiative: Solar Outreach and Communications

The purpose of the Solar America Initiative: Solar Outreach and Communications grant was to promote better communications among stakeholders; address infrastructure barriers to solar energy; and coordinate with industry, the U.S. Department of Energy, national laboratories, states, cities and counties. The Interstate Renewable Energy Council (IREC), a non-profit organization formed in 1982, approached this grant project by establishing a wide range of communication and outreach activities including newsletters, workshops, webinars, model practices and publications; by advancing easy and fair hook-up rules to the utility grid; and by upgrading training based on industry competency standards. The Connecting to the Grid project and the Solar Codes and Standards Public Hearings project offered communication coupled with technical assistance to overcome interconnection, net metering and other regulatory and program barriers. The Workforce Development Project tackled building a strong workforce through quality training and competency assessment programs. IREC's web site, the semi-monthly state and stakeholder newsletter and the metrics report resulted in better communications among stakeholders. Workshops and phone seminars offered technical assistance and kept stakeholders up-to-date on key issues. All of these activities resulted in implementing sustainable solutions to institutional and market barriers to solar energy and getting the right information to the right people.

14 SOLAR ENERGY↗

Advancing Grid Resilience through Smart Charge Management: Findings from Maryland’s Pilot

This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level. Using charging data from over 4,600 EV drivers, the study analyzed SCM’s impact on the distribution systems of BGE and Pepco, which consists of over 2000 feeders. Unlike prior research that focused on system-wide trends or synthetic feeders, this analysis offers granular, feeder-level insights based on real-world operational data. It highlights how transformer density, load profiles, and infrastructure constraints influence smart charging performance. Results show feeder-level conditions play a crucial role in SCM effectiveness, with most feeders benefiting more from LB, while TOU-based SCM may be sufficient for others. By 2035, LB reduced peak charging loads by 27% on average, compared to 23% under TOU-based SCM, though some feeders saw reductions exceeding 35%, while others experienced minimal impact. Feeders with higher transformer utilization and limited capacity benefited more from LB, which more effectively distributed charging demand during off-peak hours. Beyond reducing grid constraints, SCM offers long-term operational and financial benefits. By shifting EV charging demand strategically, utilities can optimize asset utilization, delay infrastructure investments, and enhance grid performance. In terms of infrastructure upgrade deferrals, at the feeder level, LB consistently reduced peak charging loads and resulting infrastructure upgrade costs, particularly in high EV enrollment areas, decreasing the number of overloaded transformers by up to 35%, while TOU-based SCM achieved 20-30% reductions depending on feeder characteristics. At the system level, LB has the potential to defer total upgrade costs by $\$$186 million for BGE, compared to $\$$159 million under TOU-based SCM. For Pepco, TOU-based SCM performed slightly better, deferring upgrade costs by $\$$30 million, compared to $\$$29 million under LB. Section 4.5 reviews some of the system differences between BGE and Pepco. However, as EV adoption scales, TOU-based SCM will introduce secondary peak charging loads, reinforcing the need for more advanced, adaptive SCM approaches to prevent new grid challenges. As EV adoption continues to grow, feeder-level managed charging strategies will be essential for mitigating grid stress, improving infrastructure efficiency, and maintaining energy affordability for consumers. This report provides critical insights for utilities, Public Utility Commissions (PUCs), and state agencies on the role of feeder-specific smart charging in infrastructure planning, policy development, and grid modernization. The findings underscore the importance of tailored, data-driven SCM solutions that align with local grid conditions, ensuring a resilient, cost-effective transition to increasing EV adoption while safeguarding distribution system performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advancing Grid Resilience through Smart Charge Management: Findings from Maryland’s Pilot

This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power-Hardware-in-the-Loop Experiments of a Microgrid with a Grid-Forming Battery Inverter

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power-Hardware-in-the-Loop Experiments of a Microgrid With a Grid-Forming Battery Inverter: Preprint

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗