Engineering PapersSearch

SEARCH · Engineering Papers

Results for “electricity grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Propulsion Electric Grid Simulator (PEGS) for Future Turboelectric Distributed Propulsion Aircraft

NASA Glenn Research Center, in collaboration with the aerospace industry and academia, has begun the development of technology for a future hybrid-wing body electric airplane with a turboelectric distributed propulsion (TeDP) system. It is essential to design a subscale system to emulate the TeDP power grid, which would enable rapid analysis and demonstration of the proof-of-concept of the TeDP electrical system. This paper describes how small electrical machines with their controllers can emulate all the components in a TeDP power train. The whole system model in Matlab/Simulink was first developed and tested in simulation, and the simulation results showed that system dynamic characteristics could be implemented by using the closed-loop control of the electric motor drive systems. Then we designed a subscale experimental system to emulate the entire power system from the turbine engine to the propulsive fans. Firstly, we built a system to emulate a gas turbine engine driving a generator, consisting of two permanent magnet (PM) motors with brushless motor drives, coupled by a shaft. We programmed the first motor and its drive to mimic the speed-torque characteristic of the gas turbine engine, while the second motor and drive act as a generator and produce a torque load on the first motor. Secondly, we built another system of two PM motors and drives to emulate a motor driving a propulsive fan. We programmed the first motor and drive to emulate a wound-rotor synchronous motor. The propulsive fan was emulated by implementing fan maps and flight conditions into the fourth motor and drive, which produce a torque load on the driving motor. The stator of each PM motor is designed to travel axially to change the coupling between rotor and stator. This feature allows the PM motor to more closely emulate a wound-rotor synchronous machine. These techniques can convert the plain motor system into a unique TeDP power grid emulator that enables real-time simulation performance using hardware-in-the-loop (HIL).

electric power grid emulator

Heat Battery for Electrical Grid Energy

In this paper, the fundamental principles from the Georgetown Systems Engineering Fundamentals course will be leveraged to provide a viable solution to the problem of providing cost effective energy storage for renewable electricity generation. As described in the need statement, this is necessary due to the non-dispatchable nature of renewable energy sources. Upon describing the need, several key stakeholders were identified, who may or may not directly interact with the system. They provided several characteristics and capabilities that the system should contain, as well as specific key acceptance criteria which serve as a pass/fail metric for the concept selection process. Out of three different concepts, a Pugh matrix was used to determine that a heat battery system would be the right fit for the scope of work needing to be done.

25 ENERGY STORAGE

Electric Grid and Markets 101 [Slides]

This presentation covers aspects of operating the bulk power system with a focus on the regulatory levels of the US grid at a pretty introductory level. It was meant ot help inform a request from USDA for a "101" presentation that spoke to how electricity markets, contracting and regulation interact with the engineering and physics of operating the bulk power system. They are presently moving to being able to more directly fund PPAs or other non-co-op owned assets for member co-ops, is my understanding.

24 POWER TRANSMISSION AND DISTRIBUTION

Architecture, Voltage, and Components for a Turboelectric Distributed Propulsion Electric Grid

The development of a wholly superconducting turboelectric distributed propulsion system presents unique opportunities for the aerospace industry. However, this transition from normally conducting systems to superconducting systems significantly increases the equipment complexity necessary to manage the electrical power systems. Due to the low technology readiness level (TRL) nature of all components and systems, current Turboelectric Distributed Propulsion (TeDP) technology developments are driven by an ambiguous set of system-level electrical integration standards for an airborne microgrid system (Figure 1). While multiple decades' worth of advancements are still required for concept realization, current system-level studies are necessary to focus the technology development, target specific technological shortcomings, and enable accurate prediction of concept feasibility and viability. An understanding of the performance sensitivity to operating voltages and an early definition of advantageous voltage regulation standards for unconventional airborne microgrids will allow for more accurate targeting of technology development. Propulsive power-rated microgrid systems necessitate the introduction of new aircraft distribution system voltage standards. All protection, distribution, control, power conversion, generation, and cryocooling equipment are affected by voltage regulation standards. Information on the desired operating voltage and voltage regulation is required to determine nominal and maximum currents for sizing distribution and fault isolation equipment, developing machine topologies and machine controls, and the physical attributes of all component shielding and insulation. Voltage impacts many components and system performance.

electric faults

Design and Prototyping of Advanced Control Systems for Advanced Reactors Operating in the Future Electric Grid (Final Report)

Despite its significant advantages as a baseload, low-carbon energy source, the U.S. nuclear power industry has faced increasing difficulties in maintaining economic competitiveness in a rapidly evolving energy market. The economic conditions faced by the current fleet of nuclear power plants (NPPs) in the U.S. deregulated electricity market require a concerted effort to mitigate specific cost factors. Many units are struggling to stay competitive, and some premature shutdowns have occurred. Besides, in response to the large penetration of renewable energy sources, the role of nuclear power plants as pure baseload units needs to be reconsidered. Based on these experiences, operational flexibility is considered a fundamental requirement for the next generation of nuclear reactors to be competitive in the future energy market. The deployment of advanced reactors capable of operating within a new power grid paradigm, known as the Integrated Energy System (IES) was investigated. This approach combines new reactor designs with Thermal Energy Storage (TES) technologies, allowing the nuclear reactor to maintain a steady power output without the need for constant adjustments in response to load demand fluctuations. With this configuration, the reactor operates as a baseload unit, experiencing only very gradual power transients, while the energy storage facility within the power conversion cycle acts as a peaking unit.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Valuing Maintenance Strategies for Fusion Plants as Part of a Future Electricity Grid

Scheduled maintenance is likely to be lengthy and therefore consequential for the economics of fusion power plants. The maintenance strategy that maximizes the economic value of a plant depends on internal factors such as the cost and durability of the replaceable components, the frequency and duration of the maintenance blocks, and the external factors of the electricity system in which the plant operates. Here, this paper examines the value of fusion power plants with various maintenance properties in a decarbonized United States Eastern Interconnection circa 2050. Seasonal variations in electricity supply and demand mean that certain times of year, particularly spring to early summer, are best for scheduled maintenance. Seasonality has two important consequences. First, the value of a plant can be 15% higher than what one would naively expect if value were directly proportional to its availability. Second, in some cases, replacing fractions of a component in shorter maintenance blocks spread over multiple years is better than replacing it all at once during a longer outage, even through the overall availability of the plant is lower in the former scenario.

power plant, maintenance, seasonality, electricity

How the Availability and Cost of Water Could Influence the Future Buildout of the Electric Grid in the U.S.

The power sector is the largest water withdrawer in the U.S., and water availability can drive both its investment and operating decisions. Given a range of uncertain trends in the power sector, it's important to consider how water demands might evolve from both generation and load change and how the cost and availability of water might impact water source decisions. Doing so requires a detailed consideration of technology-specific water needs, water availability characterization, and scenario exploration. This presentation describes capabilities to do so in unprecedented detail and some preliminary findings about how water constraints could influence power sector expansion.

24 POWER TRANSMISSION AND DISTRIBUTION

Multidisciplinary Design, Analysis, and Optimization (MDO) for Co-Designed Transmission & Distribution Electric Grid Planning

This paper describes early experiences and example use cases applying multi-disciplinary design analysis and optimization (MDO) to the integrated design of power grids. Adapted from aerospace, MDO enables combining multiple existing tools into a coordinated optimization. Here we use MDO to simultaneously capture integrated transmission-distribution and investment-engineering trade-offs in an automated framework. Example use cases showcase prototype interactions among existing grid models using MDO and hint at the types of integrated analyses enabled by this approach. In addition, we share experiences and thoughts on grid-specific challenges and opportunities to help advance further work in this area.

24 POWER TRANSMISSION AND DISTRIBUTION

Electric Grid Simulator For Human Factor Research

The developed code simulates real-time monitor and control for west area of IEEE 118-bus system. The 24-hour load profile for each bus is derived by scaling the system’s rated load in the PSSE sav file according to the California Independent System Operator’s Day-ahead load forecast for May 1, 2024. This simulator performs several critical functions: (1) Calculating time-series power flow every 4 seconds; (2) Updating and dispatching AGC signals every minute; (3) Conducting N-1 contingency analysis every 5 minutes. Additionally, the simulator can trip lines and subsequently update and dispatch AGC signals, running power flow analysis after each tripping event.

Huang, Jianqiao [Idaho National Laboratory (INL),

Accelerating computing for the future electric grid (CRADA Final Report)

As a participant in the Cyclotron Road Lab-Embedded Entrepreneurship Program (LEEP), Vellex Computing, Inc. has successfully validated the "Vellex Computing Stack," a breakthrough Analog Neural Computer (ANC) specifically designed for high-performance edge optimization. This project achieved critical milestones in mixed-signal circuit stability and software-hardware co-design, directly addressing national priorities in semiconductor resiliency. The success of this work is deeply rooted in the support from the Cyclotron Road LEEP, which provided the essential "hard tech" runway—funding, mentorship, and access to Lawrence Berkeley National Laboratory’s world-class characterization facilities—allowing Vellex to overcome the "Valley of Death" often faced by deep-tech hardware startups. By leveraging LBNL’s advanced testing infrastructure, Vellex was able to rigorously benchmark the ANC architecture against state-of-the-art digital solutions, a feat that would have been resource-prohibitive independently. This collaboration has not only advanced American leadership in analog computing but has also matured Vellex’s technology to a stage ripe for private sector commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION

An Overview of Arizona's Electric Grid Resilience Using TASTI-GRID

This document provides a concise overview of the analytical capabilities of the TASTI-GRID team. Utilizing additional data and resources, it synthesizes platform insights to present a distinct perspective on investing in grid resilience throughout Mississippi. This document is not intended to influence or direct state- level decisions related to investments in grid resilience and reliability. TASTI-GRID should not be used for real-time monitoring, supporting the ESF #12 emergency response functions, or predicting the restoration times for outages.

24 POWER TRANSMISSION AND DISTRIBUTION