Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fixed and floating structures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

38 records · Page 3

OC6 Phase Ia Definition Document: Validation of Nonlinear Hydrodynamic Loading on the DeepCwind Semisubmersible

The objective of OC6 Phase I is to investigate the persistent under-prediction (about 20% on average) of the structural loads in the OC5-DeepCwind floating semisubmersible wind system, as observed within the previous OC5 Phase II project. The OC5 results indicate that much of this under-prediction originates from the low-frequency response of the system at the surge/pitch natural frequencies, resulting from nonlinear hydrodynamic loading and/or overprediction of hydrodynamic damping. This work package therefore focuses on better understanding this low-frequency response behavior, the applicability of computational-fluid-dynamics (CFD) models and engineering-level hydrodynamic models for predicting the nonlinear hydrodynamic loading, and the level of uncertainty in the measured response characteristics. To address these objectives, two experimental campaigns were developed and performed in 2017 and 2018 by a sub-group of the OC5 project: Floating test campaign: A simplified OC5-DeepCwind semisubmersible model (no turbine, rigid tower) was moored to three taut-spring lines and subjected to motion decay and wave tests (regular and irregular waves), during which motion amplitudes of the model were measured (see Figure 1a). The purpose of this test campaign was to examine the repeatability of the low-frequency response of the system to wave excitation and determine the level of uncertainty in the response behavior.Constrained test campaign: The same model, but without the tower present, was fixed to a carriage and subjected to towing, forced oscillation and wave tests (regular and irregular waves), during which forces exerted upon the model were measured (see Figure 1b). The purpose of this test campaign was to examine the hydrodynamic loading contributions by separating the wave excitation and radiation forces. Both model test campaigns were performed in the concept basin of the Maritime Research Institute Netherlands (MARIN) in Wageningen, the Netherlands and the first test was within the framework of the MARINET2 project. Both experimental campaigns were examined within Phase Ia of the OC6 project. The purpose of this report is to supply the needed information to participants of the OC6 project to build and simulate the experimental campaigns.

17 WIND ENERGY↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗