Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fast charging station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Economics of electric vehicle corridor fast charging in the United States

Corridor direct-current fast charging (DCFC) stations enable long-distance electric vehicle travel, yet their economics remain uncertain due to high capital costs, low initial utilization, and exposure to utility demand charges. This study evaluates the long-term economics of corridor DCFC across the United States, incorporating capital and operating expenses-including charging equipment and real-world utility tariffs-alongside modeled station utilization, financial incentives, and ancillary retail revenue. In the Baseline scenario, modeled breakeven costs for corridor DCFC average $\$$0.42/kWh over 20 years, yet fewer than half of stations reach cost parity with gasoline on a per-mile basis. Utilization is the primary driver of cost variation, with low-utilization stations costing roughly six times more per kilowatt-hour than the national average. Excluding stations that fail to reach cost parity reduces National Highway System coverage within 50 miles from 94% to 67%, underscoring the trade-off between market-driven deployment and comprehensive network coverage. These results provide guidance for charging providers, utilities, planners, and policymakers seeking to develop and sustain a financially viable national corridor charging network.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Home charging for all: Techno-economic and life cycle assessment of multi-unit dwelling electric vehicle charging hubs

Ubiquitous electric vehicle adoption can drastically reduce greenhouse gas emissions (GHG) but will require equitable home charging infrastructure for all residences. Unlike single-family homes, Multi-Unit Dwellings (MUD) currently lack market share and access to nearby charging infrastructure partly due to expensive capital costs for reluctant residential property-owners. Further, this work evaluates the levelized cost of charging (LCOC) for Battery Electric Vehicles (BEVs) at MUD community charging hubs through a techno-economic analysis (TEA) that leverages real-world charging data and costs. Three different MUD charging types are investigated for a baseline and optimistic case: 1.9-kW Level 1 (L1), 6.6-kW Level 2 (L2), and 50-kW Direct Current Fast Charging (DCFC) stations under three different ownership models: resident, utility, and private company. Results demonstrate L1 and L2 chargers to be less expensive than the gasoline equivalent across the United States. Further, utility and private company ownership models, which avoid initial costs for residential property owners, result in a large LCOC premium for L1 and moderate LCOC premium for L2 relative to the resident ownership model. In contrast, DCFC is shown to be expensive for baseline scenarios but economical for optimistic scenarios especially under private company ownership. This work also performs a cradle to grave (C2G) life cycle assessment (LCA) of an average passenger BEV and gasoline conventional vehicle (CV) using yearly (grid mix & vehicle parameters), hourly (grid mix), and state-level (grid mix) resolution. Results show BEVs to have lower GHG emissions (-86% to-10%) than gasoline CVs in the contiguous U.S. Next, the system boundary of the TEA is extended to the total cost of ownership (TCO) of BEVs. The TCO is then coupled with the C2G GHG emissions to calculate the cost of GHG emissions reduction. Ultimately, the cost of GHG emissions reduction from MUD BEVs relative to gasoline CVs is shown to be negative for every scenario except baseline DCFC, meaning MUD BEV charging infrastructure can be a cost-effective endeavor to reduce GHG emissions.

33 ADVANCED PROPULSION SYSTEMS↗

HIVE™ [SWR-19-36]

The HIVE™ platform is a mobility services simulation platform developed to provide insight on the energy, infrastructure, service, and economic outcomes of various mobility as a service (MaaS) options. The HIVE platform takes a set of spatiotemporal travel origin-destination pairs and simulates the operation of a predefined mobility service fleet, incorporating request pooling, and various operational and charging behaviors. Hive specializes at modeling fleets of automated electric vehicles (AEVs) and can be used to site and size direct current fast charge (DCFC) stations and measure grid impacts of large-scale AEV fleets serving real-world MaaS trip demand (similar to taxis, Uber, Lyft, etc.). Potential outcomes from a Hive simulation include level of service, total vehicle miles traveled (VMT), deadheading (zero passenger) miles, simultaneous and total energy loads, average occupancy, and more. Hive is developed to generalize to new regions and can be customized to handle many scenarios and operating conditions.

Rames, Clement↗

National Electric Vehicle Infrastructure Formula Program Annual Report: Plan Year 2022-2023

The National Electric Vehicle Infrastructure (NEVI) Formula Program provides nearly $5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of fast EV charging stations along designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with emphasis along the Interstate Highway System. The first-year deployment plans were submitted to and reviewed by the Joint Office and FHWA and certified by FHWA in September 2022. To support the rollout of the NEVI Formula Program, the Joint Office has been providing technical assistance to the states since February 2022 and has developed DriveElectric.gov to serve as the front door for federal efforts to build out a national charging network. This report summarizes the key activities of the Joint Office in relation to the NEVI program and provides an individual and collective overview of the first-year deployment plans. The Joint Office will utilize the summary of these plans to inform program improvement and future technical assistance activities to support the states as they begin to implement their EV charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Intelligent, grid-friendly, modular extreme fast charging system with solid-state DC protection

The development of electric vehicle (EV) charging infrastructure is crucial for the widespread adoption of electric transportation. However, implementing such infrastructure is a complex task that requires consideration of factors such as space limitations, adherence to industry standards, grid capacity, and other technical and policy issues. This project seeks to create a framework for the efficient design of compact medium voltage (MV) extreme fast charging (XFC) stations for EVs. The station design involves the use of a solid-state transformer (SST) that connects to the MV distribution network, delivering power to a shared DC bus. This innovative approach eliminates the need for a step-down transformer to provide low-voltage service by connecting directly to the MV distribution network. Eliminating the low-frequency transformer not only reduces the system footprint and losses but also eliminates inrush currents during grid black-start. Additionally, placing power electronics directly on the distribution system allows for high-bandwidth filtering and power factor correction. The inclusion of a shared DC bus enables multiple charging dispensers and DC storage/generation units to connect, forming a DC microgrid. This setup facilitates power sharing with minimal conversion stages. The project showcases a DC distribution network protected by intelligent solid-state (SS) DC circuit breakers (DCCB) capable of isolating the smallest section of the faulted circuit much faster than existing mechanical solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

I-80 Mid-America Clean Fuels Corridor: Deployment Plan Report

The I-80 Mid-America Clean Fuels Corridor, which spans I-80 from Fort Lee, New Jersey, to Council Bluffs, Iowa, was designated an Alternative Fuels Corridor (AFC) in Round 1 of the Alternative Fuels Corridor program administered by the U.S. Department of Transportation’s (DOT’s) Federal Highway Administration (FHWA). Originally called the “I-80 Mid-America Alternative Fuels Corridor,” it is now named the “I-80 Mid-America Clean Fuels Corridor.” As of Round 6 AFC designation, parts of the corridor have sufficient direct current fast charging (DCFC) stations to be designated Electric Vehicle (EV)-Ready and sufficient compressed natural gas (CNG) fueling stations to be designated CNG-Ready. However, much of the corridor’s approximately 1,240 miles (mi) are not yet EV- or CNG-Ready. This includes about 1,130 mi that are designated EV-Pending and 700 mi that are designated CNG-Pending. This report presents a plan to develop EV charging and CNG fueling infrastructure sufficient to convert the entire length of the corridor to EV-Ready and CNG-Ready. Specific sites are not identified for future infrastructure. Rather, priority exits are identified, and information, analysis, and additional steps are recommended to support further refinement of these locations, as well as additional outreach and deployment efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Levelized Cost of Charging Electric Vehicles

This data set includes the levelized cost of charging (LCOC) and lifetime fuel cost savings (LFCS) values as reported in "Levelized Cost of Charging of Electric Vehicles in the United States." Values are reported at the state and national levels for battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs). The data set also includes the four annual direct current fast charging (DCFC) station load profiles used to approximate the levelized cost of DCFC charging. Each profile provides 15-min resolved power requirements for one full year. Borlaug, B., Salisbury, S., Gerdes, M., and Muratori, M., Levelized Cost of Charging Electric Vehicles in the United States, Joule (2020), https://doi.org/10.1016/j.joule.2020.05.013.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DCFC + Hydrogen Station Design Optimization [Slides]

Both direct current fast charging (DCFC) and Hydrogen stations are working to create successful long-term business models; however, analyses for DCFC and hydrogen fueling infrastructure are almost always performed separately. This work provides a detailed exploration of the benefit of integrating DCFC and hydrogen stations to lower the total system cost from load balancing and equipment cost sharing. To achieve this we have adapted the REopt optimization framework to simultaneously optimize the design and operation of integrated DCFC and H2 fueling station. Results indicate that 1) combining hydrogen fueling and DCFC stations can significantly reduce lifetime costs compared to separated stations. 2) Co-location with additional site load reduces DCFC costs, however, integration of DCFC with hydrogen provides an even greater cost reduction. 3) Adding PV to combined stations further reduces the lifetime station cost. 4) Capital investments in station combination today can help reduce the cost of operating DCFC tomorrow and 5) product diversification acts as a hedge against variability and enables a more dynamic response to market changes.

08 HYDROGEN↗

Charging Infrastructure Technologies: Development of a Multiport, >1 MW Charging System for Medium- and Heavy-Duty Electric Vehicles

Development of a Multiport, >1 MW Charging System for Medium- and Heavy-Duty Electric Vehicles project will develop research tools for a framework to design, optimize, and demonstrate key components of a multi-port 1+ MW medium-voltage connected charging system. The objectives of this effort are to develop strategies and technologies for multi-port 1+ MW grid-connected stations to recharge MD/HD electric vehicles at fast-charging travel plazas or at fleet depots; through industry engagement, charging station utilization and load analysis, grid impacts and interconnection analysis, detailed power electronics component design and controller demonstration, site and battery charge control design and controller demonstration; and charging connector design.

1+MW charging↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of electric vehicle charging on the power demand of retail buildings

As electric vehicle penetration increases, charging is expected to have a significant impact on the grid. Electric vehicle charging stations will greatly affect a building site's power demand, especially with the onset of fast charging with power levels as high as 350 kW per charger. Here, we assess how electric vehicle charging stations would impact a retail big box grocery store, exploring numerous station sizes, charging power levels, and utilization factors in various climate zones and seasons. We measure the effect of charging by assessing changes in monthly peak power demand, electricity usage, and annual electricity bill, computed using three distinct rate structures. We find that an electric vehicle station has the potential to dwarf a big box building's power demand if behind the same meter, increasing monthly peak power demand at the site by over 250%. Cold-climate areas paired with rate structures incorporating high demand charges are most susceptible for significant changes to the annual electricity bill, with increases as high as 88%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fast Charging Infrastructure for Electrifying Road Trips to and from National Parks in the Western United States

National parks in the Western United States draw over 80 million visitors every year, and most visitors rely on personal cars for their road trips (or long-distance travels). Travel to national parks represents distinct travel demand, as they are typically located in remote areas necessitating long-distance trips. This study investigates the quantity and locations of on-route fast charging infrastructure needed by 2030 to enable seamless travel to/from national parks using electric vehicles in seven target states in the region, employing unprecedented high-resolution spatial and temporal analysis. We find that the required number of fast charging ports for on-route charging infrastructure ranges from 1,200 to 22,000, depending on different assumptions of key input parameters - vehicle electrification rate, charging behavior, average gap between charging stations, port utilization rate, and towing trailers. Our analysis also indicates that electrical load for on-route fast charging infrastructure would peak in the afternoon, in the range of 70-400 MW, varying with the key input parameters. This study illustrates how different input parameters result in different degrees of impact on various aspects of charging infrastructure. We also examine the characteristics of projected charging infrastructure in terms of land use type, relationship with traffic volume, size of stations, and other variables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Energy Storage for Electric Vehicle Charging Stations

This help sheet provides information on how battery energy storage systems can support electric vehicle (EV) fast charging infrastructure. It is an informative resource that may help states, communities, and other stakeholders plan for EV infrastructure deployment, but it is not intended to be used as guidance, set policy, or establish or replace any standards under state or federal law.

ADVANCED PROPULSION SYSTEMS↗

Cosmic Ray Energetics and Mass (CREAM)

The CREAM instrument was flown on a Long Duration Balloon in Antarctica in December 2004 and January 2005, achieving a flight duration record of nearly 42 days. It detected and recorded cosmic ray primary particles ranging in type from hydrogen to iron nuclei and in energy from 1 TeV to several hundred TeV. With the data collected we will have the world's best measurement of the energy spectra and mass composition of nuclei in the primary cosmic ray flux at these energies, close to the astrophysical knee . The instrument utilized a thin calorimeter, a transition radiation detector and a timing charge detector, which also provided time-of-flight information. The responsibilities of our group have been with the timing charge detector (TCD), and with the data acquisition electronics and ground station support equipment. The TCD utilized fast scintillators to measure the charge of the primary cosmic ray before any interactions could take place within the calorimeter. The data acquisition electronics handled the output of the various detectors, in a fashion fully integrated with the payload bus. A space-qualified flight computer controlled the acquisition, and was used for preliminary trigger information processing and decision making. Ground support equipment was used to monitor the health of the payload, acquire and archive the data transmitted to the ground, and to provide real-time control of the instrument in flight.

Coutu, Stephane↗

Electric vehicle fast charging infrastructure planning in urban networks considering daily travel and charging behavior

Electric vehicles are a sustainable substitution to conventional vehicles. This work introduces an integrated framework for urban fast charging infrastructure to address the range anxiety issue. A mesoscopic simulation tool is developed to generate trip trajectories, and simulate charging behavior based on various trip attributes. The resulting charging demand is the key input to a mixed-integer nonlinear program that seeks charging station configuration. The model minimizes the total system cost including charging station and charger installation costs, and charging, queuing, and detouring delays. The problem is solved using a decomposition technique incorporating a commercial solver for small networks, and a heuristic algorithm for large-scale networks, in addition to the Golden Section method. The solution quality and significant superiority in the computational efficiency of the decomposition approach are confirmed in comparison with the implicit enumeration approach. Furthermore, the required infrastructure to support urban trips is explored for future market shares and technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improving Resiliency in Planning MW-Scale Medium and Heavy Duty EV Charging Stations Considering TSCOTS Optimization

Electrification of heavy-duty (HD) vehicles marks an important milestone and technical challenge in the electric vehicle (EV) industry and the public grid. However, implementing EV charging at this scale will necessitate that traditional truck stops be updated with EV charging infrastructure that could represent 10's of MW in electricity consumption. Furthermore, as the transportation sector is represented as critical infrastructure, supporting resiliency considerations in EV charging infrastructure will be critical. This paper proposes an optimization-based approach for optimally designing a MW-scale microgrid charging network. This approach transforms conventional designed truck stops into a reliable HDEV charging stations capable of overnight slow charging and 30-minute to 1 hour fast charging. Using a mixed-integer linear program formulation blending capacity planning and reliability constraints, an optimal network configuration can be solved for a proposed EV charging station that includes photovoltaic and battery energy storage capabilities.

Ponce, Moises [University of Tennessee, Knoxville ↗

A Framework to Analyze the Requirements of a Multiport Megawatt-Level Charging Station for Heavy-Duty Electric Vehicles

Widespread adoption of heavy-duty (HD) electric vehicles (EVs) will soon necessitate the use of megawatt (MW)-scale charging stations to charge high-capacity HD EV battery packs. Such a station design needs to anticipate possible station traffic, average and peak power demand, and charging/wait time targets to improve throughput and maximize revenue-generating operations. High-power direct current charging is an attractive candidate for MW-scale charging stations at the time of this study, but there are no precedents for such a station design for HD vehicles. We present a modeling and data analysis framework to elucidate the dependencies of a MW-scale station operation on vehicle traffic data and station design parameters and how that impacts vehicle electrification. This framework integrates an agent-based charging station model with vehicle schedules obtained through real-world vehicle telemetry data analysis to explore the station design and operation space. A case study applies this framework to a Class 8 vehicle telemetry dataset and uses Monte Carlo simulations to explore various design considerations for MW-scale charging stations and EV battery technologies. The results show a direct correlation between optimal charging station placement and major traffic corridors such as cities with ports, e.g., Los Angeles and Oakland. Corresponding parametric sweeps reveal that while good quality of service can be achieved with a mix of 1.2-megawatt and 100-kilowatt chargers, the resultant fast charging time of 35–40 min will need higher charging power to reach parity with refueling times.

33 ADVANCED PROPULSION SYSTEMS↗

Universal Battery Supercharger

During the course of the UBS project a dc-fast charger was developed to be used in off board high power charging stations. High efficiency is targeted to reduce the charging price for the consumer while reducing the charge time. In the meantime, the size of the converter is minimized so that it could be used in small spaces and potentially urban areas. The topology is modular, and the power level can be expanded for charging higher power vehicles like trucks and buses. During the course of this research several key technologies was developed in LESES that improve the performance of the power electronics system used in EV charger. Integrated magnetics was developed for DMCR to improve the power density as well as efficiency of the magnetic components which is one of the main bottlenecks of EV development. Triangular mode EV current conduction mode is using to perform soft switching (increase efficiency) without adding any new components to the existing topology. Passive and active damping are developed to suppress the interaction between grid and converter, stabilizing the control system. Further numerous other technical problems have been solved to pave the way for even higher performance converters in the future.

25 ENERGY STORAGE↗