Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “field testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests and the full-scale test using high-sulfur coal were completed in 2005 and 2006 and have been previously reported. This topical report presents the results from the Task 5 full-scale additive tests, conducted at Southern Company's Plant Yates Unit 1. Both additives were tested there.

01 COAL, LIGNITE, AND PEAT↗

Field Testing Research at the NWTC (Fact Sheet)

The National Wind Technology Center (NWTC) at the National Renewable Laboratory (NREL) has extensive field testing capabilities that have been used in collaboration with the wind industry to accelerate wind technology development and deployment for more than 30 years.

17 WIND ENERGY↗

Field Test to Evaluate Deep Borehole Disposal.

The U.S. Department of Energy (DOE) has embarked on the Deep Borehole Field Test (DBFT), which will investigate whether conditions suitable for disposal of radioactive waste can be found at a depth of up to 5 km in the earth’s crust. As planned, the DBFT will demonstrate drilling and construction of two boreholes, one for initial scientific characterization, and the other at a larger diameter such as could be appropriate for waste disposal (the DBFT will not involve radioactive waste). A wide range of geoscience activities is planned for the Characterization Borehole, and an engineering demonstration of test package emplacement and retrieval is planned for the larger Field Test Borehole. Characterization activities will focus on measurements and samples that are important for evaluating the long-term isolation capability of the Deep Borehole Disposal (DBD) concept. Engineering demonstration activities will focus on providing data to evaluate the concept’s operational safety and practicality. Procurement of a scientifically acceptable DBFT site and a site management contractor is now underway. The concept of deep borehole disposal (DBD) for radioactive wastes is not new. It was considered by the National Academy of Science (NAS 1957) for liquid waste, studied in the 1980’s in the U.S. (Woodward–Clyde 1983), and has been evaluated by European waste disposal R&D programs in the past few decades (for example, Grundfelt and Crawford 2014; Grundfelt 2010). Deep injection of wastewater including hazardous wastes is ongoing in the U.S. and regulated by the Environmental Protection Agency (EPA 2001). The DBFT is being conducted with a view to use the DBD concept for future disposal of smaller-quantity, DOE-managed wastes from nuclear weapons production (i.e., Cs/Sr capsules and granular solid wastes). However, the concept may also have broader applicability for nations that have a need to dispose of limited amounts of spent fuel from nuclear power reactors. For such nations the cost for disposing of volumetrically limited waste streams could be lower than mined geologic repositories.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deep Borehole Field Test Requirements and Controlled Assumptions.

This document presents design requirements and controlled assumptions intended for use in the engineering development and testing of: 1) prototype packages for radioactive waste disposal in deep boreholes; 2) a waste package surface handling system; and 3) a subsurface system for emplacing and retrieving packages in deep boreholes. Engineering development and testing is being performed as part of the Deep Borehole Field Test (DBFT; SNL 2014a). This document presents parallel sets of requirements for a waste disposal system and for the DBFT, showing the close relationship. In addition to design, it will also inform planning for drilling, construction, and scientific characterization activities for the DBFT. The information presented here follows typical preparations for engineering design. It includes functional and operating requirements for handling and emplacement/retrieval equipment, waste package design and emplacement requirements, borehole construction requirements, sealing requirements, and performance criteria. Assumptions are included where they could impact engineering design. Design solutions are avoided in the requirements discussion. Deep Borehole Field Test Requirements and Controlled Assumptions July 21, 2015 iv ACKNOWLEDGEMENTS This set of requirements and assumptions has benefited greatly from reviews by Gordon Appel, Geoff Freeze, Kris Kuhlman, Bob MacKinnon, Steve Pye, David Sassani, Dave Sevougian, and Jiann Su.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field testing of linear individual pitch control on the two-bladed controls advanced research turbine

This paper presents the results of field tests using linear individual pitch control (LIPC) on the two-bladed Controls Advanced Research Turbine 2 (CART2) at the National Renewable Energy Laboratory (NREL). LIPC has recently been introduced as an alternative to the conventional individual pitch control (IPC) strategy for two-bladed wind turbines. The main advantage of LIPC over conventional IPC is that it requires, at most, only two feedback loops to potentially reduce the periodic blade loads. In previous work, LIPC was designed to implement blade pitch angles at a fixed frequency (e.g., the once-per-revolution (1P) frequency), which made it only applicable in above-rated wind turbine operating conditions. In this study, LIPC is extended to below-rated operating conditions by gain scheduling the controller on the rotor speed. With this extension, LIPC and conventional IPC are successfully applied to the NREL CART2 wind turbine. Lastly, the field-test results obtained during the measurement campaign indicate that LIPC significantly reduces the wind turbine loads for both below-rated and above-rated operation.

17 WIND ENERGY↗

Field Testing Unvented Roofs with Asphalt Shingles in Cold and Hot-humid Climates

BSC TO5 Task 7.1 Field Testing Unvented Roofs with Asphalt Shingles in Cold Climates - Bolingbrook, IL 60440 BSC TO5 Task 7.1 Field Testing Unvented Roofs with Asphalt Shingles in Hot-Humid Climates - Friendswood, TX 77546 To understand the long-term moisture performance of unvented roof assemblies with fibrous insulation, the U.S. Department of Energy's Building America team Building Science Corporation built and monitored test roofs in two climates: a cold-climate test house in Bolingbrook, Illinois (Chicago area; zone 5A), and a hot-humid test house in Friendswood, Texas (Houston area, zone 2A). The Chicago-area test bed had seven parallel experimental rafter bays. The assemblies included a control vented compact (cathedral) roof, a dense-pack cellulose unvented roof, and an unvented roof with a "diffusion vent" (a strip of vapor-permeable gypsum sheathing at the ridge to allow drying). The interior finish was gypsum wallboard (GWB) with latex paint. The other four bays were top vent roof assemblies, which have a polypropylene breather mesh between the roof sheathing and the asphalt shingles to allow ventilation drying of the assembly from underneath the vapor-impermeable shingles. Two of the four "top vent" roofs were fiberglass batt and two were dense-pack cellulose roofs with either interior GWB or open to the interior. Wintertime moisture-related failure was accelerated by providing interior humidification (22.2 degree C [72 degree F]/50% relative humidity [RH]), which is known to be an extreme interior loading). Data were captured over 8 months, including a winter and the following spring and early summer.

Array↗

Field Testing of an Unvented Roof with Fibrous Insulation, Tiles, and Vapor Diffusion Venting

BSC TO5 Task 2.5 Field Testing of an Un-vented Roof with Fibrous Insulation and Tiles - Winter Park, FL 32789 Field test data available for wood moisture contents, temperature, and relative humidity. Un-vented roofs (aka cathedral-ized attics) are an established presence in Florida residential building markets. These roofs are built with a layer of spray polyurethane foam (SPF) on the underside of the roof deck. Such a roof configuration positions the heating, ventilating, and air-conditioning equipment and ductwork within the conditioned space and improves airtight-ness in practice (by shifting the air barrier from the ceiling to the roofline). However, SPF is more expensive than fibrous insulation. Some builders have also become wary of using SPF because of liability concerns about indoor air quality and off-gassing. Unfortunately, un-vented roofs that use only air-permeable fibrous insulation (cellulose or fiberglass) have been demonstrated to be at risk of moisture issues in climate zone 2A because condensation and moisture accumulation occur at the ridge. This report describes research about a test implementation of an un-vented tile roof assembly in a hot-humid climate (Orlando, Florida; climate zone 2A); the roof was insulated with air-permeable insulation (netted and blown fiberglass). Given the localized moisture accumulation and failures seen in previous work, the U.S. Department of Energy's Building America research team Building Science Corporation theorized that installation of diffusion vents might allow for the wintertime release of moisture to safe levels. Diffusion vents are open slots at the roof's highest points (the ridge and hips) that are covered with a water-resistant but vapor-open (500+ perm) air barrier membrane. The test home is a two-story slab-on-grade structure (3,600 ft2 ); the roof was insulated with a prototype insulation system (called boxed netting), which allows full depth insulation (i.e., it is not limited by the depth of the truss top chord). As a control comparison, one part of the roof was constructed as a typical un-vented roof (with a self-adhered membrane at the ridge). Ideally, failure would occur in the control roof and the experimental (diffusion vent) roofs would show sufficient drying to avoid failure. No intentional space conditioning was provided in the un-vented attic so worst-case humidity buildup conditions could be observed.

air leakage↗

Deep Borehole Field Test Laboratory and Borehole Testing Strategy

Deep Borehole Disposal (DBD) of high-level radioactive wastes has been considered an option for geological isolation for many years (Hess et al. 1957). Recent advances in drilling technology have decreased costs and increased reliability for large-diameter (i.e., ≥50 cm [19.7”]) boreholes to depths of several kilometers (Beswick 2008; Beswick et al. 2014). These advances have therefore also increased the feasibility of the DBD concept (Brady et al. 2009; Cornwall 2015), and the current field test design will demonstrate the DBD concept and these advances. The US Department of Energy (DOE) Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (DOE 2013) specifically recommended developing a research and development plan for DBD. DOE sought input or expression of interest from States, local communities, individuals, private groups, academia, or any other stakeholders willing to host a Deep Borehole Field Test (DBFT). The DBFT includes drilling two boreholes nominally 200m [656’] apart to approximately 5 km [16,400’] total depth, in a region where crystalline basement is expected to begin at less than 2 km depth [6,560’]. The characterization borehole (CB) is the smaller-diameter borehole (i.e., 21.6 cm [8.5”] diameter at total depth), and will be drilled first. The geologic, hydrogeologic, geochemical, geomechanical and thermal testing will take place in the CB. The field test borehole (FTB) is the larger-diameter borehole (i.e., 43.2 cm [17”] diameter at total depth). Surface handling and borehole emplacement of test package will be demonstrated using the FTB to evaluate engineering feasibility and safety of disposal operations (SNL 2016).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FIELD TEST INSTRUCTION 100-NR-2 OPERABLE UNIT DESIGN OPTIMIZATION STUDY FOR SEQUESTRATION OF SR-90 SATURATED ZONE APATITE PERMEABLE REACTIVE BARRIER EXTENSION

The objective of this field test instruction is to provide technical guidance for aqueous injection emplacement of an extension apatite permeable reactive barrier (PRE) for the sequestration of strontium-90 (Sr-90) using a high concentration amendment formulation. These field activities will be conducted according to the guidelines established in DOE/RL-2010-29, 100-NR-2 Design Optimization Study, hereafter referred to as the DOS. The DOS supports the Federal Facility Agreement Consent Order (EPA et al., 1989), Milestone M-16-06-01, and 'Complete Construction of a Permeable Reactive Barrier at 100-N.' Injections of apatite precursor chemicals will occur at an equal distance intervals on each end of the existing PRE to extend the PRB from the existing 91 m (300 ft) to at least 274 m (900 ft). Field testing at the 100-N Area Apatite Treatability Test Site, as depicted on Figure 1, shows that the barrier is categorized by two general hydrologic conceptual models based on overall well capacity and contrast between the Hanford and Ringold hydraulic conductivities. The upstream portion of the original barrier, shown on Figure 1, is characterized by relatively low overall well specific capacity. This is estimated from well development data and a lower contrast in hydraulic conductivity between the Hanford formation and Ringold Formations. Comparison of test results from these two locations indicate that permeability contrast between the Hanford formation and Ringold Formation is significantly less over the upstream one-third of the barrier. The estimated hydraulic conductivity for the Hanford formation and Ringold Formation over the upstream portion of the barrier based on observations during emplacement of the existing 91 m (300 ft) PRB is approximately 12 and 10 m/day (39 and 32 ft/day), respectively (PNNL-17429). However, these estimates should be used as a rough guideline only, as significant variability in hydraulic conductivity is likely to be observed in the barrier extension wells, particularly those in the Ringold formation. The downstream portion of the original barrier, shown on Figure 1, is characterized by generally higher well specific capacity and a larger hydraulic conductivity contrast between the Hanford formation and Ringold Formation. Hydraulic conductivity rates for the Hanford formation and Ringold Formation over the downstream portion of the barrier were estimated at 29 and 9 m/day (95 and 29 ft/day), respectively (with the Hanford formation hydraulic conductivity being greater in the downstream portion than the upstream portion). Once again, it should be noted that the actual conductivities may vary significantly, and the values state above should only be used as a rough initial estimates. Optimum apatite emplacement has been shown to occur when injections targeting the Hanford formation and the Ringold Formation are performed separately. The remainder of this test instruction provides details for conducting these formation-targeted injections.

58 GEOSCIENCES↗

Influence of tower shadow on downwind flexible rotors: Field tests and simulations

Abstract As wind turbine rotors become larger, the blades become more flexible, requiring extra stiffness and cost to avoid the risk of tower strike. Wind turbines in a downwind configuration have a reduced risk of tower strike because the rotor thrust acts away from the tower. However, downwind blades pass through the wake of the tower, and the resulting load variation may contribute to blade fatigue. To date, there have been no field tests to quantify this tower shadow effect on unsteady blade moments. The present study reports on the first field testing of a flexible, downwind, coned rotor and compares the experimental data against simulations run in OpenFAST. The tower shadow effect is simulated using the conventional Powles model and a new Eames model (developed herein), which includes the influence of upstream turbulence. Both models reasonably predict the blade root out‐of‐plane bending moment data and the tower shadow dip magnitude when compared to field test data in Region 3. Tower shadow was found to increase the short‐term Damage Equivalent Loads (DELs) by less than 10% compared to other effects (gravity, shear, and turbulence), and the predictions were consistent with experiments. These results indicate that the tower shadow effect can be reasonably modeled with the simpler Powles model and that the tower shadow effect can be small compared to the effect of turbulence. However, long‐term fatigue due to tower shadow should be included in detailed structural analysis and design of the rotor and the tower.

Simpson, Juliet G.↗

Initial Field Testing in the Deep Subsurface for the Thermal Breakout Project for Measuring In Situ Stress

The current state-of-the-art technology for in situ stress measurements involves an integrated approach that combines borehole breakout observations, drilling-induced tensile fractures, and hydraulic fracturing tests (i.e., mini-fracs); however, this methodology has several limitations that often prevent successful in situ stress measurements. One major limitation is that breakouts do not appear in every borehole and are generally a natural occurrence that cannot easily be controlled. Because borehole breakouts are used to measure the maximum horizontal in situ stress magnitude, the absence of borehole breakouts presents a major data gap for in situ stress measurements. As a response to this data gap a new thermal breakout technology is being developed that will provide a method for thermally inducing borehole breakouts and obtaining consistent measurements of the maximum horizontal stress magnitude. This thermal breakout technology involves heating the borehole and increasing the thermoelastic compressive stress in the rock until a breakout develops, which is directly correlated to the maximum horizontal stress magnitude. An initial component of the thermal breakout project involves developing a prototype downhole tool and performing field testing in the deep subsurface. The primary objective of the initial tool development and field testing is to provide a physical proof of concept for the thermal breakout technology. Three thermal breakout field tests were performed at approximately 4850 feet deep in the Sanford Underground Research Facility. Each test was performed in a borehole that had been previously used for overcoring stress measurements. The third and final test successfully created two diametrically opposed breakouts after deploying the thermal breakout tool for approximately 3 hours of continuous heating. Post-analysis of the thermally induced breakouts confirmed that the thermal breakout orientation directly corresponds to the known in situ stress orientation and magnitude.

Voegeli, Sam↗

Site Selection for Field Testing of a Marine Hydrokinetic Turbine Platform to Serve as a Floating Unmanned Mobile Recharging Station for Aerial Drones

Abstract Expanding applications of unmanned aerial vehicles (UAVs) in coastal areas suggests a need for stations along or close to the coast where the UAV batteries can be easily recharged. A small-scale low flow marine current turbine in support of a floating autonomous recharge station for small UAVs has been designed and assembled at Florida Atlantic University and is being prepared for field testing. Surveys of identified test sites in the Intracoastal Waterways and at open ocean locations are being conducted to determine their suitability in meeting resource, system design and permitting requirements. A sensor platform has been developed for measuring local currents at the identified sites in support of resource characterization. Two out of the eight sites surveyed in the Intracoastal Waterways are found to meet the field-testing requirements for current resource, water depth, and sea bottom conditions. Planned field testing will include parametric characterization studies of the performance of the current turbine for a range of turbine blade configurations, current speeds, turbine wheel submergence levels, and test site location (channeled flow vs open ocean flow).

McKinney, Adriana Lynell↗

Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station

The primary objective of the project was to evaluate the long-term feasibility of using activated carbon injection (ACI) options to effectively reduce mercury emissions from Texas electric generation plants in which a blend of lignite and subbituminous coal is fired. Field testing of ACI options was performed on one-quarter of Unit 2 at TXU's Big Brown Steam Electric Station. Unit 2 has a design output of 600 MW and burns a blend of 70% Texas Gulf Coast lignite and 30% subbituminous Powder River Basin coal. Big Brown employs a COHPAC configuration, i.e., high air-to-cloth baghouses following cold-side electrostatic precipitators (ESPs), for particulate control. When sorbent injection is added between the ESP and the baghouse, the combined technology is referred to as TOXECON{trademark} and is patented by the Electric Power Research Institute in the United States. Key benefits of the TOXECON configuration include better mass transfer characteristics of a fabric filter compared to an ESP for mercury capture and contamination of only a small percentage of the fly ash with AC. The field testing consisted of a baseline sampling period, a parametric screening of three sorbent injection options, and a month long test with a single mercury control technology. During the baseline sampling, native mercury removal was observed to be less than 10%. Parametric testing was conducted for three sorbent injection options: injection of standard AC alone; injection of an EERC sorbent enhancement additive, SEA4, with ACI; and injection of an EERC enhanced AC. Injection rates were determined for all of the options to achieve the minimum target of 55% mercury removal as well as for higher removals approaching 90%. Some of the higher injection rates were not sustainable because of increased differential pressure across the test baghouse module. After completion of the parametric testing, a month long test was conducted using the enhanced AC at a nominal rate of 1.5 lb/Macf. During the time that enhanced AC was injected, the average mercury removal for the month long test was approximately 74% across the test baghouse module. ACI was interrupted frequently during the month long test because the test baghouse module was bypassed frequently to relieve differential pressure. The high air-to-cloth ratio of operations at this unit results in significant differential pressure, and thus there was little operating margin before encountering differential pressure limits, especially at high loads. This limited the use of sorbent injection as the added material contributes to the overall differential pressure. This finding limits sustainable injection of AC without appropriate modifications to the plant or its operations. Handling and storage issues were observed for the TOXECON ash-AC mixture. Malfunctioning equipment led to baghouse dust hopper plugging, and storage of the stagnant material at flue gas temperatures resulted in self-heating and ignition of the AC in the ash. In the hoppers that worked properly, no such problems were reported. Economics of mercury control at Big Brown were estimated for as-tested scenarios and scenarios incorporating changes to allow sustainable operation. This project was funded under the U.S. Department of Energy National Energy Technology Laboratory project entitled 'Large-Scale Mercury Control Technology Field Testing Program--Phase II'.

01 COAL, LIGNITE, AND PEAT↗

Task Order 22 – Engineering and Technical Support, Deep Borehole Field Test. AREVA Summary Review Report

Under Task Order 22 of the industry Advisory and Assistance Services (A&AS) Contract to the Department of Energy (DOE) DE-NE0000291, AREVA has been tasked with providing assistance with engineering, analysis, cost estimating, and design support of a system for disposal of radioactive wastes in deep boreholes (without the use of radioactive waste). As part of this task order, AREVA was requested, through a letter of technical direction, to evaluate Sandia National Laboratory’s (SNL’s) waste package borehole emplacement system concept recommendation using input from DOE and SNL. This summary review report (SRR) documents this evaluation, with its focus on the primary input document titled: “Deep Borehole Field Test Specifications/M2FT-15SN0817091” Rev. 1 [1], hereafter referred to as the “M2 report.” The M2 report focuses on the conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test waste packages (WPs) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). This SRR follows the same outline as the M2 report, which allows for easy correlation between AREVA’s review comments, discussion, potential proposed alternatives, and path forward with information established in the M2 report. AREVA’s assessment focused on three primary elements of the M2 report: the conceptual design of the WPs proposed for deep borehole disposal (DBD), the mode of emplacement of the WP into DBD, and the conceptual design of the DBFT. AREVA concurs with the M2 report’s selection of the wireline emplacement mode specifically over the drill-string emplacement mode and generically over alternative emplacement modes. Table 5-1 of this SRR compares the pros and cons of each emplacement mode considered viable for DBD. The primary positive characteristics of the wireline emplacement mode include: (1) considered a mature technology; (2) operations are relatively simple; (3) probability of a radiological release due to off-normal events are relatively low; (4) costs are relatively low; and (5) maintenance activities are relatively simple. The primary drawback associated with the wireline emplacement mode for DBD is the number of emplacement trips-in to the borehole, which results in a relatively higher probability for a drop event. Fortunately, the WPs can be engineered with impact limiters that will minimize the likelihood of a breach of the WP due to a drop. The WP designs presented in the M2 report appear to be focused on compatibility with the drill-string emplacement mode (e.g., the threaded connections). With the recommendation that the wireline emplacement mode be utilized for the DBFT, some changes may be warranted to these WPs. For example, the development of a WP release connection that is more reliable than the currently credited connection, which is considered to have a high failure probability, and the integration of an impact limiter into its design. The M2 report states the engineering demonstration of the DBFT will occur in the FTB over a 4-year period. AREVA recommends development and testing of the WP emplacement handling equipment occur separately (but concurrently, if not earlier) from the FTB at a mock-up facility. The separation of this activity would prevent schedule interference between the science and engineering thrusts of the project. Performing tests in a mock-up facility would allow additional control and observation compared to the FTB. The mock-up facility could also be utilized as a training facility for future operations. Terminal velocity and impact limiter testing would require the FTB for testing, since these areas would be difficult to reproduce in a limited depth mock-up. Although only at the end of the conceptual stage of design development, DBD appears to be a viable solution for some waste forms produced by the nuclear industry. However, regulatory requirements have yet to be established for pre- and post-closure performance of DBD and should be established as soon as possible. Some of the main areas of focus from a regulatory perspective include: (1) establishing acceptable performance requirements for the long-term behavior of DBD; (2) determining acceptable borehole abandonment criteria; (3) establishing retrievability requirements; (4) developing a consensus on the factor of safety (FoS) for the emplacement mode and WP; and (5) establishing safety and safeguards performance requirements for DBD. Although conservative requirements have been utilized to provide the foundation for the conceptual design of DBD, regulatory requirements and feedback are necessary to confirm recommendations made herein and to ensure the long-term performance of DBD is acceptable. The combination of the M2 report and this SRR is intended to facilitate the completion of the conceptual design for DBD for the Cs and Sr capsules and calcined waste forms. Using the conceptual design, preliminary design activities (the second stage of a three-stage process described in the M2 report) can proceed and the DBFT utilized to support, demonstrate, and confirm engineering elements of this design.

42 ENGINEERING↗

Finalize field testing of cold climate heat pump (CCHP) based on tandem vapor injection compressors

This report describes the system diagram and control algorithm of a prototype air-source cold climate heat pump (CCHP) using tandem vapor injection (VI) compressors. The prototype was installed in Fairbanks, Alaska and underwent field testing starting in 09/2016. The field testing results of the past six months, including compressor run time fractions, measured COPs and heating capacities, etc., are presented as a function of the ambient temperature. Two lessons learned are also reported.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration

Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cr Field Testing

This is a summary of CR Project Field Tests including: Borehole Dilution Tracer Tests (Point Estimates of Flow Velocity), Push-Pull Tracer Tests at R-42 and R-28 (Flow Velocity and Dual-Porosity), Long Term Pump Test Trends, Carbonate/Bicarbonate Injection in R-42 (Cr desorption?), Cross-Hole Tracer Test (CrPZ-2a, CrPZ-2b, R-28 Injections; CrEX-3 Pumping), and Long-Term Trends in Plume Periphery Monitoring Wells.

58 GEOSCIENCES↗