Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “energy-efficient construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

High-bandwidth density silicon photonic resonators for energy-efficient optical interconnects

The growth of artificial intelligence applications demands ever larger and more complex deep learning models, dominating today's—and tomorrow's—data center and high-performance computing systems. While traditional electronics are failing to keep pace with application demands, silicon photonic (SiPh) interconnects have emerged as a necessary technology to support these systems. SiPh-driven wavelength-division multiplexing (WDM) offers a particularly promising path toward supporting incredibly high-aggregate link bandwidth in a compact and efficient form factor. One of the basic building blocks of these integrated WDM interconnects is the SiPh resonator. Their inherent wavelength selectivity and compact footprint allow for efficient data transmission multiplexed across dozens of carrier wavelengths. Used as add-drop (AD) filters, SiPh resonators are critical to constructing integrated tunable wavelength-selective optical circuit switches as well as for demultiplexing the different carrier wavelengths toward independent wavelength-insensitive photodiodes in a dense wavelength-division multiplexing receiver. Resonators in the all-pass (AP) configuration are widespread as well, allowing for wavelength-selective modulation to drive aggregate link bandwidths far beyond the individual channel data rate. Unlike SiPh Mach–Zehnder modulators (MZM), resonant modulators can be driven using low, complementary metal-oxide-semiconductor drive voltages, allowing for tight co-integration between photonic integrated circuits, fabricated with larger process node technologies, and electronic integrated circuits, designed to exploit the advantages of the latest node. To push toward practical peta-scale interconnects, a comprehensive review of SiPh resonators is required, addressing bottlenecks and design constraints at both the architecture and device levels. We first describe the predominant integrated link architectures and identify their limits. We then discuss the device-level design considerations that can be made for both AD and AP configuration resonators to overcome the system level limits with novel resonator device designs. Analytical models and numerical simulation of resonators are validated by experimental measurement of devices fabricated in a commercial 300-mm foundry, showing a clear path toward volume manufacturing. The demonstrated resonant modulators and filters support the feasibility of increasing the aggregate bandwidth of resonator-driven SiPh interconnects into the peta-scale regime.

42 ENGINEERING↗

Investigation of the Cyanothece nitrogenase cluster in Synechocystis : a blueprint for engineering nitrogen-fixing photoautotrophs

ABSTRACT The nitrogenase gene cluster of unicellular diazotrophic cyanobacteria, such asCyanothece, is frequently selected by nature for nitrogen-fixing partnerships with eukaryotic phototrophs. The essential cluster components that confer an advantage in such partnerships remain underexplored. To use this cluster for the development of synthetic, phototrophic nitrogen-fixing systems, a thorough and systematic analysis of its constituent genes is necessary. An initial effort to assess the possibility of engineering this cluster into non-diazotrophic phototrophs led to the generation of aSynechocystis6803 strain with significant nitrogenase activity. In the current study, a refactoring approach was taken to determine the dispensability of the non-structural genes in the cluster and define a minimal gene set for constructing a functional nitrogenase for phototrophs. Using a bottom-up strategy, thenifgenes fromCyanothece51142 were re-organized to form new operons. The genes were then seamlessly removed to determine their essentiality in the nitrogen fixation process. We demonstrate that besides the structural genesnifHDK,nifBSUENPVZTXW, as well ashesAB, are important for optimal nitrogenase function in a phototroph. We also show that optimal expression of these genes is crucial for efficient nitrogenase activity. Our findings provide a solid foundation for generating synthetic systems that will facilitate solar-powered conversion of atmospheric nitrogen into nitrogen-rich compounds, a stride toward a greener world. IMPORTANCE Integrating nitrogen fixation genes into various photosynthetic organisms is an exciting strategy for converting atmospheric nitrogen into nitrogen-rich products in a green and energy-efficient way. In order to facilitate this process, it is essential that we understand the fundamentals of the functioning of a prokaryotic nitrogen-fixing machinery in a non-diazotrophic, photoautotrophic cell. This study examines a nitrogenase gene cluster that has been naturally selected on multiple occasions for a nitrogen-fixing partnership by eukaryotic photoautotrophs and provides a basic blueprint for designing a photosynthetic organism with nitrogen-fixing ability.

Microbiology↗

Colorado Residential Retrofit Energy District (CoRRED) Phase I: Final Modeling Results

Electrification of buildings and transportation coupled with increased deployment of distributed energy resources (DERs) has been identified as a key step toward meeting emissions reduction goals across the U.S. Examples of pilot projects that feature innovative, 'smart' electric neighborhoods are largely focused on new construction projects, but there is a need to address the millions of existing homes so that they too may accommodate cleaner yet variable energy production in ways that benefit both the utility grid and the homes' residents. The Colorado Residential Retrofit Energy District (CoRRED) project used building and grid co-simulation tools to model an advanced energy district demonstration in an existing residential neighborhood in Denver, Colorado, and explored how existing building and utility infrastructures can be enhanced with combinations of traditional energy-efficiency retrofit measures and integration of solar panels and other DER technologies to provide better affordability and reliability. We analyzed which packages of DERs most reliably enable demand flexibility in response to a time-of-use (TOU) rate. Our results clearly indicate that incorporating DERs into efficient electrification produces much bigger utility bill savings on an annual basis than efficient electrification without DERs. While electrifying a neighborhood will increase the maximum load, batteries and solar panels can reduce load during peak hours so that the community can be a net producer during peak periods. A remaining challenge is to overcome first cost barriers to implementing energy-efficiency and DER technologies, as modest utility bill savings require long payback periods that are not practical for most homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced HVAC Humidity Control for Hot-Humid Climates

During this project we develop and validate a cost-effective, integrated control solution to improve humidity control and comfort for energy-efficient homes in hot-humid climates. This study focuses on developing a strategy that is effective, field tested, and practical for builders to install with minimal disruption to standard practices. A successful solution would simplify the transition to high-performance humidity control and be the basis for design and installation guidance. By relying on the central system as a starting point, the strategy employed minimizes system complexity and cost for builders, while improving comfort and operating cost for homeowners. The solution strategy was to coordinate the cooling, dehumidification, and ventilation functions of central, ducted HVAC systems to better control indoor humidity, improve occupant thermal comfort, and capture energy savings. The primary strategic goals were to: (1) optimize dehumidification by the central air-conditioning system, particularly during part-load conditions, using conventional equipment with modified control settings and lower system airflows; (2) maximize ventilation during heating/cooling on-cycles, to “bank” and condition outdoor ventilation air, and minimize ventilation during off-cycles; (3) quantify the effectiveness and energy impact of the dehumidification and ventilation strategies, while identifying a metric that would be useful to evaluate latent effectiveness. For the test houses in our study, located in Richmond Hill, Georgia; Houston, Texas; and Monroe, Louisiana we observed: (1) the indoor humidity did not exceed 60% RH during the monitored cooling season for 99% of the time in Richmond Hill, 96% of the time in Houston, and 90% of the time in Monroe; (2) the dehumidification strategy improved the steady-state latent capacity of the HVAC system at design conditions by 16% to 49% at the Houston test house and by 28% to 71% at the Monroe test house, depending on which mode the system was operating in; and (3) the good results at the test houses were primarily due to the amount of time the air-conditioning system operated in ramping or dehumidification modes, or both, particularly during the early cooling season. This study demonstrates that air conditioners or heat pumps with a single-stage compressor can provide good humidity control without the need for a two-stage or variable-stage compressor system. The airflow and control settings for ramping and dehumidification modes are critical to control indoor humidity in hot-humid climates, particularly during part-load and shoulder season conditions. The dehumidification strategy used in this study did not jeopardize the mechanical reliability of the cooling equipment. The strategies used in this study are applicable across various equipment brands, models, and efficiency levels, and also applicable to a broad range of homes in hot-humid climates. Results will vary by specific equipment, location, and house configuration and construction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Novel Electrowinning Reactor for the Energy-Efficient, Low- Cost Production of Rare Earth Metals

This project developed a novel neodymium (Nd) electrowinning reactor for energy-efficient electrowinning of Nd metal. Throughout this project we have developed an alternative chloride based molten salt electrolysis process. Our process lowers the specific electrical energy consumption compared to the state of the art, while producing reusable chlorine gas and eliminating direct CO2 and PFC emissions. Facilities required for implementing the project were setup and designs were finalized, and a standard operating procedure for safe operation of high temperature electrolysis cells was written. The electrowinning reactor was designed and constructed. Electrolysis experiments confirmed the ability to reproducibly electrowin Nd metal on a Mo cathode. The current efficiency for Nd electrowinning was measured as a function of applied current density in the presence of the separator. Successful electrowinning of Nd sponge at high current densities (200 mA/cm2 and above) at a current efficiency >80% was demonstrated using multiple techniques. Stable Nd electrowinning up to 10h at 250 mA/cm2 was demonstrated. All of these design advancements were used to develop a techno-economic and life cycle assessment model that demonstrated that our process could be operated at cost of less than $0.20/kg-Nd (~30% lower compared to state of the art when comparing electrolysis energy cost) with a >20% total reduction in global warming potential compared to the state of the art while generating no direct CO2 or perfluorocarbon emissions.

42 ENGINEERING↗

Reimagining Heating, Ventilation, and Air Conditioning for New Manufactured Homes

Manufactured homes represent one of the most affordable paths to home ownership for American households, but minimum-efficiency equipment and poor-quality home installation can lead to excess energy use and high operating costs. Slipstream, with partners from the Florida Solar Energy Center (FSEC), Northwest Energy Works, and Washington State University, identified and tested manufactured home HVAC innovations targeted for new construction offering the most promising mix of improved energy performance and likelihood of industry uptake.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Updating the Building Science Advisor (BSA): A Tool to Assist in the Design of Durable Building Envelopes

Predicting the moisture durability of building envelope components remains challenging due to multiple influencing factors, including material selection, assembly positioning, local climate conditions, air tightness, interior environment, and construction quality. Building codes increasingly emphasize energy efficiency through enhanced insulation and tighter envelopes but offer limited guidance on moisture durability considerations. Consequently, builders face uncertainty, particularly as new materials and assemblies enter the market.The Building Science Advisor (BSA) is a free, web-based expert system developed to address these challenges by providing actionable insights into the moisture durability and energy efficiency of both new and retrofit wall designs. Recently updated, we are now providing version 3.0 of the tool. BSA features significant user interface improvements, enhancing navigation and user interaction through a refreshed, intuitive design. Additionally, the tool incorporates a newly developed database containing pre-simulated wall assembly cases, significantly reducing response times and improving the accuracy of moisture durability assessments. Furthermore, the updated BSA includes moisture content as a performance criterion, providing users with a more comprehensive understanding of moisture-related durability risks. These enhancements enable rapid, reliable assessments tailored to specific climate zones and local building practices. BSA continues to offer targeted guidance on wall retrofit scenarios and delivers access to an expanded library of location-specific building science resources.This paper describes these key updates, highlighting the enhanced features, expanded capabilities, and overall improvements to user experience and educational content. The paper includes a demonstration that illustrates how the revised BSA effectively supports practitioners in designing durable, energy-efficient building envelope assemblies.

Salonvaara, Mikael [ORNL] (ORCID:0000000318991554)↗

Mitigating Moisture with High-R Walls

Energy-efficient building enclosures are key to decreasing energy load demand and enabling advanced space-conditioning systems for high-performance homes. One efficient enclosure design solution is high-R walls, which feature increased insulation levels as an effective solution for reducing air leakage and permeance of material layers. To increase builder confidence and encourage greater market adoption of high-R walls, Home Innovation Research Labs sought to demonstrate the long-term moisture performance of several high-R wall configurations in cold climate zones. The team monitored 22 newly constructed, occupied homes located throughout climate zones 4–7, where a substantial vapor drive to the exterior is present during the winter.

buildings↗

Unlocking the Path to Decarbonized Building Thermal Systems: Strategies for Designers and Contractors: Preprint

The design and construction community plays a pivotal role in facilitating the transition to decarbonized thermal systems that maintain human comfort while reducing building emissions. Through the U.S. Department of Energy Better Buildings initiative's Design and Construction Allies, a cohort of leading architecture, engineering, and construction firms have identified top ranked barriers that designers and contractors face when implementing solutions for building owners. These barriers to decarbonizing thermal - especially heating - systems include equipment availability; electrical capacity constraints; space allocations; complex system configurations; and lack of experience in designing, installing, and maintaining heat pumps. These impediments significantly amplify the risk and financial burden associated with the adoption of decarbonized solutions. The barriers also decrease the likelihood that designers, contractors, and owners will adopt decarbonization strategies without clear plans and guidance on how to implement these solutions, mitigate risk, and overcome the identified barriers. The National Renewable Energy Laboratory, the Design and Construction Allies, and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers have developed "how to" thermal decarbonization guidance based on best practices. The subjects covered range from the role of energy efficiency in facilitating decarbonized heating solutions to strategies for decarbonizing new and existing heating, ventilating, and air-conditioning systems. The focus is on overcoming barriers so that energy-efficient, electrified buildings - both new and retrofit - become the industry standard. This paper outlines 1) the method used to collect and organize this guidance, 2) industry barriers to decarbonization, and 3) decarbonization techniques that have broad market applicability.

building heating↗

Decarbonizing Building Thermal Systems: A How-to Guide for Heat Pump Systems and Beyond

Buildings account for a substantial portion of carbon emissions, primarily due to the widespread use of fossil fuels in heating systems. Decarbonization of heating is essential to meet climate targets and reduce the environmental impact of buildings. Heat pumps are capable of leveraging renewable energy sources and can provide heating and cooling in an energy-efficient manner. By leveraging heat pump technology, buildings can significantly reduce their carbon footprint, minimize energy consumption, and decrease their reliance on fossil fuels. The design and construction community plays a pivotal role in facilitating the transition to heat pump systems for heating and cooling. However, this transition requires specialized knowledge and expertise. This resource was developed for architects, engineers, and contractors in response to an industry need for a comprehensive technical resource that guides them through the intricacies of heat pump system design, installation, and maintenance. This resource provides detailed information on system sizing, selection of appropriate heat systems, heat sources, and integration with existing building systems. Moreover, it emphasizes best practices for ensuring operational efficiency, system longevity, and reliability. The development of this recourse was a collaborative effort between NREL/DOE Better Buildings Design and Construction Allies and ASHRAE Task Force for Building Decarbonization. This resource is composed of two complimentary portions that will be completed and released on separate time frames. The first portion will be completed and released in 2023, while the second portion will be released in 2024.

building thermal systems↗

Advanced Manufactured Home Case Study: A Collaboration for High-Efficiency, Affordable Housing

The introduction of Zero Energy Ready Home Manufactured Homes (ZERH MH) qualification for manufactured homes has generated significant attention and interest in the industry to employ advanced manufacturing techniques. VEIC engaged with Titan Homes to create an advanced manufactured home design that employs ZERH standards, other client-driven above-code standards, and manufacturing processes improvements. This case study identifies specific energy-efficient and quality improvement measures that were implemented to achieve certification and take advantage of incentives for home manufacturers.

14 SOLAR ENERGY↗

The relative importance of building design parameters in reducing energy use and sensible heat release from buildings in light of forecasted future weather data and building coverage ratio

Buildings typically have a 60-to-75-year lifespan before they require significant maintenance or modifications. However, most builders evaluate the performance of their new buildings using whole-building energy simulation tools based on the current typical meteorological year (TMY) file or actual meteorological year. The energy use consumption and sensible heat release pattern observed from buildings could potentially change based on shifting global climates. Therefore, the recommended energy-efficiency design parameters might also change during these periods. In this study, we evaluate the role of different building design parameters, such as material reflectivity, HVAC COP, and insulation values, on building energy usage and sensible heat release from buildings with different building coverage ratios (BCR), based on the current and future weather file TMY (fTMY) for the middle of the century (2040–2060). The role of sensible heat release from buildings is not accounted for accurately while estimating building energy usage in most whole-building energy simulations. The study conducts a series of whole-building energy simulation analyses using EnergyPlus to evaluate the role of different design parameters based on TMY and fTMY weather conditions. The analysis is conducted for two hot desert climatic cities: Phoenix (USA) and Abu Dhabi (UAE). The results show that, for the base case in a future climate, the sensible heat release is reduced by an average of 30% due to the reduced delta T between the surface and ambient air. Further, the results show an increase in total energy consumption by 5% annually. The results also show that, for buildings with traditional coatings, shorter buildings release more heat than taller buildings. On the other hand, for buildings with reflective paints, shorter buildings release less heat than taller buildings. The findings from this study can be used by policymakers, utility companies, and builders to better understand the relative role of different building design parameters while constructing new and retrofitting existing buildings.

Alhazmi, Mansour [King Fahd University of Petroleu↗