Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “gmlc”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beyond Price-Taker: Multiscale Optimization of a Wind-Battery Integrated Energy System within the Wholesale Electricity Market

This work presents the optimization of a wind-battery IES using the multiscale optimization framework proposed in our previous work to quantify errors from the price-taker assumption. The framework, built over Prescient (an open-source package for solving production cost models), is applied to the RTS-GMLC dataset, an open-source dataset that is representative of the southwest U.S. wholesale electricity market. The framework provides detailed bidding, market clearing, and control processes of an IES, and it can quantify how the IES interacts with the market. In this work, we use the retrofit of a wind farm with a battery storage system as an example to show the difference in the market outcomes and revenues obtained from both price-taker and multiscale optimization approaches. Our work goes beyond price-taker and deep dives into quantifying IES-market interaction in optimizing IES. This framework enables users to explore how different design and operation decisions of energy systems interact with the market and provides a more accurate evaluation than the price-taker assumption.

Chen, Xinhe↗

PSU ESI Review

A guide to developing an Energy Service Interface (ESI) was created as part of the Grid Modernization Laboratory Consortium 2.5.2 ESI project. The approach applies device-agnostic and service-oriented ESI principles and leverages documents such as the Interoperability Maturity Model and Common Grid Service Definitions to provide a methodology to review, develop, and update standards and profiles to engage distributed energy resources (DER) to provide grid services. This document evaluates the ESI developed by Portland State University’s Power Engineering Group under the Electric Grid of Things project funded by the U.S. Department of Energy. The evaluation explores the compliance of this specific implementation with the GMLC ESI principles to provide an example of an ESI profile and gap analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗

Custom Controls for Improved Demand Response from Heat Pump Water Heaters

As part of a Grid Modernization Laboratory Consortium (GMLC) project looking at defining grid services for a range of devices, NREL used a custom controller to investigate the ability of a HPWH to provide load add and load shed in hybrid and electric resistance mode using standard set point control. Based on those results, changes were made to the controls to increase the amount of grid services delivered, especially in the load-add case, and speed up the recovery from those events. The custom controls also include less common methods, such as duty cycling of the heat pump or elements. The improved controls led to an increase the amount of demand response that could be provided and enabled faster recovery. Results from the laboratory experiments will be presented, along with details about the custom controls that were implemented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch: Preprint

A significant difficultly associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DCOPF problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique on simulated dispatch operations of the RTS-GMLC over a week.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Estimating Energy Market Schedules Using Historical Price Data: Preprint

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets increases uncertainty and creates new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. This is orders of magnitude less data than required for a market clearing calculation with a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

Solving Unit Commitment Problems with Demand Responsive Loads: Preprint

This paper focuses on using variations of the Frank-Wolfe algorithm for solving unit commitment problems with high volumes of demand responsive loads on the power grid. We present a formulation of the unit commitment problem with demand responsive loads. We then show through reformulation and relaxations of the problem that variations of the Frank-Wolfe algorithm can be used to determine the time series decisions for the demand responsive loads. We show through computational experiments on the RTS-GMLC test system that the time series of demand responsive load decisions obtained through our approach are near optimal and provide details regarding how large scale parallel implementations of our approach can be highly computationally efficient.

demand response↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of renewable energy sources poses challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are more relevant to energy system planning as grids reach higher penetration levels of renewable energy. We present approaches for energy system planning based on scalable computational approaches which enable explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system.

electrical↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of power from renewable energy sources poses new challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are becoming more relevant to energy system planning as grids reach higher penetration levels of renewable energy. In this presentation we present approaches for energy system planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system augmented with large amounts of renewable generation.

MATHEMATICS AND COMPUTING↗

Flexpower and Hydro-Hybrids

This is a presentation, given at the SETO visit on 6/21. It summarizes the GMLC Flexpower results and project as well as the Hydro-Hybrids results and project.

13 HYDRO ENERGY↗

Optimizing Power Line Undergrounding Decisions under Varying Wildfire Risk and Weather Scenarios

Abstract—The threat of wildfire ignitions from electric power equipment has led utilities to increasingly turn to preemptive power shutoffs, which, while effective in reducing grid-induced wildfire risk, can cause significant load loss. Undergrounding power lines is an alternative strategy for preventing grid-induced wildfires. However, undergrounding lines is costly, so an efficient undergrounding plan must balance reductions in wildfire risk and load loss with the cost of undergrounding lines. We propose a robust optimization model to identify which power lines to underground to maximize load served while limiting wildfire risk across a range of wildfire risk and weather scenarios. Since solving this problem may be computationally heavy for large power grids and many operating scenarios, we present a delayed constraint generation algorithm to iteratively add scenarios until an optimal solution is found. We evaluate the performance of this framework on the RTS-GMLC with scenarios representing a year of operating conditions and compare it with a stochastic programming formulation. Our results indicate that our undergrounding model is successful in reducing load shed and risk compared to baseline cases in which no mitigation action is taken and only power shutoffs are implemented (no undergrounding). The robust formulation also reduces more load shed than the stochastic formulation in the most extreme scenarios. Index Terms—grid resilience, optimization, transmission systems, underground power lines, wildfire risk.

Taylor, S. [Department of Electrical and Computer ↗

Machine Learning for Fairness-Aware Load Shedding: A Real-Time Solution via Identifying Binding Constraints: Preprint

Timely and effective load shedding in power systems is critical for maintaining supply-demand balance and preventing cascading blackouts. To eliminate load shedding bias against specific regions in the system, optimization-based methods are uniquely positioned to help balance between economic and fairness considerations. However, the resulting optimization problem involves complex constraints, which can be time-consuming to solve and thus cannot meet the real-time requirements of load shedding. To tackle this challenge, in this paper we present an efficient machine learning algorithm to enable millisecond-level computation for the optimization-based load shedding problem. Numerical studies on both a 3-bus toy example and a realistic RTS-GMLC system have demonstrated the validity and efficiency of the proposed algorithm for delivering fairness-aware and real-time load shedding decisions.

97 MATHEMATICS AND COMPUTING↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch

A significant difficulty associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DC optimal power flow problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique by simulating dispatch operations on a synthetic test system over the course of a week.

94 GMLC - Grid Modernization Laboratory Consortium↗

Evaluation of Centralized Model Based FLISR in a Lab Setup

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

Evaluation of Centralized Model-Based FLISR in a Lab Setup: Preprint

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗